Melkior Announces Final Carscallen Drill Results and Drill Permit

Ad blocking detected

Thank you for visiting CanadianInsider.com. We have detected you cannot see ads being served on our site due to blocking. Unfortunately, due to the high cost of data, we cannot serve the requested page without the accompanied ads.

If you have installed ad-blocking software, please disable it (sometimes a complete uninstall is necessary). Private browsing Firefox users should be able to disable tracking protection while visiting our website. Visit Mozilla support for more information. If you do not believe you have any ad-blocking software on your browser, you may want to try another browser, computer or internet service provider. Alternatively, you may consider the following if you want an ad-free experience.

Canadian Insider Ultra Club
$432/ year*
Daily Morning INK newsletter
+3 months archive
Canadian Market INK weekly newsletter
+3 months archive
30 publication downloads per month from the PDF store
Top 20 Gold, Top 30 Energy, Top 40 Stock downloads from the PDF store
All benefits of basic registration
No 3rd party display ads
JOIN THE CLUB

* Price is subject to applicable taxes.

Paid subscriptions and memberships are auto-renewing unless cancelled (easily done via the Account Settings Membership Status page after logging in). Once cancelled, a subscription or membership will terminate at the end of the current term.

(TheNewswire)



 

Highlights:

  • - 14.76 g/t Gold over 2.0 Meters (m), Including 60.5 g/t Au over 0.5m, 8.93 g/t Au over 3.0m, 6.85 g/t Au over 4.1m, 7.79 g/t Au over 2.0m and 6.18 g/t Au over 2.0m.

    - Drilling is estimated to resume during Q2 2021, with 3,500 meters currently budgeted for the remainder of the year.

 

May 12, 2021 - TheNewswire - Timmins, Ontario - Melkior Resources Inc. (“Melkior” or the “Company”) (TSXV:MKR) (OTC:MKRIF) is pleased to announce the full results from 5,618.0 meters of drilling and its’ renewed drill permit on the Carscallen Gold project located approximately 25 kilometers southwest of Timmins Ontario.

 

Drill Permit:

Melkior is pleased to announce a new drill permit has been awarded for the Carscallen Project, which significantly expands the prior permit that required us to cut the 6,600m drill program short. The newly permitted holes can be seen below:


Click Image To View Full Size

 

The proposed holes target the following:

  • - Group 1: These target infill drilling to connect the Zam Zam and Shenkman Zones in line with Melkior’s goal of working towards a maiden resource.

    - Group 2: This drilling targets following up on the 250-meter step-out discovery hole of 5.63gpt over 9.5m (CAR-20-06).

    - Group 3: This drilling is focused on exploring the property-wide gold trend/target of 2.6km.

 

Jonathon Deluce, CEO of Melkior, remarks, “I am excited to announce receiving our new drill permit and final results from Carscallen. I greatly appreciate the ongoing support and partnership with the Mattagami First Nation and the MNDM. The now permitted drill holes are aligned with Melkior’s goal of moving towards a maiden resource and exploring the overall 2.6km targeted trend. The full results from our 5,618-meter program continue to demonstrate the continuity and potential size of our high-grade gold system.”

 

Final Drill Program Highlights:

  • - The Carscallen gold project lies within the township of Carscallen, approximately 25 kilometers southwest of Timmins, Ontario. It is comprised of 295 claim units covering 47 square kilometers with 100% ownership by Melkior.

    - The drill program consisted of 5,618 meters.

 

Significant Assay Table

Hole-ID

From (m)

To (m)

Length (m)

Au (g/t)

Ag (g/t)

Cu (%)

Zn (%)

CAR-20-08

400.5

401.0

0.5

7.39

     

CAR-20-09B

534.5

537.5

3.0

8.93

3.6

 

0.26

Incl.

537.0

537.5

0.5

38.8

     
 

553.0

556.0

3.0

1.92

     

Incl.

555.5

556.0

0.5

5.66

5.0

 

1.1

 

734.5

735.0

0.5

1.26

4.6

 

0.26

 

741.5

742.0

0.5

3.28

4.9

 

0.99

CAR-20-10

408.45

412.6

4.1

6.85

     

Incl.

412.1

412.6

0.5

40.1

     

CAR-20-11

293.7

298.8

5.1

2.25

     

Incl.

293.7

294.2

0.5

12.3

     
 

407.5

408.5

1.0

3.83

     

CAR-21-12

464.5

465.0

0.5

7.46

     
 

480.9

483.0

2.1

14.76

     

Incl.

489.9

481.4

0.5

60.5

55.6

0.13

 

CAR-21-14

376.0

378.0

2.0

6.52

     
 

405.0

407.0

2.0

7.79

     

Incl.

405.0

405.5

0.5

31.0

     

CAR-21-15

327.2

329.3

2.2

1.93

     
 

459.0

461.0

2.0

2.45

     
 

512.0

513.8

1.8

2.54

     

CAR-21-16

614.0

614.5

0.5

4.64

     

* Stated lengths are core lengths as drilled. True widths are estimated to be 80% of reported core length intervals.

** Drill hole CAR-20-07 was terminated early at 177 meters due to intense faulting. CAR-21-13 did not return any significant values.

 

Hole ID

Easting UTM

Northing UTM

Length (m)

DIP

Azimuth

CAR-20-08

451918

5357800

750

-60

240

CAR-20-09B

452026

5357874

804

-62

240

CAR-20-10

452019

5358161

705

-65

240

CAR-20-11

451880

5358018

581

-67

240

CAR-21-12

451979

5358019

654

-75

240

CAR-21-14

451979

5358019

669

-70

278

CAR-21-15

451978

5358020

627

-70

248

CAR-21-16

451979

5358020

651

-78

250

The drill program was performed and managed by Kirkland Lake Gold. The drill core was split with half sent to Actlabs in Timmins, ON, and fire assayed with an AA and gravimetric finish. Whole metallic assays are performed on samples greater than 10 g/t gold and samples containing visible gold. In addition, all seven drill holes were treated with the 1E3 36 element multi-element package with aqua regia analyses. Duplicates, standards, and blanks were inserted into the sample stream.

 

Carscallen Next Steps:

  • - Drilling is estimated to resume during Q2 2021, with a minimum 3,500 meters currently budgeted for the remainder of the year.

    - Historical geophysics review is underway to assist with exploration targeting.  

    - This summer, a field program will be conducted to review the historical trenches in the Zam Zam Zone for structural trends to complement and augment future drilling strategies.

 

Qualified Person

All technical information in this press release has been reviewed and approved by Peter Caldbick, P.Geo. Mr. Caldbick is a consultant for Melkior and a Qualified Person for the purposes of National Instrument 43-101.

 

ON BEHALF OF THE BOARD

Jonathon Deluce, CEO

 

For more information, please contact:

Melkior Resources Inc.

E-mail: [email protected]

Tel: 226-271-5170

 

The reader is invited to visit Melkior's web site www.melkior.com.

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the

TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

     

Copyright (c) 2021 TheNewswire - All rights reserved.