Ad blocking detected

Thank you for visiting CanadianInsider.com. We have detected you cannot see ads being served on our site due to blocking. Unfortunately, due to the high cost of data, we cannot serve the requested page without the accompanied ads.

If you have installed ad-blocking software, please disable it (sometimes a complete uninstall is necessary). Private browsing Firefox users should be able to disable tracking protection while visiting our website. Visit Mozilla support for more information. If you do not believe you have any ad-blocking software on your browser, you may want to try another browser, computer or internet service provider. Alternatively, you may consider the following if you want an ad-free experience.

Canadian Insider Ultra Club
$500/ year*
Daily Morning INK newsletter
+3 months archive
Canadian Market INK weekly newsletter
+3 months archive
30 publication downloads per month from the PDF store
Top 20 Gold, Top 30 Energy, Top 40 Stock downloads from the PDF store
All benefits of basic registration
No 3rd party display ads
JOIN THE CLUB

* Price is subject to applicable taxes.

Paid subscriptions and memberships are auto-renewing unless cancelled (easily done via the Account Settings Membership Status page after logging in). Once cancelled, a subscription or membership will terminate at the end of the current term.

Probe Metals Announces Filing of NI 43-101 Technical Report on the Val-d’Or East Project, Quebec; Additional Ounces Captured in Resource

TORONTO, July 15, 2021 (GLOBE NEWSWIRE) -- Probe Metals Inc. (TSX-V: PRB) (OTCQB: PROBF) (“Probe” or the “Company”) is pleased to announce the filing of a technical report for its Val-d’Or East project (the “Report“) entitled, “NI 43-101 Technical Report for the Val-d’Or East Project, Abitibi Greenstone Belt, Quebec, Canada”. The Report dated July 14th , prepared in accordance with National Instrument 43-101 (“NI 43-101”) is available for review on both SEDAR (www.sedar.com) and the Company’s website (www.probemetals.com).

The Resource Estimate, which is the subject of the NI 43-101 Report, forms the basis of the Project’s upcoming Preliminary Economic Assessment (“PEA”). Upon further review of underground resource shapes the PEA and Resource consultants, Ausenco Engineering Canada Inc. (“Ausenco”) (PEA) and GoldMinds Geoservices (Resource Estimate), have identified additional gold resources that could potentially be extracted in a mining scenario. As a result, the Estimated Resource in the underground resource shapes has increased by 131,700 ounces and the total resource (open pit and underground) now stands at 1,800,900 ounces of gold in the Measured & Indicated category (“M&I”) and 2,309,600 ounces of gold in the inferred category.

Yves Dessureault, Probe’s COO, states, “We are very pleased with the progress of both the Updated Resource Estimate and the upcoming PEA. Our holistic approach to project design and open communication between our consultants has resulted in an increase of the gold resources, and potentially minable ounces, and an overall improvement of the project. We are making very good progress on the PEA and are looking forward to its release in Q3.”

The Report was prepared by Merouane Rachidi, Ph.D., P.Geo. and Claude Duplessis, P.Eng., from GoldMinds Geoservices, and Alain-Jean Beauregard, P.Geo and Daniel Gaudreault, P. Eng. from Geologica Groupe-Conseil Inc which all are “Qualified Person” as such term is defined in NI 43-101. The Report supports the scientific and technical disclosure in the updated mineral resources contained in the Company's press release dated June 1st, 2021. The scientific and technical content of this press release has been reviewed, prepared and approved by Mr. Marco Gagnon, P. Geo, Executive Vice President of Probe, who is a “Qualified Person” under NI 43-101.

Val-d’Or East Project - Summary of Mineral Resources

The Val-d’Or East Project includes the properties on the Pascalis Gold Trend, the Monique Gold Trend and the Courvan Gold Trend, which are 100% owned by Probe.

Table 1: Val-d’Or East Property (100% interest)

All Deposits /
Category

Pit-Constrained ResourcesUnderground ResourcesTotal
TonnesGrade
(Au1 g/t)
Gold
(oz.)
TonnesGrade
(Au g/t)
Gold
(oz.)
TonnesGrade
(Au g/t)
Gold
(oz.)
Measured5,111,0002.12347,600660,0002.4351,5005,771,0002.15399,100
Indicated21,404,0001.561,072,7002,602,0003.08257,90024,006,0001.721,330,600
Measured
& Indicated
26,515,0001.671,420,3003,262,0002.95309,40029,777,0001.811,729,700
Inferred20,702,0001.581,053,8008,230,0003.43906,50028,932,0002.111,960,400

1 Au symbol for Gold

As part of its land consolidation strategy for the Val-d’Or East project, Probe earned a 60% interest in the Cadillac Break East Property in joint venture with O3 Mining Inc., which includes the Sleepy deposit. The Company also owns a 100%-interest in the Val-d’Or East Lapaska and Senore properties.

