Ad blocking detected

Thank you for visiting CanadianInsider.com. We have detected you cannot see ads being served on our site due to blocking. Unfortunately, due to the high cost of data, we cannot serve the requested page without the accompanied ads.

If you have installed ad-blocking software, please disable it (sometimes a complete uninstall is necessary). Private browsing Firefox users should be able to disable tracking protection while visiting our website. Visit Mozilla support for more information. If you do not believe you have any ad-blocking software on your browser, you may want to try another browser, computer or internet service provider. Alternatively, you may consider the following if you want an ad-free experience.

Canadian Insider Ultra Club
$500/ year*
Daily Morning INK newsletter
+3 months archive
Canadian Market INK weekly newsletter
+3 months archive
30 publication downloads per month from the PDF store
Top 20 Gold, Top 30 Energy, Top 40 Stock downloads from the PDF store
All benefits of basic registration
No 3rd party display ads
JOIN THE CLUB

* Price is subject to applicable taxes.

Paid subscriptions and memberships are auto-renewing unless cancelled (easily done via the Account Settings Membership Status page after logging in). Once cancelled, a subscription or membership will terminate at the end of the current term.

Torex Gold Reports Results From the 2021 Drill Program at ELG Underground

Infill Drilling Reinforces Potential to Extend Underground Mine Life Beyond Current Reserves

TORONTO, Dec. 14, 2021 (GLOBE NEWSWIRE) -- Torex Gold Resources Inc. (the “Company” or “Torex”) (TSX: TXG) announces initial results from the 2021 drilling program at the El Limón Guajes underground mine, including zones referred to as Sub-Sill and El Limón Deep (“ELD”) (collectively the “ELG Underground”).

Jody Kuzenko, President & CEO stated:

“A key pillar of the Torex strategy moving forward includes a fresh focus on exploration and we are pleased with the results from the 2021 drill program at the ELG Underground. Infill drilling conducted under the first phase of the 2021 program reinforces our positive outlook on the ability to extend the mine life of the ELG Underground beyond current reserves and complement future production from Media Luna, which remains on track to begin in Q1 2024.

“The 2021 ELG Underground drill program is divided into two phases. The first phase, for which final assays are still being received, was focused on upgrading Inferred mineral resources to the Measured and Indicated categories with a view to extending the mine life of the ELG Underground. The second phase, which commenced this summer, is focused on step-out drilling to grow the overall resource base. Initial results from step-out holes targeting a previously identified area under the El Limón Sur open pit are encouraging. Further drilling is required to better understand the geology and potential of this area, which is located approximately 300 metres southwest of Sub-Sill.

“Overall, the ELG Underground has been a key value driver for Torex as reserves have been expanded and the mining rate has increased to well over 1,200 tonnes per day – substantially higher than the 830 tonnes per day originally anticipated from the Sub-Sill deposit. Based on the drill results seen to date, we believe we are well positioned to unlock further value from the ELG Underground.”

Key highlights from the 2021 ELG underground drill program are outlined in Table 1.

TABLE 1: HIGHLIGHTS FROM 2021 ELG UNDERGROUND DRILL PROGRAM

Drill-HoleDeposit
(purpose)
From
(m)
To
(m)
Core Length
(m)
Au
(g/t)
Ag
(g/t)
Cu
(%)
LDUG-149ELD (infill)36.070.034.015.0414.70.66
LDUG-152ELD (infill)40.262.722.521.5212.70.53
LDUG-148ELD (infill)33.076.543.59.654.40.18
LDUG-164ELD (infill)52.080.928.913.5316.20.86
LDUG-166ELD (infill)91.0132.041.08.924.00.21
LDUG-139ELD (infill)133.4158.525.19.2119.40.40
LDUG-165ELD (infill)126.0154.728.76.956.20.27
LDUG-126ELD (infill)40.544.03.556.259.40.18
LDUG-146ELD (infill)28.054.426.47.024.40.16
LDUG-159ELD (infill)29.247.017.810.101.70.12
LDUG-153ELD (infill)70.378.07.719.794.80.52
SST-244Sub-Sill (infill)275.2300.024.85.721.60.16
SST-216Sub-Sill (infill)190.0194.04.030.022.80.00
SST-232Sub-Sill (step-out)75.286.511.310.21156.21.82
SST-226Sub-Sill (infill)328.5336.37.810.7110.70.44

Notes to Table 1:

