Colibri Begins Phase 1 Drilling Program at Flagship Evelyn Gold Project

Ad blocking detected

Thank you for visiting CanadianInsider.com. We have detected you cannot see ads being served on our site due to blocking. Unfortunately, due to the high cost of data, we cannot serve the requested page without the accompanied ads.

If you have installed ad-blocking software, please disable it (sometimes a complete uninstall is necessary). Private browsing Firefox users should be able to disable tracking protection while visiting our website. Visit Mozilla support for more information. If you do not believe you have any ad-blocking software on your browser, you may want to try another browser, computer or internet service provider. Alternatively, you may consider the following if you want an ad-free experience.

Canadian Insider Ultra Club
$432/ year*
Daily Morning INK newsletter
+3 months archive
Canadian Market INK weekly newsletter
+3 months archive
30 publication downloads per month from the PDF store
Top 20 Gold, Top 30 Energy, Top 40 Stock downloads from the PDF store
All benefits of basic registration
No 3rd party display ads
JOIN THE CLUB

* Price is subject to applicable taxes.

Paid subscriptions and memberships are auto-renewing unless cancelled (easily done via the Account Settings Membership Status page after logging in). Once cancelled, a subscription or membership will terminate at the end of the current term.

Dieppe, New Brunswick--(Newsfile Corp. - November 9, 2021) - Colibri Resource Corporation (TSXV: CBI) ("Colibri" or the "Company") is pleased to report that it has started drilling at the Evelyn Gold Project, located in the Caborca Orogenic Gold Belt of northwest Sonora, Mexico. The Drilling rig and equipment arrived on Sunday November 7th and began the first hole yesterday, November the 8th. This marks the beginning of a fully funded two-phase program for up to up to 10,000 metres of drilling at the Evelyn Gold Project and will test a series of targets generated in three separate areas of the property. Phase 1 will consist of up to 5,000 metres of drilling and will take approximately two months to complete.

Ron Goguen, President & CEO of Colibri commented, "We are very pleased to begin drilling at Evelyn. The Company has worked very diligently for over the last 18 months or so to get to this stage at the Evelyn Gold Project and we look forward to seeing these test results. We will report results to the market after the Company receives data and it has been interpreted by our team."

Cannot view this image? Visit: https://orders.newsfilecorp.com/files/4269/102611_9b162d8004b1f816_001.jpg

Figure 1 - Drill Rig and crew at Hole CRW21-001

To view an enhanced version of this graphic, please visit:
https://orders.newsfilecorp.com/files/4269/102611_9b162d8004b1f816_001full.jpg

Drill Plan

Based largely on the distribution of anomalous and higher-grade assay results from surface and trench exposures coincident with magnetic gradients and lineaments and with structures identified through geological mapping, the Company interprets the El Sahuaro and Cerro Rojo as the priority target areas on the property and, as previously reported both are characterized by anomalous to high grade surface sampling coincident with chargeability and resistivity anomalies. The first phase of the drill program will be based largely on surface mapping and sampling with down-dip projection being supported by inversion modelling of both the magnetic and IP datasets.

Evelyn Exploration Model

The exploration model being developed by the Company relates the mineralization consisting of higher-grade veins and veinlets hosted by altered and sulphide bearing lower grade volcanic rocks, to north-northeast trending stratigraphy and layer-parallel fault zones and southeast striking, moderately southwest dipping fault zones.

Evelyn Geology

The Evelyn Gold Project is an Orogenic-type gold target located in the Caborca Gold Belt of northwestern Sonora. The property is located approximately 25 kilometres ("km") east of La Herradura, Mexico's largest open pit orogenic gold mine, which produced 425,288 ounces of gold in 2020 at an average grade of 0.77 grams per tonnes ("g/t") Au and is also approximately 9 km northeast of the Noche Buena mine which produced 87,988 ounces Au at an average grade of 0.52 g/t Au in 2020. The setting and style of mineralization at Evelyn is similar to that reported from La Herradura and Noche Buena. Higher grade mineralization on the Evelyn property consists of quartz veins and veinlets, ranging from 2 - 3 centimeters up to 1.5 m hosted by fault and fracture zones with minor oxidized pyrite, iron oxide, copper bearing oxide and carbonate minerals, and locally minor to trace amounts of galena, chalcopyrite, and sphalerite. Alteration of the host rocks includes iron bearing carbonate minerals, quartz, sericite, and chlorite. Lower grade mineralization is associated with altered volcanic rocks containing minor amounts of oxidized sulfide. Mineralization is hosted dominantly by Jurassic volcanic rocks consisting of andesite and rhyolite.

Qualified Person

Jamie Lavigne, P. Geo and a Director for Colibri is a Qualified Person as defined in NI 43-101 and has reviewed and approved the technical information in this press release.

ABOUT COLIBRI RESOURCE CORPORATION:

Colibri is a Canadian-based mineral exploration company listed on the TSX-V (CBI) and is focused on acquiring and exploring prospective gold & silver properties in Mexico. The Company has six exploration projects of which five currently have exploration programs being executed 2021 and 2022. The flagship Evelyn Gold Project is 100% owned and explored by Colibri. The Company has four additional projects: (1) The Pilar Gold & Silver Project which is under option to Tocvan Ventures (CSE: TOC), the (2) El Mezquite Gold & Silver Project , (3) Jackie Gold & Silver Project, and (4) Diamante Gold & Silver Project are also currently being actively advanced by partner Silver Spruce Resources (TSXV: SSE) who is earning 50% in each of the three projects. Upon SSE earning 50% ownership, SSE and CBI will continue to advance these projects as JV partners.

For more information about all Company projects please visit: www.colibriresource.com.

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Notice Regarding Forward-Looking Statements:

This news release contains "forward-looking statements". Statements in this press release which are not purely historical are forward-looking statements and include any statements regarding beliefs, plans, expectations or intentions regarding the future. Actual results could differ from those projected in any forward-looking statements due to numerous factors. These forward-looking statements are made as of the date of this news release, and the Company assumes no obligation to update the forward-looking statements, or to update the reasons why actual results could differ from those projected in the forward-looking statements. Although the Company believes that the plans, expectations and intentions contained in this press release are reasonable, there can be no assurance that they will prove to be accurate.

For information contact: Ronald J. Goguen, President, Chairperson and Director, Tel: (506) 383-4274, [email protected]

To view the source version of this press release, please visit https://www.newsfilecorp.com/release/102611

Comment On!

140
Upload limit is up to 1mb only
To post messages to your Socail Media account, you must first give authorization from the websites. Select the platform you wish to connect your account to CanadianInsider.com (via Easy Blurb).