Record Throughput as it Transitions to 1,250 mtpd

Ad blocking detected

Thank you for visiting CanadianInsider.com. We have detected you cannot see ads being served on our site due to blocking. Unfortunately, due to the high cost of data, we cannot serve the requested page without the accompanied ads.

If you have installed ad-blocking software, please disable it (sometimes a complete uninstall is necessary). Private browsing Firefox users should be able to disable tracking protection while visiting our website. Visit Mozilla support for more information. If you do not believe you have any ad-blocking software on your browser, you may want to try another browser, computer or internet service provider. Alternatively, you may consider the following if you want an ad-free experience.

Canadian Insider Ultra Club
$432/ year*
Daily Morning INK newsletter
+3 months archive
Canadian Market INK weekly newsletter
+3 months archive
30 publication downloads per month from the PDF store
Top 20 Gold, Top 30 Energy, Top 40 Stock downloads from the PDF store
All benefits of basic registration
No 3rd party display ads
JOIN THE CLUB

* Price is subject to applicable taxes.

Paid subscriptions and memberships are auto-renewing unless cancelled (easily done via the Account Settings Membership Status page after logging in). Once cancelled, a subscription or membership will terminate at the end of the current term.

Record Throughput as it Transitions to 1,250 mtpd



London, England - Newfoundland and Labrador, Canada (FSCwire) - Rambler Metals and Mining plc (TSXV: RAB, AIM: RMM) ("Rambler" or "the Company"), a copper and gold producer, explorer, and developer is pleased to announced that for the month of November 2017 it processed 33,870 tonnes of ore from the Ming Mine through the Nugget Pond mill, averaging 1,221 metric tonnes per day ("mtpd") during operational hours. November's performance represents record monthly throughput for the operation.

 

November 2017 Production Summary

 

  • During November, the Nugget Pond copper and gold milling facility achieved record throughput. The facility processed 33,870 dry metric tonnes ('dmt') at a feed grade of 1.19% copper and 0.75 g/t gold, averaging 1,221 mtpd during operational hours, including 17 days running at an average of 1,260 mtpd.
  • At the mine, ore delivered to surface averaged 1,140 mtpd during the month, with several underground development headings nearing key production areas. The operation plans to produce an average of 1,125 mtpd during December and January as it completes the final upgrades to the ventilation system, which will in turn allow for increased activity and faster clearing times in the mine.
  • Recovery of metal to concentrate was in line with expectations and guidance returning 96.4% and 61.2% for copper and gold respectively. Production of concentrate was 1,376 dmt containing saleable metal of 374 tonnes of copper and 449 ounces of gold.
  • Targeting record mill throughput in Q4 reaching 100,000 dmt of ore delivering approximately 2.4M pounds of saleable copper and 1,375 ounces of salable gold.

 

To view the full announcement, please click on the following link.

http://www.rns-pdf.londonstockexchange.com/rns/7194Z_1-2017-12-18.pdf



To view this press release as a PDF file, click onto the following link:
public://news_release_pdf/Rambler12192017.pdf

Source: Rambler Metals and Mining plc (TSX Venture:RAB, AIM:RMM)

To follow Rambler Metals and Mining plc on your favorite social media platform or financial websites, please click on the icons below.


 

Maximum News Dissemination by FSCwire. http://www.fscwire.com

 

Copyright © 2017 FSCwire





Comment On!

140
Upload limit is up to 1mb only
To post messages to your Socail Media account, you must first give authorization from the websites. Select the platform you wish to connect your account to CanadianInsider.com (via Easy Blurb).