Rio Tinto Reports Positive Drill Results from Forum's Janice Lake Copper/Silver Project

Ad blocking detected

Thank you for visiting CanadianInsider.com. We have detected you cannot see ads being served on our site due to blocking. Unfortunately, due to the high cost of data, we cannot serve the requested page without the accompanied ads.

If you have installed ad-blocking software, please disable it (sometimes a complete uninstall is necessary). Private browsing Firefox users should be able to disable tracking protection while visiting our website. Visit Mozilla support for more information. If you do not believe you have any ad-blocking software on your browser, you may want to try another browser, computer or internet service provider. Alternatively, you may consider the following if you want an ad-free experience.

Canadian Insider Ultra Club
$500/ year*
Daily Morning INK newsletter
+3 months archive
Canadian Market INK weekly newsletter
+3 months archive
30 publication downloads per month from the PDF store
Top 20 Gold, Top 30 Energy, Top 40 Stock downloads from the PDF store
All benefits of basic registration
No 3rd party display ads
JOIN THE CLUB

* Price is subject to applicable taxes.

Paid subscriptions and memberships are auto-renewing unless cancelled (easily done via the Account Settings Membership Status page after logging in). Once cancelled, a subscription or membership will terminate at the end of the current term.

Vancouver, British Columbia--(Newsfile Corp. - October 1, 2019) - Forum Energy Metals Corp. (TSXV: FMC) ("Forum") is pleased to announce that it has received positive assay results from the first two holes drilled by Rio Tinto Exploration Canada ("RTEC") on its Janice Lake sedimentary-hosted copper project. Copper mineralization has been significantly expanded along strike and down dip from the initial drilling success by Forum on the Jansem showing last year. Highlights from the first two holes are:
  • JANL0002 - 0.38% Cu and 2.1g/t Ag over 44.78 metres from 45.22m to 90m, including 0.71% Cu and 4.2g/t Ag over 18 metres from 72m to 90m.
  • JANL0001 - 0.18% Cu over 63 metres from 19m to 82m

Rio Tinto Exploration Canada completed 21 holes totalling 5,209 metres this summer under an Option Agreement to earn an 80% interest in the Janice Lake project by spending $30 million in exploration. Nine holes have been completed on the Jansem target, nine on the Janice target and three on the Kaz target (Figure 1). Results from the remaining holes will be reported once received from RTEC.

Drill Hole Summary (Figure 2 & Table 1)

  • Hole JANL0001 was drilled to a depth of 261 metres and intersected 0.18% Cu over a 63 metre interval between 19m and 82m. It is located approximately 100m to the north-northwest of FEM-01 to intersect mineralization down dip from the intercept drilled by Forum last summer of 18.5 m (59.0 to 77.5m downhole depth) grading 0.94% Cu and 6.7 g/t Ag including 5.2 metres grading 2.22% Cu and 16.5 g/t Ag.
  • Hole JANL0002 was drilled to a depth of 219 metres and intersected 0.38% Cu and 2.1 g/t Ag over a 44.78 metre interval between 45.22m and 90m in depth, including 0.71% Cu and 4.2 g/t Ag over an 18 metre interval between 72m and 90m. It is located 150m along strike to the southwest of FEM-01.

With these first two drill holes, the mineralized zone at Jansem is now a minimum of 294m in strike length, 130m in width, and with an estimated true thickness varying from several metres to more than 50m. Drill holes were orientated to crosscut the stratigraphy as close as possible at right angles, as the interpretation is that the copper is mostly stratabound.

Table 1: Assay results from Jansem target

Cannot view this image? Visit: https://orders.newsfilecorp.com/files/4908/48340_a722191244795bac_006.jpg

To view an enhanced version of Table 1, please visit:
https://orders.newsfilecorp.com/files/4908/48340_a722191244795bac_006full.jpg

All drill core samples have been sent to ALS Global in Vancouver, BC for assay. Ken Wheatley, P.Geo. and Forum's VP, Exploration and Qualified Person under National Instrument 43-101, has reviewed and approved the contents of this news release.

Cannot view this image? Visit: https://orders.newsfilecorp.com/files/4908/48340_a722191244795bac_004.jpg
Figure 1: Location of the Target Areas on the Janice Lake Project

To view an enhanced version of Figure 1, please visit:
https://orders.newsfilecorp.com/files/4908/48340_a722191244795bac_004full.jpg

 

Cannot view this image? Visit: https://orders.newsfilecorp.com/files/4908/48340_a722191244795bac_005.jpg

Figure 2: Drill Hole Locations on the Jansem Target Red dots are the two RTEC holes reported in this release. The blue dots are the four Forum holes from 2018. Large black dots are 2019 RTEC holes and small black dots are historic holes.

To view an enhanced version of Figure 2, please visit:
https://orders.newsfilecorp.com/files/4908/48340_a722191244795bac_005full.jpg

Quality Control/ Quality Assurance

Core samples were sawed in half, keeping the half with the reference line for orientated core in the box. Samples averaged 2 metres in length through the mineralized zone, 4 metres in length in the unmineralized zone, however these lengths varied depending on stratigraphy, alteration or mineralization. Standards were introduced after every 20th sample, using a high grade, low grade or unmineralized, depending on the surrounding core. Duplicates were also introduced on every 20th sample, quartering the core. Blanks were used for the first sample of the hole and at the beginning and end of a mineralized interval, using certified rose quartz. The first two holes of this drill program had blank material inserted after every sample that had visual chalcocite and native copper to determine the potential smear effect. This would allow to modifications in the sample preparation for future holes in this program.

A 4-acid digestion was used on the samples at ALS lab in Vancouver, followed by analysis by ICP-MS (the ME-MS61L package). Higher grade samples will be run again through copper screen using the coarse reject material.

About Forum Energy Metals

Forum Energy Metals Corp (TSXV: FMC) explores for energy metals, including copper, nickel, platinum, palladium and uranium in Saskatchewan, Canada's Number One mining province. In addition, Forum has also established a strategic land position in the Idaho Cobalt Belt. For further information: www.forumenergymetals.com

ON BEHALF OF THE BOARD OF DIRECTORS

Richard J. Mazur, P.Geo.
President & CEO

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

For further information contact:

NORTH AMERICA 

Rick Mazur, P.Geo., President & CEO
[email protected]
Tel: 778-772-3100 

Craig Christy, VP Corporate Development
[email protected]
Tel: 250-863-0561

UNITED KINGDOM

Burns Singh Tennent-Bhohi, Director
[email protected]
Tel: 074-0316-3185

To view the source version of this press release, please visit https://www.newsfilecorp.com/release/48340

Comment On!

140
Upload limit is up to 1mb only
To post messages to your Socail Media account, you must first give authorization from the websites. Select the platform you wish to connect your account to CanadianInsider.com (via Easy Blurb).