  1. Intersections do not represent true thickness of mineralized zones
  2. Core lengths subject to rounding
  3. Interval lengths for holes dipping between -45 to -90º have been selected to represent a minimum mining height of 3.5 m
  4. Interval lengths for holes dipping between 0 and -45º have been selected to represent a minimum horizontal length of 3.5 m
  5. Torex is not aware of any drilling, sampling, recovery, or other factors that could materially affect the accuracy or reliability of the data

2021 ELG UNDERGROUND DRILL PROGRAM

Torex is expecting to conclude a 25,000 metres (“m”) drill program at the ELG Underground in 2021 (excluding 9,000 m of definition drilling and approximately 2,000 m of drilling related to the El Limón pushback), with most of the program focused on infill drilling (Phase 1) and the remainder on step-out drilling (Phase 2). The greater focus on infill drilling is aimed at upgrading Inferred mineral resources to the Measured and Indicated categories, so that a greater level of mineral resources can be included in a new mine plan for the ELG Underground. The new mine plan will be included in an updated Technical Report scheduled for release in Q1 2022.

To date, the Company has drilled and received assay results for 69 drill holes associated with the 2021 program representing approximately 14,200 m of drilling. Of the assay results received to date, approximately 5,800 m (43 drill holes) have been drilled at ELD with an additional 8,400 m (26 holes) drilled at Sub-Sill. Infill drilling at Sub-Sill has ramped up through the back half of the year. There are currently 8 rigs actively drilling off the ELG Underground, including 3 rigs from surface and 5 rigs underground.

Assay results for the initial drill holes under the 2021 drill program are outlined in Table 2 (ELD deposit) and Table 3 (Sub-Sill deposit).

Drilling at ELD is focused on upgrading mineral resources, primarily within the southern portion of the deposit (Figure 3). Assay results received to date have been positive and increase our confidence in extending reserves within ELD.

At Sub-Sill, infill drilling is targeting to upgrade mineral resources in order to further extend reserves both vertically and laterally (Figure 4 and 5). Step-out drilling completed to date has been focused on a previously identified area of mineralization below the El Limón Sur open pit, approximately 300 m southwest of Sub-Sill. Further study is required to understand the geology and underlying potential of this area.

Exploration drilling at the ELG Underground is expected to remain a key focus for Torex as the Company looks to test the lateral and vertical extents of both Sub-Sill and ELD. Completion of Portal # 3 in mid-2022 is expected to support the Company’s efforts to test the vertical extent of both deposits and determine if Sub-Sill and ELD meet up at depth. While the primary role of Portal #3 is to reduce haul distances and improve ventilation, development of the portal will allow for the construction of drill platforms to target deeper extensions of the deposits more efficiently than is currently achievable from current underground and surface-based drilling.

Intersections reported in this press release are not reported as true thickness. Interval lengths for holes dipping between 45º and -90º have been selected to represent a minimum mining height of 3.5 m. Interval lengths for holes dipping between 0º and -45º have been selected to represent a minimum horizontal length of 3.5 m.

Currently, reported intersections from ELD and Sub-Sill also demonstrate the continuity of potentially economic gold mineralization for at least 350 m along strike at ELD and 300 m down-dip below current development levels at Sub-Sill; apparent widths vary from 3.5 m to 46 m.

ELG UNDERGROUND MINE

The ELG Underground consists of the higher-grade Sub-Sill and ELD deposits. At year-end 2020, the combined Proven & Probable Reserve for the two deposits was estimated at 413,000 ounces of gold (2.03 million tonnes at an average grade of 6.32 g/t gold). The 2020 year-end reserve update reflected a 15% year-over-year increase in reserves (50% after accounting for depletion).

Since underground mining commenced in late-2017, the ELG Underground has produced approximately 196,000 ounces of gold (222,400 ounces mined prior to process plant recoveries at an average gold grade of 7.64 g/t) through year-end 2020. Cumulative gold mined plus year-end 2020 reserves is more than 3-fold the initial underground gold reserves of 183,000 ounces as estimated as of December 31, 2017.

The ELG Underground is on track for another strong year of production in 2021 with 74,000 ounces of gold produced (83,500 ounces of gold mined prior to process recoveries at 7.10 g/t gold) through the third quarter. Annual production from the ELG Underground averaged approximately 82,000 ounces between 2019 and 2020 (92,700 ounces prior to process recoveries at an average gold grade of 7.53 g/t).

