Santacruz Silver Continues to Expand the High Grade Foot-Print at its Veta Grande Project in Zacatecas

Ad blocking detected

Thank you for visiting CanadianInsider.com. We have detected you cannot see ads being served on our site due to blocking. Unfortunately, due to the high cost of data, we cannot serve the requested page without the accompanied ads.

If you have installed ad-blocking software, please disable it (sometimes a complete uninstall is necessary). Private browsing Firefox users should be able to disable tracking protection while visiting our website. Visit Mozilla support for more information. If you do not believe you have any ad-blocking software on your browser, you may want to try another browser, computer or internet service provider. Alternatively, you may consider the following two offers if you want an ad-free experience.

Canadian Insider Club
$299/ year*
Daily Morning INK newsletter
+3 months archive
Canadian Market INK weekly newsletter
+3 months archive
30 publication downloads per month from the PDF store
Top 20 Gold, Top 30 Energy, Top 40 Stock downloads from the PDF store
All benefits of basic registration
No 3rd party display ads
10-day money back guarantee*
JOIN THE CLUB
Canadian Insider Ad-Free
$49/ year*
All benefits of basic registration
No 3rd party display ads
10-day money back guarantee*
GO AD-FREE

* Price is subject to applicable taxes. Money back guarantee: For bona fide Ad-Free or Canadian Insider Club subscribers, if you downgrade to Basic or cancel with-in 10 days of first subscribing, we will refund your payment upon request. Immediately after downgrading or cancelling, using the same email that is associated with your account, request a refund via our Contact Us form at the bottom of the page. We will only consider one refund request per household or organization. We cannot accommodate refund requests where an account holder has not provided verifiable address and billing information.

Paid subscriptions and memberships are auto-renewing unless cancelled (easily done via the Account Settings Membership Status page after logging in). Once cancelled, a subscription or membership will terminate at the end of the current term.

Santacruz Silver Continues to Expand the High Grade Foot-Print at its Veta Grande Project in Zacatecas

PR Newswire

TSX.V: SCZ
FSE: 1SZ    

VANCOUVER, Oct. 22, 2018 /PRNewswire/ - Santacruz Silver Mining Ltd. (TSX.V:SCZ) (the "Company" or "Santacruz") is pleased to provide an update from the Phase I drill program ongoing on the Veta Grande, Armados, and Navidad veins that form part of the Company's Veta Grande Project located in the Zacatecas mining district, Zacatecas, Mexico (see press release dated July 9, 2018).  Diamond drilling is well on its way to better define the Veta Grande and Navidad veins from surface while an underground drill rig will be used to better define the Armados vein.  To date, 19 drill holes totalling 6,165 metres have been completed.

Initial drill results at the Navidad vein are confirming high-grade vein intersections near surface and close to existing mine workings. Highlights include drill hole NA18-006 that intersected 668.84 grams per tonne silver, 0.17 grams per tonne gold, and 0.12 percent copper (698.35 grams per tonne silver-equivalent) over 1.95 metres (approximated true width), from 56.6 metres to 58.75 metres. In addition to this, the Veta Grande vein is also confirming strong mineralization to the north.

Carlos Silva, COO of Santacruz, commented; "With these drill results at the Navidad vein, and higher grade intercepts along the northern strike of the Veta Grande vein, we continue to demonstrate the potential of this high-grade mineralized district." Mr. Silva added; "We recently identified the potential of the Navidad vein, which has never been systematically explored, and results thus far are extremely encouraging. Drilling is continuing with an additional 14,000 metres of diamond drilling budgeted."

