Ad blocking detected

Thank you for visiting CanadianInsider.com. We have detected you cannot see ads being served on our site due to blocking. Unfortunately, due to the high cost of data, we cannot serve the requested page without the accompanied ads.

If you have installed ad-blocking software, please disable it (sometimes a complete uninstall is necessary). Private browsing Firefox users should be able to disable tracking protection while visiting our website. Visit Mozilla support for more information. If you do not believe you have any ad-blocking software on your browser, you may want to try another browser, computer or internet service provider. Alternatively, you may consider the following if you want an ad-free experience.

Canadian Insider Ultra Club
$500/ year*
Daily Morning INK newsletter
+3 months archive
Canadian Market INK weekly newsletter
+3 months archive
30 publication downloads per month from the PDF store
Top 20 Gold, Top 30 Energy, Top 40 Stock downloads from the PDF store
All benefits of basic registration
No 3rd party display ads
JOIN THE CLUB

* Price is subject to applicable taxes.

Paid subscriptions and memberships are auto-renewing unless cancelled (easily done via the Account Settings Membership Status page after logging in). Once cancelled, a subscription or membership will terminate at the end of the current term.

TORONTO, Aug. 02, 2017 (GLOBE NEWSWIRE) -- Wesdome Gold Mines Ltd. (TSX:WDO) (“Wesdome” or the “Company”) today announces second quarter 2017 (“Q2”) financial results.

Mr. Duncan Middlemiss, President and CEO commented, “Over the last year, the operations team has been focused on increasing mined gold grades and developed stope inventory consistently quarter over quarter. The first half of 2017 demonstrates that this work is starting to take effect. Average head grades in the first half of 2017 at the Eagle River Underground Mine were 10.7 grams per tonne, versus 6.6 grams per tonne in the first half of 2016. This has been achieved by opening up additional production areas, and increased discipline of the application of quality tonnes, not quantity tonnes. As a result, operating cost per ounce have decreased to CAD$1,153 per ounce in H1 2017 compared to CAD$1,419 per ounce on H1 2016. As a result, operating cash flow has significantly improved to CAD$10.6 M in H1 2017 versus CAD$2.1 M in H1 2016. Moving forward, we are focused on reducing unit costs on an all-in basis.  Completion of a ventilation raise this year will improve the workplaces and increase productivity by allowing for additional production areas, further reducing unit costs and increasing production.”

“At Kiena, the contractor has been mobilizing in preparation for ramp development commencing in early August. We expect to be back to drilling the Kiena Deep discovery by September or October 2017. In the meantime, 2 drills will be drilling other prospective targets underground. These include the VC and S50 zones, both of which are located close to existing production infrastructure.”

 2017 SECOND QUARTER HIGHLIGHTS

  • Gold production of 12,529 ounces (Q2 2016: 12,147) increased slightly due to higher grades at the Eagle River Mine with lower tonnes milled
  • Eagle River Mine underground production of 10,597 ounces (Q2 2016: 10,210) at a head grade of 9.8 grams per tonne (“g/t”) (Q2 2016: 7.5) with a mill recovery of 96.3% (Q2 2016: 93.4%) from 34,960 tonnes milled (Q2 2016: 45,305)
  • Mishi Open Pit mine production of 1,932 ounces (Q2 2016: 1,937) at a head grade of 1.8 g/t (Q2 2016: 2.1) with a mill recovery of 83.1% (Q2 2016: 85.5%) from 39,117 tonnes milled (2016: 34,006)
  • 2017 Guidance remains at 52,000 – 58,000 ounces
  • Total mill throughput of 74,077 tonnes (Q2 2016: 79,311) averaging 814 tonnes per calendar day (“tpd”) (Q2 2016: 872) was lower due partly to scheduled Hydro One system maintenance and upgrades
  • Revenue of $23.2 million (Q2 2016: $18.4 million) on gold sales of 13,030 ounces (Q2 2016: 11,265) at an average realized price of $1,715 or US$1,274 per ounce (Q2 2016: $1,637 or US $1,271)
  • Mine operating profit1 of $7.1 million (Q2 2016: $4.5 million) increased compared to the comparative quarter due to higher sales and slightly higher production
  • Net income of $0.9 million (Q2 2016: $1.8 million), or $0.01 per share (Q2 2016: $0.01)
  • Operating cash flow of $5.3 million (Q2 2016: $4.9 million), or $0.041 per share (Q2 2016: $0.04 increased due to higher sales
  • Free cash flow1 of $(4.7) million compared to Q2 2016 of $(2.1) million. The increased negative outflow in Q2 2017 is due to the heightened combined exploration activities at Eagle River, Kiena and Moss Lake. Q2 2017 exploration was $5.9 million compared to only $1.6 million in Q2 2016
  • Production cash costs per ounce1 were $1,270 or US$945 (Q2 2016: $1,188 or US$922)
  • All-in sustaining costs per ounce (“AISC”)1 on a production basis of $1,770 or US$1,316 (Q2 2016: $1,687 or US$1,309), an increase of 5% over Q2 2016 due to higher production costs relating to additional stope development, and higher corporate and general expenses. Increased stope development in Q2 2017 has led to an additional 20,000 tonnes of developed reserves inventory as at June 30, 2017
  • Convertible debentures of $7.0 million were fully retired at maturity through $4.9 million conversion into common shares of the Company and $2.1 million cash repayment
  • Cash and cash equivalents of $22.7 million; 3,557 ounces gold in process at market price of $5.7 million; working capital of $17.8 million as at June 30, 2017

