Ad blocking detected

Thank you for visiting CanadianInsider.com. We have detected you cannot see ads being served on our site due to blocking. Unfortunately, due to the high cost of data, we cannot serve the requested page without the accompanied ads.

If you have installed ad-blocking software, please disable it (sometimes a complete uninstall is necessary). Private browsing Firefox users should be able to disable tracking protection while visiting our website. Visit Mozilla support for more information. If you do not believe you have any ad-blocking software on your browser, you may want to try another browser, computer or internet service provider. Alternatively, you may consider the following if you want an ad-free experience.

Canadian Insider Ultra Club
$432/ year*
Daily Morning INK newsletter
+3 months archive
Canadian Market INK weekly newsletter
+3 months archive
30 publication downloads per month from the PDF store
Top 20 Gold, Top 30 Energy, Top 40 Stock downloads from the PDF store
All benefits of basic registration
No 3rd party display ads
JOIN THE CLUB

* Price is subject to applicable taxes.

Paid subscriptions and memberships are auto-renewing unless cancelled (easily done via the Account Settings Membership Status page after logging in). Once cancelled, a subscription or membership will terminate at the end of the current term.

Chimata Gold Corp. Completes Planned Drilling Activities and Announces Initial Li2O Assays at Kamativi Tailings Lithium Project

VANCOUVER, British Columbia, Aug. 28, 2018 (GLOBE NEWSWIRE) -- via NEWMEDIAWIRE -- Canadian strategic metals company Chimata Gold Corp. (CSE: CAT) (“Chimata” or the “Company”) is pleased to announce the completion of its drilling program and release of Li2O assay results and it is on track to complete a maiden NI 43-10 Resource Statement at its Kamativi Tailings Lithium Project in Zimbabwe.

High grade Li2O intercepts include:

· Hole KT 99: Length       15.00m @ 1.07% Li2O

· Hole KT 98A: Length     21.70m @ 0.94% Li2O

· Hole KT 108: Length     14.30m @ 0.91% Li2O

· Hole KT 101: Length     24.00m @ 0.89% Li2O

· Hole KT 108A: Length  23.46m @ 0.87% Li2O

· Hole KT 101A: Length  28.50m @ 0.87% Li2O

· Hole KT 107: Length     17.40m @ 0.86% Li2O

· Hole KT 99A: Length    31.50m @ 0.86% Li2O

Resource Drilling Program

The Company is pleased to announce the completion of its initial drilling program at the Kamativi Tailings Lithium Project (the “Project”). The drilling program comprised a total of 114 holes nominally spaced on a 100 x 100m grid pattern drilled vertically through the historic surface tailings facility at the dormant Kamativi Tin Mine, Kamativi, Zimbabwe. The total meters drilled during this program amounted to 1,865m.  The results of the individual hole depths declared, reinforce the Company’s belief and expectation of volume of tailings contained at the tailings storage facility. For details of hole depth refer to Table 1 found in Appendix B.

The Company collected samples for assay throughout the drill campaign. A total of 1,261 samples were taken during the program. The Company is pleased to announce that all assays have been exported to SGS South Africa (Pty) Ltd. All assaying and laboratory analysis has been completed and full intersections with results to date are provided in Table 2 of Appendix C.     (...more)

To Read The Entire News Release Please Follow This Link Below

http://chimatagoldcorp.com/chimata-gold-corp-completes-planned-drilling-activities-and-announces-initial-li2o-assays-at-kamativi-tailings-lithium-project/

Steve Cozine
604-674-3145
[email protected]

Comment On!

140
Upload limit is up to 1mb only
To post messages to your Socail Media account, you must first give authorization from the websites. Select the platform you wish to connect your account to CanadianInsider.com (via Easy Blurb).