ELG UNDERGROUND GEOLOGY

The ELD and Sub-Sill deposits are distinct portions of the larger El Limón Guajes mineralized skarn system. The two deposits occur in different locations relative to a granodiorite sill prevalent in the deposit area and are approximately 300 m apart.

The El Limón Guajes mining complex, located in the central part of the Guerrero Gold Belt in Southwest Mexico, is hosted in the Mesozoic carbonate-rich Morelos Platform, which has been intruded by Paleocene granodiorite stocks, sills, and dikes. Skarn-hosted gold mineralization is developed along the contacts of the intrusive rocks and the enclosing carbonate-rich sedimentary rocks of the Cuautla and Morelos formations as well as along the footwall contact of the Mezcala Formation.

ELD represents the down-dip extension of the skarn that hosts the gold mineralization at El Limón open pit, where the skarn is developed immediately above a large granodiorite sill intruded along the contact of the Cuautla and the Mezcala formations. The mineralized skarn forms a single and continuous package that strikes approximately 25° to the north-northeast and dips between 20° and 40° to the northwest. To the northwest, the strike of the skarn package changes to approximately 30° to the north-northwest and the dip steepens to approximately 60°. The change in the geometry of the skarn package is interpreted to be related to the northeast striking and southeast dipping La Flaca Fault; parallel structures are locally represented by post mineral dykes.

Mineralization in the Sub-Sill area formed along contacts between marbles of the Morelos formation and granodiorite sills, which is interpreted as late-stage porphyritic intrusions that branch off the main body of granodiorite. The best developed skarn zones at the Sub-Sill area strikes approximately 40° northeast and dip between 35° and 45° to the northwest. Deep drilling has identified a steeply dipping, 65° to 75° northwest, extension of the Sub-Sill skarn zone with high grade mineralization. This zone is currently interpreted as the structurally controlled feeder of the mineralization that developed along the lithological contacts between the hornfels, the marbles, and the sills. The skarn zone hosts multiple horizons with high-grade gold mineralization that vary in strike length from 50 m up to 240 m, with apparent widths varying from 2 m to 46 m. The trend of the overall skarn body in the Sub-Sill area is north-south to northeast-southwest.

The style of mineralization at both deposits is characterized by gold, which is strongly associated with bismuth and variable amounts of silver and copper. Gold occurs in variably sulfidized, pyrrhotite-rich skarn, while silver and copper mineralization is controlled primarily by the degree of sulfidation of the host skarn. Mineralization is associated with retrograde alteration characterized by the occurrence of phlogopite, amphibole, chlorite, calcite and lesser amounts of quartz and epidote, and local magnetite.

QA/QC AND QUALIFIED PERSON
Torex maintains an industry-standard analytical quality assurance and quality control (QA/QC) and data verification program to monitor laboratory performance and ensure high quality assays. Results from this program confirm reliability of the assay results. All sampling and analytical work for the mine exploration program is performed by SGS de Mexico S.A. de C.V. (“SGS”) in Durango, and by SGS in Nuevo Balsas, Mexico. Gold analyses comprise fire assays with atomic absorption or gravimetric finish. External check assays for QA/QC purposes are performed at ALS Chemex de Mexico S.A. de C.V.

The analytical QA/QC program is currently overseen by Carlo Nasi, Chief Mine Geologist for Minera Media Luna, S.A. de C.V.

The scientific and technical data contained in this news release pertaining to the ELG underground exploration program have been reviewed and approved by John Makin, MAIG. Mr. Makin is a member of the Australian Institute of Geoscientists (#7313), has experience relevant to the style of mineralization under consideration, and is a Consultant Geologist employed by SLR (Canada) Consulting Ltd. Mr. Makin has verified the data disclosed, including sampling, analytical, and test data underlying the drill results, and he consents to the inclusion in this release of said data in the form and context in which they appear.

Additional information on the Sub-Sill and ELD deposits, sampling and analyses, analytical labs, and methods used for data verification is available in the Company’s most recent annual information form and the technical report (the “Technical Report”) entitled “Morelos Property, NI 43-101 Technical Report, ELG Mine Complex, Life of Mine Plan and Media Luna Preliminary Economic Assessment, Guerrero State, Mexico ” with an effective date of March 31, 2018 (filing date September 4, 2018) filed on SEDAR at www.sedar.com and the Company’s website at www.torexgold.com.