2017 Second Quarter Exploration and Corporate Development Highlights

  • At the Eagle River Underground mine, initial development completed on the 844 metre level of the 300E Zones. The combined strike length of the subzones is 173.70 m with a weighted average width of 2.85 m and cut and uncut gold grades of 22.62 g Au/tonne and 34.79 g Au/tonne, respectively.
  • Drilling at Mishi Open Pit extends deposit 700 m westwards
  • Significant progress made on the Kiena exploration ramp. CMAC-Thyssen Mining has been selected as the contractor, and equipment has been mobilized in preparation for ramp development commencing in early August
  • Board of Directors strengthened with the appointment of two experienced mining industry professionals, Charles (Chuck) Main and Warwick Morley-Jepson
 
Financial Results – Three and Six Months 2017 and 2016
 Three Months ended June 30 Six Months ended June 30
 2017
2016
 2017
2016
(in $000, except per share amounts)     
Revenue23,248 18,447  43,348 31,731 
Mine operating profit 17,132 4,493  13,687 3,388 
Net income (loss)863 1,837  1,558 (1,463)
Net income (loss) adjusted11,313 409  2,229 (2,445)
Basic net income (loss) per share0.01 0.01  0.01 (0.01)
Basic net income (loss) per share adjusted 10.01 0.00  0.02 (0.02)
Cash flows from operating activities5,250 4,885  10,642 2,099 
Cash flows from operating activities adjusted 15,700 3,457  11,313 1,117 
Free cash flow 1(4,685)(2,147) (8,884)(9,337)
Cash and cash equivalents22,681 26,802  22,681 26,802 
Working capital17,815 16,598  17,815 16,598 


Operational Results – Three and Six Months 2017 and 2016
 Three Months ended June 30 Six Months ended June 30
 20172016 20172016
Eagle tonnes milled34,96045,305 73,53885,144
Mishi tonnes milled39,11734,006 75,75870,293
Total tonnes milled74,07779,311 149,296155,437
Eagle grade (g/t)9.87.5 10.76.6
Mishi grade (g/t)1.82.1 1.82.0
Eagle River Mine mill recovery (%)96.393.4 95.791.2
Mishi Mine mill recovery (%)83.185.5 82.184.6
Eagle recovered grade (g/t)9.47.0 10.26.0
Mishi recovered grade (g/t)1.51.8 1.41.7
Eagle ounces produced10,59710,210 24,18516,464
Mishi ounces produced1,9321,937 3,5063,719
Total ounces produced12,52912,147 27,69120,183
Ounces sold13,03011,265 25,35019,365
Average realized price (CAD$/oz) *1,7151,637 1,6741,639
Average realized price (US$/oz) *1,2741,271 1,2541,231
Production cash costs (CAD$/oz) *1,2701,188 1,1531,419
Production cash costs/oz (US$/oz)945922 8641,066
All-in-sustaining costs (CAD$/oz)*1,7701,687 1,6081,982
All-in-sustaining costs (US$/oz) *1,3161,309 1,2041,489
Average 1 USD to CAD exchange rate1.34491.2886 1.33511.3307

Note:

  1. Refer to the section entitled “Non-IFRS Performance Measures”  in the Q2 2017 Management’s Discussion and Analysis for the reconciliation of these non-IFRS measurements to the Financial Statements.

