Rambler Metals & Mining PLC: 2nd Quarter Production Results & Updated Guidance

Ad blocking detected

Thank you for visiting CanadianInsider.com. We have detected you cannot see ads being served on our site due to blocking. Unfortunately, due to the high cost of data, we cannot serve the requested page without the accompanied ads.

If you have installed ad-blocking software, please disable it (sometimes a complete uninstall is necessary). Private browsing Firefox users should be able to disable tracking protection while visiting our website. Visit Mozilla support for more information. If you do not believe you have any ad-blocking software on your browser, you may want to try another browser, computer or internet service provider. Alternatively, you may consider the following if you want an ad-free experience.

Canadian Insider Ultra Club
$432/ year*
Daily Morning INK newsletter
+3 months archive
Canadian Market INK weekly newsletter
+3 months archive
30 publication downloads per month from the PDF store
Top 20 Gold, Top 30 Energy, Top 40 Stock downloads from the PDF store
All benefits of basic registration
No 3rd party display ads
JOIN THE CLUB

* Price is subject to applicable taxes.

Paid subscriptions and memberships are auto-renewing unless cancelled (easily done via the Account Settings Membership Status page after logging in). Once cancelled, a subscription or membership will terminate at the end of the current term.

Rambler Metals & Mining PLC: 2nd Quarter Production Results & Updated Guidance

BAIE VERTE, NL--(Marketwired - Jul 27, 2017) - Rambler Metals & Mining PLC (TSX VENTURE: RAB) (LSE: RMM)

TSXV: RAB, AIM: RMM
27 July 2017

Rambler Releases Second Quarter Production Results &
Provides Updated Guidance

London, England - Newfoundland and Labrador, Canada - Rambler Metals and Mining plc (TSXV: RAB, AIM: RMM) ("Rambler" or "the Company"), a copper and gold producer, explorer, and developer today provides production results for the second quarter ended 30 June 2017 ('Q2/17').

Q2/17 PRODUCTION SUMMARY

  • Copper feed grade for the quarter was 1.41% with a gold grade of 0.67 g/t, both in line with guidance. Total mill throughput for the period ending 30 June 2017 was 86,895 dry metric tonnes ('dmt'), a new quarter record and a 15% increase over the previous quarter; 29% increase over the same quarter F2016.

  • During the period the copper milling facility averaged 1,077 metric tonnes per day ('mtpd') during operational hours. This is a significant increase over the previous quarter and with the final modifications to the mill's grinding circuit now complete, this facility is ready to test a sustained 1,250 mtpd mill feed.

  • Underground development into the Lower Footwall Zone continued at the mine during the quarter. Overall development is approximately 2 months behind schedule, however, monthly average development meters have increased significantly quarter over quarter with the operation hitting forecasted development meters during the quarter. It is anticipated that the 1,250 mtpd target will incur a slight delay but will be achieved during the fall of 2017.

  • Average recoveries to concentrate for the quarter were: copper 94.2% and gold 56.5% with a concentrate grade of 26.6% and 7.7 g/t for copper and gold respectively.
    • The mill produced 4,359 dmt of concentrate, a 49% increase over Q1/17, containing saleable metal of 1,112 tonnes of copper and 939 ounces of gold. This represents a 40% and 140% increase respectively over the previous quarter, Q1/17.

Please see the associated PDF to view the announcement in full
http://www.rns-pdf.londonstockexchange.com/rns/2697M_1-2017-7-27.pdf

Contact:
RNS
Customer Services
0044-207797-4400
[email protected]
http://www.rns.com

Comment On!

140
Upload limit is up to 1mb only
To post messages to your Socail Media account, you must first give authorization from the websites. Select the platform you wish to connect your account to CanadianInsider.com (via Easy Blurb).