ABOUT TOREX
Torex is an intermediate gold producer based in Canada, engaged in the exploration, development, and operation of its 100% owned Morelos Gold Property, an area of 29,000 hectares in the highly prospective Guerrero Gold Belt located 180 kilometres southwest of Mexico City. The Company’s principal assets are the El Limón Guajes mining complex (“ELG” or the “ELG Mine Complex”), comprising the El Limón, Guajes and El Limón Sur open pits, the El Limón Guajes underground mine including zones referred to as Sub-Sill and ELD, and the processing plant and related infrastructure, which commenced commercial production as of April 1, 2016, and the Media Luna deposit, which is an advanced stage development project, and for which the Company issued the updated PEA in September 2018 (see the 2018 Technical Report). The property remains 75% unexplored.

FOR FURTHER INFORMATION, PLEASE CONTACT:

TOREX GOLD RESOURCES INC.
Jody KuzenkoDan Rollins
President and CEOVice President, Corporate Development & Investor Relations
Direct: (647) 725-9982Direct: (647) 260-1503
[email protected][email protected]

CAUTIONARY NOTES
FORWARD LOOKING INFORMATION
This press release contains "forward-looking statements" and "forward-looking information" within the meaning of applicable Canadian securities legislation. Forward-looking information also includes, but is not limited to, statements that:. infill drilling conducted under the first phase of the 2021 program reinforces our positive outlook on the ability to extend the mine life of the ELG Underground beyond current reserves and complement future production from Media Luna, which remains on track to begin in Q1 2024; the first phase of the drill program was focused on upgrading Inferred mineral resources to the Measured and Indicated categories with a view to extending the mine life of the ELG Underground; the second phase is focused on step-out drilling to grow the overall resource base; initial results from step-out holes targeting a previously identified area under the El Limón Sur open pit are encouraging; based on the drill results seen to date, we believe we are well positioned to unlock further value from the ELG Underground; Torex is expecting to conclude a 25,000 metres (“m”) drill program at the ELG Underground in 2021 (excluding 9,000 m of definition drilling and approximately 2,000 m of drilling related to the El Limón pushback), with most of the program focused on infill drilling (Phase 1) and the remainder on step-out drilling (Phase 2); the greater focus on infill drilling is aimed at upgrading Inferred mineral resources to the Measured and Indicated categories, so that a greater level of mineral resources can be included in a new mine plan for the ELG Underground; the new mine plan will be included in an updated Technical Report scheduled for release in Q1 2022; exploration drilling at the ELG Underground is expected to remain a key focus for Torex as the Company looks to test the lateral and vertical extents of both Sub-Sill and ELD; and the ELG Underground is on track for another strong year of production in 2021. Generally, forward-looking information can be identified by the use of forward-looking terminology such as “schedule”, “continue”, and "expects" or variations of such words and phrases or statements that certain actions, events, or results “will”, “will result”, or “is expected to" occur. Forward-looking information is subject to known and unknown risks, uncertainties and other factors that may cause the actual results, level of activity, performance or achievements of the Company to be materially different from those expressed or implied by such forward-looking information, including, without limitation, risks and uncertainties associated with: uncertainty involving skarns deposits; and those risk factors identified in the Technical Report and the Company’s annual information form and management’s discussion and analysis or other unknown but potentially significant impacts. Forward-looking information are based on the assumptions discussed in the Technical Report and such other reasonable assumptions, estimates, analysis, and opinions of management made in light of its experience and perception of trends, current conditions and expected developments, and other factors that management believes are relevant and reasonable in the circumstances at the date such statements are made. Although the Company has attempted to identify important factors that could cause actual results to differ materially from those contained in the forward-looking information, there may be other factors that cause results not to be as anticipated. There can be no assurance that such information will prove to be accurate, as actual results and future events could differ materially from those anticipated in such information. Accordingly, readers should not place undue reliance on forward-looking information. The Company does not undertake to update any forward-looking information, whether as a result of new information or future events or otherwise, except as may be required by applicable securities laws.