Veta Grande Project Assay Results

VEIN

DDH

From

To

Length

True Width

Au

Ag

Pb

Zn

Cu

AgEq

mts.

mts.

g/t

%

g/t

ARMADOS

AR18-006

184.85

185.2

0.35

0.33

0.63

68.00

2.92

10.40

0.35

948.66

ARMADOS

AR18-007

No Significant Intersections

ARMADOS

AR18-008

113.95

114.65

0.7

0.36

0.06

304.00

0.00

0.83

0.02

363.28

NAVIDAD

NA18-001

159.5

160.35

0.85

0.51

0.20

65.41

0.00

1.08

0.40

199.75

NAVIDAD

NA18-001

72.25

73.75

1.5

0.36

0.00

105.00

0.04

0.07

0.00

111.21

NAVIDAD

NA18-002

67.15

68.1

0.95

0.82

0.01

284.00

0.00

0.00

0.07

293.42

NAVIDAD

NA18-002

88

89.55

1.55

1.34

0.57

19.29

0.56

2.07

0.26

253.26

NAVIDAD

NA18-002

94.35

95

0.65

0.56

1.60

69.00

4.71

9.52

0.89

1124.46

NAVIDAD

NA18-002

127.75

129.65

1.9

1.65

0.81

38.16

3.25

11.30

0.01

960.57


Including

128

129

1

0.87

1.12

55.00

5.64

16.80

0.01

1456.14

NAVIDAD (ALTO)

NA18-003

67.9

70.95

3.05

2.34

0.17

35.00

0.79

5.72

0.07

451.73

NAVIDAD

NA18-004

79

81.1

2.1

1.48

0.12

312.67

0.00

0.53

0.29

393.25

NAVIDAD 

NA18-004

111.1

111.6

0.5

0.38

0.30

0.00

0.00

1.42

0.16

132.83

NAVIDAD 

NA18-004

112.85

113.45

0.6

0.46

0.33

0.00

0.00

6.12

0.10

421.96

NAVIDAD 

NA18-004

116.05

116.4

0.35

0.27

0.36

18.00

1.44

1.39

0.25

231.75

NAVIDAD (ALTO)

NA18-005

No Significant Intersections

NAVIDAD (ALTO) 

NA18-006

56.6

58.75

2.15

1.95

0.17

668.84

0.00

0.00

0.12

698.35


Including

56.6

57.5

0.9

0.82

0.29

1220.00

0.00

0.00

0.12

1258.54

NAVIDAD (ALTO) 

NA18-006

61.75

62.55

0.8

0.75

0.02

128.00

0.00

0.00

0.07

138.17

NAVIDAD (ALTO)

NA18-006

65.6

66.45

0.85

0.77

0.03

92.76

0.00

0.00

0.03

98.61

NAVIDAD 

NA18-006

165.85

166.2

0.35

0.27

0.59

259.00

0.00

0.00

0.28

341.91

SAN LORENZO (NAVIDAD)

NA18-006

168

170

2

1.88

0.56

129.15

0.00

3.03

0.63

444.62

VETA GRANDE    (ESPERANZA)

VG18-004

443.95

446.25

2.3

2.26

0.05

43.87

1.43

1.40

1.02

333.48

VETA GRANDE    (LA FLOR)

VG18-004

459.2

465.55

6.35

4.86

0.16

30.48

0.14

0.70

1.89

337.29

VETA GRANDE    

VG18-005

425.6

429.55

3.95

3.03

0.13

57.51

1.47

1.82

1.87

490.30


Including

426.65

427.1

0.45

0.34

0.07

195.00

10.20

11.20

5.79

2117.88

 

Silver equivalent (AgEq) in the drill results assumes $1,331 per ounce Au (Pau), $16.73 per ounce Ag (Pag), $1.13 per pound Pb (Ppb), $1.53 per pound Zn (Pzn), and $3.14 per pound Cu (Pcu) with 100-per-cent metallurgical recovery. The formula used in the calculation is as follows:

EqAg (g/t) equals [(Au multiplied by Pau divided by 31.1035) plus (Ag multiplied by Pag divided by 31.1035) plus (Pb multiplied by Ppb multiplied by 22.05) plus (Zn multiplied by Pzn multiplied by 22.05) plus (Cu multiplied by Pcu multiplied by 22.05)] divided by (Pag).

