Pulse Oil Corp. Announces Successful Phase Two Completion of the Bigoray Enhanced Oil Recovery Project

Ad blocking detected

Thank you for visiting CanadianInsider.com. We have detected you cannot see ads being served on our site due to blocking. Unfortunately, due to the high cost of data, we cannot serve the requested page without the accompanied ads.

If you have installed ad-blocking software, please disable it (sometimes a complete uninstall is necessary). Private browsing Firefox users should be able to disable tracking protection while visiting our website. Visit Mozilla support for more information. If you do not believe you have any ad-blocking software on your browser, you may want to try another browser, computer or internet service provider. Alternatively, you may consider the following if you want an ad-free experience.

Canadian Insider Ultra Club
$432/ year*
Daily Morning INK newsletter
+3 months archive
Canadian Market INK weekly newsletter
+3 months archive
30 publication downloads per month from the PDF store
Top 20 Gold, Top 30 Energy, Top 40 Stock downloads from the PDF store
All benefits of basic registration
No 3rd party display ads
JOIN THE CLUB

* Price is subject to applicable taxes.

Paid subscriptions and memberships are auto-renewing unless cancelled (easily done via the Account Settings Membership Status page after logging in). Once cancelled, a subscription or membership will terminate at the end of the current term.

Pulse Oil Corp. Announces Successful Phase Two Completion of the Bigoray Enhanced Oil Recovery Project

Canada NewsWire

CALGARY, Nov. 28, 2018 /CNW/ - Pulse Oil Corp.  ("Pulse" or the "Company") (TSX-V: PUL and PUL.WT) announced today that Pulse and its contracted technical consultants have completed Phase Two of the Bigoray Enhanced Oil Recovery (EOR) Modelling Project. Phase 2 incorporated the geological and petrophysical analysis completed in Phase 1 into a pool architecture and structural model. The Company's 3-D seismic data base was incorporated into the model, the first time modern 3-D seismic data has been involved in these pool evaluations. This detailed delineation of the pool boundaries has provided a positive alternate interpretation to those evaluations undertaken previously by the Alberta Energy Regulator and by Pulse's independent resource assessment (the "Resource Assessment") of the Company's Nisku Enhanced Oil Recovery ("EOR") project in the Bigoray area of Alberta ("Bigoray") previously news released on January 9, 2018.

Phase 3 has now started and consists of a dynamic model being used to history match existing data and run sensitivity cases simulating various development and solvent injection scenarios. This final Phase 3 work is scheduled for completion before year-end and will ensure Pulse's team make the best decisions to maximize oil recovery from these well-established Devonian-aged oil reservoirs.

Pulse President and COO, Drew Cadenhead, commented, "We are very happy with the results of our EOR project to date, in particular the Phase 2 structural interpretation of our reservoirs. Our 3-D data sheds far more detailed light on what these two pinnacle reefs look like 2 km under the surface of central Alberta and give us a new positive interpretation on some of the assumptions we have been making from past work. This is why we are going through this detailed project before implementing the physical injection scheme of the EOR. Identifying the optimal type of miscible product to use in our injection scheme as well as the optimal location of our production and injection wells will ensure we maximise the recovery factor of the remaining oil in our pools."

To register to receive interesting updates and/or press releases from Pulse Oil, please sign-up at: http://www.pulseoilcorp.com/contact.

About Pulse Oil Corp.

Pulse is a debt-free, Canadian company incorporated under the Business Corporations Act (Alberta) that is fully funded for its next year of operations including the Bigoray EOR program and drilling in Queenstown. Pulse owns 100% interests in the Bigoray area of Alberta, which includes two Nisku oil Pinnacle Reefs as well as 100% interests in producing assets. Pulse is moving forward to grow production and execute an Enhanced Oil Recovery project to unlock significant value for shareholders through control of approximately 65 net sections of land across the Mannville, Cardium, Pekisko/Shunda, Nisku and Duvernay Shale trends in Western Canada.  Pulse will also continue to focus on acquiring affordable, small to medium sized proven oil and gas assets with significant upside. The Company plans to achieve further growth through low-risk, technically diligent drilling within its Queenstown assets, infrastructure ownership and reserve growth utilizing proven enhanced oil recovery techniques and implementation of technology.

READER ADVISORY

This press release contains forward-looking statements and forward-looking information within the meaning of applicable securities laws. The words "believe," "expect," "anticipate," "plan," "intend," "foresee," "should," "would," "could" or other similar expressions are intended to identify forward-looking statements, which are generally not historical in nature.  Such statements include, without limitation, statements pertaining to Pulse's expectations related to the enhanced oil recovery program, DPIIP and maximizing oil production from Pulse's Bigoray Nisku reef pools.  Forward-looking statements are based on management's current expectations and beliefs concerning future developments and their potential effect on the Company based on information currently available to management. While management believes that these forward-looking statements are reasonable as and when made, there can be no assurance that future developments affecting Pulse will be those anticipated. Important factors that could cause actual results to differ materially from those in the forward looking statements include, but are not limited to: the volatility of commodity prices, product supply and demand, competition, access to and cost of capital, the assumptions underlying production forecasts, the quality of technical data; environmental and weather risks, including the possible impacts of climate change, the ability to obtain environmental and other permits and the timing thereto, government regulation or action, the costs, timing and results of EOR operations; the availability of equipment, services, resources and personnel required to complete the Company's planned operating activities; access to and availability of transportation, processing and refining facilities, acts of war or terrorism; and general economic conditions and other financial, operational and legal risks and uncertainties. The forward-looking statements contained in this press release are made as of the date hereof and the Company undertakes no obligations to update publicly or revise any forward-looking statements or information, whether as a result of new information, future events or otherwise, unless so required by applicable securities laws.

Neither the TSX Venture Exchange, Inc. nor its Regulation Service Provider (as that term is defined under the policies of the TSX Venture Exchange) has neither approved nor disapproved of the contents of this press release.

Cision View original content:http://www.prnewswire.com/news-releases/pulse-oil-corp-announces-successful-phase-two-completion-of-the-bigoray-enhanced-oil-recovery-project-300756487.html

SOURCE Pulse Oil Corp.

View original content: http://www.newswire.ca/en/releases/archive/November2018/28/c1149.html

Copyright CNW Group 2018

Comment On!

140
Upload limit is up to 1mb only
To post messages to your Socail Media account, you must first give authorization from the websites. Select the platform you wish to connect your account to CanadianInsider.com (via Easy Blurb).