Ad blocking detected

Thank you for visiting CanadianInsider.com. We have detected you cannot see ads being served on our site due to blocking. Unfortunately, due to the high cost of data, we cannot serve the requested page without the accompanied ads.

If you have installed ad-blocking software, please disable it (sometimes a complete uninstall is necessary). Private browsing Firefox users should be able to disable tracking protection while visiting our website. Visit Mozilla support for more information. If you do not believe you have any ad-blocking software on your browser, you may want to try another browser, computer or internet service provider. Alternatively, you may consider the following if you want an ad-free experience.

Canadian Insider Ultra Club
$432/ year*
Daily Morning INK newsletter
+3 months archive
Canadian Market INK weekly newsletter
+3 months archive
30 publication downloads per month from the PDF store
Top 20 Gold, Top 30 Energy, Top 40 Stock downloads from the PDF store
All benefits of basic registration
No 3rd party display ads
JOIN THE CLUB

* Price is subject to applicable taxes.

Paid subscriptions and memberships are auto-renewing unless cancelled (easily done via the Account Settings Membership Status page after logging in). Once cancelled, a subscription or membership will terminate at the end of the current term.

American Pacific Mining Provides Update on 2022 Work Program at the Palmer Project

VANCOUVER, British Columbia, Jan. 25, 2023 (GLOBE NEWSWIRE) -- American Pacific Mining Corp (CSE: USGD / OTCQX: USGDF / FWB: 1QC) (“American Pacific” or the “Company”) is pleased to provide an update on the work programs completed in 2022 at the Palmer Project (“Palmer” or the “Project”), an advanced-stage, high-grade volcanogenic massive sulphide-sulphate (“VMS”) project located within the Porcupine Mining District of the Haines Borough, Alaska, in which the Company recently acquired indirect ownership of a minority interest.

The 2022, multi-purpose, US$10.4 million work program at the Palmer Project, focused on preparations for initiating an extensive underground exploration program in 2023.

The major elements of the 2022 program included:

  1. An engineering review of the underground portal access road and 60% of the access road construction was completed;
  2. Lease, permitting and site preparation for a 60-person all-season camp slated for occupancy in June 2023 to support the planned exploration activity;
  3. A seven-hole exploration drilling program totaling 3,546 metres to test the offset of the South Wall deposit and the Terminus and Jasper Mountain targets;
  4. Environmental and permitting, including on-going environmental baseline studies and compliance work; and
  5. Engineering studies including a metallurgical sampling program completed with sample compilation in progress, and a production site evaluation that provides an alternate production portal, mill and tailing management analysis.

“We are pleased with the progress made during the last year at Palmer with the total aggregate investment in exploration and development to-date over US $68.7 million,” stated Warwick Smith, CEO and Director, of American Pacific. “We look forward to collaborating with our joint venture partner Dowa to finalize the budget and workplans for 2023 during Q1/2023.”

Image 1. Portal Access Road Construction

About the Palmer Project

The Palmer Project is a promising advanced-stage high-grade volcanogenic massive sulphide-sulphate (“VMS”) project located within the Porcupine Mining District of the Haines Borough, Alaska. The Project is operated in a joint venture partnership between American Pacific Mining, through its wholly owned subsidiary, Constantine North Inc. as the manager (operator), with 41% ownership and Dowa Metals & Mining Co., Ltd (Dowa), with 59% ownership.

As of December 31, 2022, US$68.7 million has been invested in exploration work and environmental programs to responsibly advance the Project. Palmer, which hosts a National Instrument 43-101 compliant mineral resource of 4.68 million tonnes of 10.2% zinc equivalent (3.9% copper equivalent) in the indicated category and 9.59 million tonnes of 8.9% zinc equivalent (3.4%) copper equivalent in the inferred category. A Preliminary Economic Assessment (“PEA”) was completed in June 2019 (filed July 18, 2019, amended March 7, 2022; filed on www.sedar.com), which presents a low capex, low operating cost and a post-tax NPV of US$266 million. (The Amended PEA is preliminary in nature and includes inferred mineral resources that are considered too speculative geologically to have economic considerations applied to them that would enable them to be categorized as mineral reserves. There is no certainty that amended PEA results will be realized. Mineral resources that are not mineral reserves do not have demonstrated economic viability).

About American Pacific Mining Corp.

American Pacific Mining Corp. is a base and precious metals explorer and developer focused on opportunities in the Western United States. The Company’s flagship asset is the 14 million tonne, high-grade, Palmer Volcanic Massive Sulfide (VMS) project in Alaska, under joint-venture partnership with Dowa Metals & Mining, owner of Japan’s largest zinc smelter. American Pacific Mining is also partnered with Kennecott Exploration, a division of the Rio Tinto Group, on the past-producing Madison Copper-Gold project in Montana. For the Madison transaction, American Pacific was selected as a finalist in both 2021 and 2022 for 'Deal of the Year' at the S&P Global Platts Global Metals Awards, an annual program that recognizes exemplary accomplishments in 16 performance categories. American Pacific's asset portfolio also includes the Gooseberry Silver-Gold project and the Tuscarora Gold-Silver project: two high-grade, precious metals projects located in key mining districts of Nevada, USA. The Company’s mission is to grow by the drill bit and by acquisition.

On Behalf of the Board of American Pacific Mining Corp.

“Warwick Smith”
CEO & Director

Corporate Office: Suite 910 – 510 Burrard Street Vancouver, BC, V6C 3A8 Canada

Investor Relations Contact:
Kristina Pillon, High Tide Consulting Corp.,
604.908.1695 / [email protected]

Media Relations Contact:
Adam Bello, Primoris Group Inc.,
416.489.0092 / [email protected]

The CSE has neither approved nor disapproved the contents of this news release. Neither the CSE nor its Regulation Services Provider (as that term is defined in the policies of the CSE) accepts responsibility for the adequacy or accuracy of this release.

A photo accompanying this announcement is available at https://www.globenewswire.com/NewsRoom/AttachmentNg/24ed8cc6-5dbf-44ca-9868-6abe8955bfc0

 


Comment On!

140
Upload limit is up to 1mb only
To post messages to your Socail Media account, you must first give authorization from the websites. Select the platform you wish to connect your account to CanadianInsider.com (via Easy Blurb).