Wesdome Gold Mines 2017 Second Quarter Financial Results Conference Call:

Thursday, August 3, 2017 at 10:00 am ET

North American Toll Free: + 1 (844) 202-7109
International Dial-In Number: +1 (703) 639-1272
Passcode:  54570695
Webcast link: http://edge.media-server.com/m/p/67czhayi

Webcast can also be accessed under the News and Events section of the Company’s website (www.wesdome.com

ABOUT WESDOME
Wesdome Gold Mines is in its 30th year of continuous gold mining operations in Canada.  The Company is 100% Canadian focused with a pipeline of projects in various stages of development.  The Eagle River Complex in Wawa, Ontario is currently producing gold from two mines, the Eagle River Underground Mine and the Mishi Open pit, from a central mill.  Wesdome is actively exploring its brownfields asset, the Kiena Complex in Val d’Or, Quebec.  The Kiena Complex is a fully permitted former mine with a 930 metre shaft and 2,000 tonne per day mill.  The Company has further upside at its Moss Lake gold deposit, located 100 kilometres west of Thunder Bay, Ontario, which is being explored and evaluated to be developed in the appropriate gold price environment.  The Company has approximately 133.9 million shares issued and outstanding and trades on the Toronto Stock Exchange under the symbol “WDO.”

This news release contains “forward-looking information” which may include, but is not limited to, statements with respect to the future financial or operating performance of the Company and its projects. Often, but not always, forward-looking statements can be identified by the use of words such as “plans”, “expects”, “is expected”, “budget”, “scheduled”, “estimates”, “forecasts”, “intends”, “anticipates”, or “believes” or variations (including negative variations) of such words and phrases, or state that certain actions, events or results “may”, “could”, “would”, “might” or “will” be taken, occur or be achieved. Forward-looking statements involve known and unknown risks, uncertainties and other factors which may cause the actual results, performance or achievements of the Company to be materially different from any future results, performance or achievements expressed or implied by the forward-looking statements. Forward-looking statements contained herein are made as of the date of this press release and the Company disclaims any obligation to update any forward-looking statements, whether as a result of new information, future events or results or otherwise. There can be no assurance that forward-looking statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. The Company undertakes no obligation to update forward-looking statements if circumstances, management’s estimates or opinions should change, except as required by securities legislation. Accordingly, the reader is cautioned not to place undue reliance on forward-looking statements. The Company has included in this news release certain non-IFRS performance measures, including, but not limited to, mine operating profit, mining and processing costs and cash costs. Cash costs per ounce reflect actual mine operating costs incurred during the fiscal period divided by the number of ounces produced.  These measures are not defined under IFRS and therefore should not be considered in isolation or as an alternative to or more meaningful than, net income (loss) or cash flow from operating activities as determined in accordance with IFRS as an indicator of our financial performance or liquidity. The Company believes that, in addition to conventional measures prepared in accordance with IFRS, certain investors use this information to evaluate the Company's performance and ability to generate cash flow

CONTACT: For further information, please contact:

Duncan Middlemiss		
President and CEO		
416-360-3743   ext. 29		
[email protected]		

or

Lindsay Carpenter Dunlop
VP Investor Relations
416-360-3743   ext. 25
[email protected]

8 King St. East, Suite 811
Toronto, ON, M5C 1B5
Toll Free: 1-866-4-WDO-TSX
Phone: 416-360-3743, Fax: 416-360-7620
Website: www.wesdome.com

Wesdome Gold Mines Logo

Comment On!

140
Upload limit is up to 1mb only
To post messages to your Socail Media account, you must first give authorization from the websites. Select the platform you wish to connect your account to CanadianInsider.com (via Easy Blurb).