Melkior - Maseres Drill Permit Received

Ad blocking detected

Thank you for visiting CanadianInsider.com. We have detected you cannot see ads being served on our site due to blocking. Unfortunately, due to the high cost of data, we cannot serve the requested page without the accompanied ads.

If you have installed ad-blocking software, please disable it (sometimes a complete uninstall is necessary). Private browsing Firefox users should be able to disable tracking protection while visiting our website. Visit Mozilla support for more information. If you do not believe you have any ad-blocking software on your browser, you may want to try another browser, computer or internet service provider. Alternatively, you may consider the following if you want an ad-free experience.

Canadian Insider Ultra Club
$432/ year*
Daily Morning INK newsletter
+3 months archive
Canadian Market INK weekly newsletter
+3 months archive
30 publication downloads per month from the PDF store
Top 20 Gold, Top 30 Energy, Top 40 Stock downloads from the PDF store
All benefits of basic registration
No 3rd party display ads
JOIN THE CLUB

* Price is subject to applicable taxes.

Paid subscriptions and memberships are auto-renewing unless cancelled (easily done via the Account Settings Membership Status page after logging in). Once cancelled, a subscription or membership will terminate at the end of the current term.

(TheNewswire)



 

Timmins, Ontario / TheNewswire / Melkior Resources Inc. (“Melkior”) is pleased to announce receipt of the drilling permit for the for the Maseres Project. The drill permit for the Maseres Project provides for 64 drill set-up areas. The set-up areas permitted are generally centered on areas located approximately 50m south-west of each of the VTEM EM anomalies within the area of the new grid. Priority targets identified from the preliminary IP pseudo sections will be targeted to commence the drill program as soon as practicably feasible.

 

A 46 line-kilometer induced polarization survey is currently being conducted by GÉOPHYSIQUE TMC from Val-d’Or. Data collection for the IP survey is expected to be completed by December 24, 2018. Additional IP pseudo sections have been published on the Melkior website, the most recent being L15+00N (http://www.melkior.com/ip/).

 

Jim Deluce, CEO of Melkior remarks, “Melkior has aggressively advanced the Maseres Project since it was staked in March 2017. To take a project of this magnitude from staking to drill ready status in less than two years is a major accomplishment. All of the geological information we have acquired has reinforced our interpretation that Maseres could be a generational exploration opportunity. The ongoing IP survey is providing us with the detail we need to spot some intelligent drill holes. We intend to have drill core assay results published before our second anniversary. Melkior is committed to building value for its shareholders.”

Wade Kornik, P.Geo., has approved the information contained in this release.  Mr. Kornik is the Exploration Manager of the Company and is a Qualified Person as defined by National Instrument 43-101.

 

ON BEHALF OF THE BOARD

Keith James Deluce, CEO

 

For more information, please contact:

Melkior Resources Inc.

E-mail: [email protected]

Tel: 705-267-4000

 

The reader is invited to visit Melkior's web site www.melkior.com.

 

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the

TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Copyright (c) 2018 TheNewswire - All rights reserved.