TABLE 2: ASSAY RESULTS FROM 2021 ELG UNDERGROUND DRILL PROGRAM – ELD DEPOSIT

       Total   Intersection   
Drill-HoleProgramUTM-EUTM-NElevationAzimuthDipLength FromToCore LengthAuAgCuLithology
  (m)(m)(m)(°)(°)(m) (m)(m)(m)(g/t)(g/t)(%) 
LDUG-121Step-out422,087.11,990,337.51,010.7170-73331.5 263.3267.03.71.191.10.06Breccia
LDUG-122Infill422,114.31,990,459.31,011.865-32114.0 81.285.24.04.3314.70.56Skarn
LDUG-126Infill422,227.21,990,302.1969.8136-15102.0 40.544.03.556.259.40.18Skarn
         56.065.09.09.878.10.29Skarn
LDUG-127Infill422,114.01,990,424.71,011.265-26111.0 101.0104.73.71.4350.91.39Skarn
LDUG-129Infill422,200.91,990,432.1980.634-8160.0 23.530.06.512.879.90.26Skarn
LDUG-131Infill422,114.31,990,402.91,011.261-24117.0 112.0115.83.81.6923.40.56Skarn
LDUG-133Infill422,226.81,990,301.8969.3139-2893.0 32.937.85.010.215.10.18Skarn
         72.877.85.03.5219.50.45Skarn
LDUG-134Infill422,100.01,990,354.71,011.163-33255.0 140.6144.23.66.165.20.14Skarn
         244.0248.04.03.108.80.13Skarn
LDUG-135Infill422,114.11,990,402.41,010.461-51264.0 183.5200.617.10.3823.41.06Skarn
LDUG-136Infill422,114.51,990,393.11,011.065-36150.0 115.2121.76.48.1721.90.66Skarn/Gdi
LDUG-137Infill422,226.61,990,301.6969.3140-4163.0 35.040.85.84.193.30.06Skarn
LDUG-138Infill422,225.71,990,301.4970.0166-1096.0 82.189.27.16.401.30.06Skarn
LDUG-139Infill422,088.71,990,338.11,010.7130-62201.0 133.4158.525.19.2119.40.40Skarn
        including143.5149.45.914.2764.10.80Skarn
        & including153.9157.94.017.763.30.05Skarn
LDUG-140Infill422,114.51,990,393.11,011.070-39171.0 107.0110.53.55.310.90.01Skarn
         120.2129.39.10.2829.61.07Skarn
LDUG-141Infill422,226.51,990,304.1969.00-9045.0 18.321.83.52.014.00.11Skarn
LDUG-142Infill422,227.41,990,302.8969.9116-16102.0 50.955.04.110.9719.70.42Skarn
         61.074.013.07.2938.22.34Skarn
LDUG-143Infill422,131.51,990,321.9922.1134-8129.0 32.436.94.518.083.30.12Skarn
         53.859.25.35.652.40.04Skarn
         66.472.25.84.764.00.14Skarn
         85.093.58.56.008.20.42Skarn
LDUG-145Infill422,227.21,990,302.3969.9127-1693.0 48.060.112.19.725.00.14Skarn
         66.079.713.75.1431.91.11Skarn
LDUG-146Infill422,131.51,990,322.0921.8134-2090.0 28.054.426.47.024.40.16Skarn
LDUG-147Infill422,227.01,990,302.5969.4123-4363.0 47.855.77.99.9522.80.29Skarn
LDUG-148Infill422,131.51,990,322.0921.6134-3393.0 33.076.543.59.654.40.18Skarn
        including39.445.05.736.7522.21.07Skarn
LDUG-149Infill422,131.51,990,321.9921.4135-4596.0 36.070.034.015.0414.70.66Skarn