Quality control/quality assurance program

All drill core was logged, photographed and cut in half with a diamond saw. Half-core samples were sent to SGS Minerals Services in Durango, Mexico (17025 accredited), for preparation and analysis. Drill core samples were analyzed for 33 elements by four-acid digestion of a 0.5-gram sample followed by an ICP-AES (inductively coupled plasma atomic emission spectroscopy) finish. Overlimit for Pb, Zn and Cu were further analyzed by sodium peroxide fusion of a 0.5-gram sample followed by ICP-AES finish. Au and Ag was also analyzed by fire assay of a 30-gram sample followed by AAS (atomic absorption spectroscopy) finish for Au and gravimetric finish for Ag.

As part of the company's quality assurance/quality control (QA/QC) program, independently certified control samples (standard and blank pulp samples) were inserted in each analytical batch. Field duplicate samples were also submitted for analysis. The control and duplicate sample results were then checked to ensure proper QA/QC.

Qualified persons

The technical information contained in this news release has been reviewed and approved by Van Phu Bui, BSc, PGeo, who is independent of the company and a qualified person under National Instrument 43-101.

About Santacruz Silver Mining Ltd.

Santacruz is a Mexican focused silver company with two producing silver projects (Veta Grande Project and Rosario Project) and two exploration properties (Minillas Property and Zacatecas Properties). The Company is managed by a technical team of professionals with proven track records in developing, operating and discovering silver mines in Mexico. Our corporate objective is to become a mid-tier silver producer.

'signed'

Arturo Préstamo Elizondo,
President, Chief Executive Officer and Director

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Forward looking information

Certain statements contained in this news release constitute "forward-looking information" as such term is used in applicable Canadian securities laws. Forward-looking information is based on plans, expectations and estimates of management at the date the information is provided and is subject to certain factors and assumptions.  In making the forward-looking statements included in this news release, the Company has applied several material assumptions, that the Company's financial condition and development plans do not change as a result of unforeseen events, that third party mineralized material to be milled by the Company will have properties consistent with management's expectations, that the Company will receive all required regulatory approvals, and that future metal prices and the demand and market outlook for metals will remain stable or improve.  Forward-looking information is subject to a variety of risks and uncertainties and other factors that could cause plans, estimates and actual results to vary materially from those projected in such forward-looking information.  Factors that could cause the forward-looking information in this news release to change or to be inaccurate include, but are not limited to, the risk that any of the assumptions referred to prove not to be valid or reliable, which could result in lower revenue, higher cost, or lower production levels; delays and/or cessation in planned work; changes in the Company's financial condition and development plans; delays in regulatory approval; risks associated with the interpretation of data (including in respect of the third party mineralized material) regarding the geology, grade and continuity of mineral deposits; the possibility that results will not be consistent with the Company's expectations, as well as the other risks and uncertainties applicable to mineral exploration and development activities and to the Company as set forth in the Company's continuous disclosure filings filed under the Company's profile at www.sedar.com. There can be no assurance that any forward-looking information will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Accordingly, the reader should not place any undue reliance on forward-looking information or statements. The Company undertakes no obligation to update forward-looking information or statements, other than as required by applicable law.

Rosario Project

The decisions to commence production at the Rosario Mine, Cinco Estrellas Property and Membrillo Prospect were not based on a feasibility study of mineral reserves demonstrating economic and technical viability, but rather on a more preliminary estimate of inferred mineral resources. Accordingly, there is increased uncertainty and economic and technical risks of failure associated with this production decision. Production and economic variables may vary considerably, due to the absence of a complete and detailed site analysis according to and in accordance with NI 43-101.

Veta Grande Project

The decision to commence production at Veta Grande Project was not based on a feasibility study on mineral reserves demonstrating economic and technical viability.  Accordingly, there is increased uncertainty and economic and technical risks of failure associated with this production decision.  Production and economic variables may vary considerably due to the absence of a complete and detailed site analysis according to and in accordance with NI 43-101.

Cision View original content to download multimedia:http://www.prnewswire.com/news-releases/santacruz-silver-continues-to-expand-the-high-grade-foot-print-at-its-veta-grande-project-in-zacatecas-300734671.html

SOURCE Santacruz Silver Mining Ltd.

Copyright CNW Group 2018

Comment On!

140
Upload limit is up to 1mb only
To post messages to your Socail Media account, you must first give authorization from the websites. Select the platform you wish to connect your account to CanadianInsider.com (via Easy Blurb).