Melkior - Maseres Drilling Has Commenced

Ad blocking detected

Thank you for visiting CanadianInsider.com. We have detected you cannot see ads being served on our site due to blocking. Unfortunately, due to the high cost of data, we cannot serve the requested page without the accompanied ads.

If you have installed ad-blocking software, please disable it (sometimes a complete uninstall is necessary). Private browsing Firefox users should be able to disable tracking protection while visiting our website. Visit Mozilla support for more information. If you do not believe you have any ad-blocking software on your browser, you may want to try another browser, computer or internet service provider. Alternatively, you may consider the following if you want an ad-free experience.

Canadian Insider Ultra Club
$432/ year*
Daily Morning INK newsletter
+3 months archive
Canadian Market INK weekly newsletter
+3 months archive
30 publication downloads per month from the PDF store
Top 20 Gold, Top 30 Energy, Top 40 Stock downloads from the PDF store
All benefits of basic registration
No 3rd party display ads
JOIN THE CLUB

* Price is subject to applicable taxes.

Paid subscriptions and memberships are auto-renewing unless cancelled (easily done via the Account Settings Membership Status page after logging in). Once cancelled, a subscription or membership will terminate at the end of the current term.

(TheNewswire)



January 17, 2019 / TheNewswire / Timmins, Ontario — Melkior Resources Inc. (“Melkior”) is pleased to announce that drilling has commenced on the Maseres Project. The drill contract is for a maximum of 5,000 meters of NQ drilling. Bedrock observations have locally established with reasonable certainty that the bedrock stratigraphy generally strikes parallel to magnetic and electromagnetic trends and dips moderately to the south. Drill holes are currently being drilled parallel to the grid lines and generally perpendicular to lithology.

 

The first drill hole (MS-19-1) has been collared on Line 22+00N at 0+60E, azimuth 045 at an inclination of -54. The hole is expected to be terminated at about 150m. The IP data indicates that there are three parallel targets within the grid area over a considerable strike length. MS-19-1 targets the most northerly of the IP zones and in addition to evaluating this target will establish the bedrock units north of the package of bedrock that hosts the target horizons.

 

The second hole (MS-19-2) is currently planned to step back about 145 meters, on the adjacent line to the north, and target the central anomalous IP zone. Depending on the success of the first hole, MS-19-2 maybe continued to evaluate the northern anomalous zone at depth as well.

 

The third hole (MS-19-3) is currently planned for Line 25+00N and target the southern anomalous zone. Depending on the success of the first hole and second hole, MS-19-3 may be continued to evaluate the central and or northern anomalous IP zones at depth. Taken together these three drill holes should provide a good understanding of the geological setting of the Maseres EM trend and the reason for its response. Future drill hole locations will leverage ongoing results of the completed drill holes and remain somewhat fluid in nature.

 

TMC Geophysics has provided Melkior with revised pseudo-sections and depth slices for the IP survey data in advance of final report delivery. The Melkior website has been updated and includes all of the updated maps and pseudo-sections:

 

IP Maps:

http://www.melkior.com/ip-maps/

 

IP Sections:

http://www.melkior.com/ip/

     

Wade Kornik, P.Geo., has approved the information contained in this release.  Mr. Kornik is the Exploration Manager of the Company and is a Qualified Person as defined by National Instrument 43-101.

  

ON BEHALF OF THE BOARD

Keith James Deluce, CEO

 

For more information, please contact:

Melkior Resources Inc.

E-mail: [email protected]

Tel: 705-267-4000

The reader is invited to visit Melkior's web site www.melkior.com.

 

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the

TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Copyright (c) 2019 TheNewswire - All rights reserved.