        including46.652.96.346.9512.50.49Skarn
LDUG-150Infill422,114.01,990,507.01,012.062-40111.0 98.0101.73.79.0517.90.45Skarn
LDUG-151Infill422,113.91,990,492.61,012.063-33142.0 62.869.46.66.183.90.26Skarn
LDUG-152Infill422,131.41,990,322.0920.8133-57189.0 40.262.722.521.5212.70.53Skarn
        including40.247.27.031.5613.80.60Skarn
         67.074.07.06.8114.20.42Skarn
LDUG-153Infill422,113.91,990,492.61,011.563-49102.0 70.378.07.719.794.80.52Skarn
LDUG-155Infill422,160.01,990,259.1929.3115-2763.0 11.827.015.28.111.30.10Skarn
LDUG-158Infill422,159.71,990,258.5929.0131-3760.0 13.717.53.72.991.10.01Skarn
LDUG-159Infill422,159.41,990,258.7928.4131-7560.0 29.247.017.810.101.70.12Skarn
        including40.544.84.326.2533.71.04Skarn
LDUG-160Infill422,159.11,990,257.5928.5157-5060.0 8.914.55.65.042.30.11Skarn
         22.532.09.66.771.90.08Skarn
         43.548.24.74.183.40.15Skarn
         54.060.06.04.441.80.04Gdi
LDUG-162Infill422,126.61,990,319.2920.7139-25102.0 32.042.710.77.772.40.12Skarn
         53.362.08.75.380.90.02Skarn
LDUG-164Infill422,125.01,990,317.3922.3165-40105.0 52.080.928.913.5316.20.86Skarn
        including57.862.04.219.2318.61.04Skarn
LDUG-165Infill422,128.71,990,319.8920.9170-13162.0 83.089.06.04.996.30.20Skarn
         104.0113.89.87.025.10.28Skarn
         126.0154.728.76.956.20.27Skarn
LDUG-166Infill422,128.71,990,319.8921.0170-20162.0 91.0132.041.08.924.00.21Skarn
        including112.4125.012.615.988.80.52Skarn
LDUG-168Infill422,128.71,990,319.4921.0170-28150.0 65.071.46.44.665.40.24Skarn
         111.2117.66.412.902.30.26Skarn/Gdi
LDUG-169Infill422,125.41,990,317.0921.7174-17171.0 106.0110.04.05.701.80.07Skarn
LDUG-171Infill422,125.31,990,317.0921.5177-24180.0 111.6117.05.44.163.50.14Skarn
         124.0128.04.04.203.70.33Skarn
         157.6161.84.24.478.30.57Skarn
LDUG-173Infill422,125.11,990,316.8921.5185-20243.0 129.6134.14.56.6210.90.69Skarn
         143.0153.010.08.1413.10.63Skarn
         159.0165.86.89.405.70.26Skarn
         171.1179.68.59.7612.00.53Skarn
         195.0199.94.99.0613.10.41Skarn
LDUG-176Infill422,125.11,990,316.9921.3185-27198.0 90.995.44.54.5814.62.13Skarn
LDUG-178Infill422,124.61,990,317.5921.4194-26150.0 91.697.25.60.360.50.01Skarn
LDUG-179Infill422,124.81,990,316.9921.0194-35207.0 117.7123.05.38.372.30.08Skarn
LDUG-180Infill422,124.91,990,317.1920.8191-43162.0 87.091.74.73.493.70.18Skarn
LDUG-181Infill422,125.11,990,317.1921.0185-35165.0 93.0102.49.48.599.40.46Skarn
         110.9139.028.16.0311.50.65Skarn
        Including132.7137.04.314.9760.74.08Skarn

Notes to Table 2:

  1. Intersections do not represent true thickness of mineralized zones
  2. Interval lengths for holes dipping between -45 to -90º have been selected to represent a minimum mining height of 3.5 m
  3. Interval lengths for holes dipping between 0 and -45º have been selected to represent a minimum horizontal length of 3.5 m
  4. Torex is not aware of any drilling, sampling, recovery, or other factors that could materially affect the accuracy or reliability of the data
  5. Gdi stands for granodiorite

TABLE 3: ASSAY RESULTS FROM 2021 ELG UNDERGROUND DRILL PROGRAM – SUB-SILL DEPOSIT

       Total   Intersection   
Drill-HoleProgramUTM-EUTM-NElevationAzimuthDipLength FromToCore LengthAuAgCuLithology
  (m)(m)(m)(°)(°)(m) (m)(m)(m)(g/t)(g/t)(%) 
SST-213Infill422,325.81,990,064.4986.7119-70360.0 343.9349.45.59.545.10.14Skarn
SST-214Infill422,167.01,990,095.5955.0136-51303.0 134.5138.03.51.0622.61.70Skarn
SST-215Infill422,166.91,990,095.6955.1139-39282.0 177.8183.25.53.780.50.01Skarn
SST-216Infill422,166.81,990,095.2955.5137-26222.0 190.0194.04.030.022.80.00Skarn
         202.0206.04.07.211.00.00Skarn
SST-217Infill422,167.01,990,095.7955.1136-46169.3 132.7137.54.81.1623.70.49Skarn
SST-218Infill422,167.21,990,096.0955.1119-59336.0 280.0284.54.56.542.70.01Skarn
         295.3299.54.14.521.00.00Gdi
SST-219Infill422,323.01,990,067.0986.098-72364.0 346.7352.55.80.161.40.07Skarn
SST-220Infill422,323.01,990,067.0986.0299-81330.0   No skarn intercepted in the target zone 
SST-221Infill422,366.01,989,980.01,007.0131-6180.0 153.0159.86.810.6430.21.24Skarn
SST-222Infill422,323.01,990,067.0986.0216-87464.7 258.0265.77.74.744.30.10Skarn
SST-223Infill422,366.01,989,980.01,007.0131-14180.0 151.0155.14.11.495.10.17Skarn
SST-224Infill422,323.01,990,067.0986.0134-78312.0 293.0297.54.51.663.50.13Skarn
SST-225Infill422,366.31,989,980.71,007.4126-19153.0   No skarn intercepted in the target zone 
SST-226Infill422,323.01,990,067.0986.0112-71384.0 328.5336.37.810.7110.70.44Skarn
SST-227Step-Out422,190.61,989,393.6956.9131-61150.0   No skarn intercepted in the target zone 
SST-228Step-Out422,138.71,989,355.6953.0128-54207.0 163.7167.74.01.535.60.07Skarn
SST-229Infill422,323.01,990,067.0986.0118-73360.0 291.8296.04.21.9923.61.58Skarn
SST-231Step-Out422,139.41,989,355.1953.1128-70305.0 188.8194.45.64.1538.82.35Skarn
SST-232Step-Out422,141.41,989,394.5955.0136-71405.0 75.286.511.310.21156.21.82Skarn
         105.5112.77.27.5319.90.05Skarn
SST-233Infill422,325.01,990,067.0986.7111-74363.0 307.2311.74.43.6411.20.58Skarn
         320.9327.06.14.8312.20.74Skarn
         350.7355.24.56.780.80.02Skarn
SST-234Step-Out422,141.81,989,465.7987.9124-57573.0 97.5101.84.34.185.90.17Skarn
SST-235Step-Out422,086.21,989,397.5944.4150-70501.0 336.0340.34.22.542.50.15Skarn
SST-237Step-Out422,012.31,989,300.7875.2120-60435.0 29.034.05.00.040.80.12Skarn
SST-238Infill422,332.71,990,014.51,007.589-84312.0 279.4287.47.94.120.60.01Skarn
SST-241Infill422,324.91,990,067.1986.6107-76396.0 294.0303.09.04.632.50.07Skarn
SST-244Infill422,330.11,990,018.81,007.858-88330.0 275.2300.024.85.721.60.16Skarn

Notes to Table 3:

  1. Intersections do not represent true thickness of mineralized zones
  2. Interval lengths for holes dipping between -45 to -90º have been selected to represent a minimum mining height of 3.5 m
  3. Interval lengths for holes dipping between 0 and -45º have been selected to represent a minimum horizontal length of 3.5 m
  4. Torex is not aware of any drilling, sampling, recovery, or other factors that could materially affect the accuracy or reliability of the data
  5. Gdi stands for granodiorite

FIGURE 1 – LONG-SECTION THROUGH NORTHERN AREA OF THE ELD DEPOSIT
Figure 1 is available at https://www.globenewswire.com/NewsRoom/AttachmentNg/cd17a9b1-12ed-45c4-957e-3bf319658db9

FIGURE 2 – LONG-SECTION THROUGH CENTRAL AREA OF THE ELD DEPOSIT
Figure 2 is available at https://www.globenewswire.com/NewsRoom/AttachmentNg/ba4ca738-6fd8-443f-916f-4cc91de68a9f

FIGURE 3 – LONG-SECTION THROUGH SOUTHERN AREA OF THE ELD DEPOSIT
Figure 3 is available at https://www.globenewswire.com/NewsRoom/AttachmentNg/a63507f4-18c2-4414-b31f-8215806a514d 

FIGURE 4 – LONG-SECTION THROUGH SUB-SILL
Figure 4 is available at https://www.globenewswire.com/NewsRoom/AttachmentNg/7e493f7f-de05-4c16-8d9d-1390915d7bc9 

FIGURE 5 – CROSS-SECTION THROUGH SUB-SILL DEPOSIT
Figure 5 is available at https://www.globenewswire.com/NewsRoom/AttachmentNg/da30147e-ce41-42e7-8cd9-a9b214d7de46


Comment On!

140
Upload limit is up to 1mb only
To post messages to your Socail Media account, you must first give authorization from the websites. Select the platform you wish to connect your account to CanadianInsider.com (via Easy Blurb).