Table 2: Val-d’Or East Other Properties

Deposit /
Category

Pit-Constrained ResourcesUnderground ResourcesTotal
TonnesGrade
(Au g/t)
Gold
(oz.)
TonnesGrade
(Au g/t)
Gold
(oz.)
TonnesGrade
(Au g/t)
Gold
(oz.)
Lapaska1
Total Inferred
512,0001.4724,200460,0003.1947,200972,0002.2871,300
Senore1
Total Inferred
549,0001.7831,40038,0002.683,300587,0001.8434,700
Sleepy2
Total Inferred
   1,113,0004.70167,9001,113,0004.70167,900

1 NI 43-101 Technical Report Val-d’Or East Project – October 2019, 100% interest
2 NI 43-101 Technical Report Sleepy Project – December 2014, 60% interest

The Company has demonstrated with a series of performance tests that the ore sorting technology works very well with the type of mineralization found on the Val-d’Or East project. By applying ore sorting to mineralized waste with very conservative gold recoveries additional mineral material may be extracted from the mineralized waste and thus become additional mineral resource on the Project.

Table 3: Val-d’Or East Project – Additional Pit Constrained Resource from Ore Sorting

Resources CategoryTonnesGrade (Au g/t)Ounces (oz.)
Measured996,0000.3210,300
Indicated5,799,0000.3360,900
Measured & Indicated6,795,0000.3371,200
Inferred7,438,0000.3175,300

Notes:
1. This additional pit-constrained Mineral Resource represents low grade material between a cut-off of 0.25g/t and the cut-off grade of 0.40 or 0.42g/t Au of the pit-constrained Mineral Resource from Table 1. This lower cut-off was based on the following parameters: ore sorting cost $2.00/t, Gold recovery in the ore sorting process 75% with an overall gold recovery with gravity and leaching at 68%, mass recovery in the ore sorting process 40%.

The following table presents the detailed gold resources for each of the trends/deposits that comprise the Val-d’Or East Project:

Table 4: Val-d’Or East Project – Detailed Resources

Deposit /
Category

Pit-Constrained ResourcesUnderground ResourcesTotal
TonnesGrade
(Au g/t)
Gold
(oz.)
TonnesGrade
(Au g/t)
Gold
(oz.)
Tonnes Grade
(Au g/t)
Gold
(oz.)
Pascalis Gold Trend
Measured4,491,0002.20317,300640,0002.4049,4005,131,0002.22366,700
Indicated6,307,0001.76356,500766,0002.6465,0007,073,0001.85421,500
Mes & Ind10,798,0001.94673,8001,406,0002.53114,40012,204,0002.01788,200
Inferred6,007,0001.63315,5002,694,0002.77239,9008,701,0001.99555,500
Monique Gold Trend
Measured------------------
Indicated12,388,0001.38548,0001,231,0003.15124,80013,619,0001.54672,800
Mes & Ind12,388,0001.38548,0001,231,0003.15124,80013,619,0001.54672,800
Inferred9,082,0001.41411,0002,651,0003.06260,40011,733,0001.78671,400
Courvan Gold Trend
Measured620,0001.5230,30020,0003.222,100640,0001.5732,400
Indicated2,710,0001.93168,200604,0003.5068,0003,314,0002.22236,200
Mes & Ind3,330,0001.85198,500624,0003.4970,1003,954,0002.11268,600
Inferred5,613,0001.81327,3002,885,0004.38406,2008,498,0002.68733,500
Lapaska Deposit
Inferred512,0001.4724,200460,0003.1947,200972,0002.2871,300
Senore Deposit
Inferred549,0001.7831,40038,0002.683,300587,0001.8434,700
Sleepy Deposit
Inferred------1,113,0004.70167,9001,113,0004.70167,900

Notes:
1. Mineral resources which are not mineral reserves do not have demonstrated economic viability. The estimate of mineral resources may be materially affected by environmental, permitting, legal, title, market or other relevant issues. The quantity and grade of reported inferred Resources are uncertain in nature and there has not been sufficient work to define these inferred resources as indicated or measured resources.

2. The database used for this mineral estimate includes drill results obtained from historical to the recent 2020 drill program.
3. The pit-constrained updated Mineral Resources are reported at a cut-off grade of 0.42g/t Au for the Monique deposit and 0.40g/t for the other deposits. These cut-offs were calculated at a gold price of US$1,600 with an exchange rate of 1.333 US$/C$ per troy ounce. They were based on the following parameters: mining cost 3.00 or 3.50$/t, processing + G&A costs $21.50/t, transport cost to the central processing facility based on distance on existing roads @ $0.15/t.km, Au recovery 95%, pit slopes from 48° to 59° as per the press release of February 23rd, 2021.
4. The underground Mineral Resources were based on two main mining methods, long-hole retreat at $82/t depending on width of stopes, and mechanized cut & fill at $110/t and the same above ground unit cost as for the pit-constrained scenario, resulting in cut-off grades of 1.65 and 2.05 g/t Au. These cut-off grades were then used to delineate continuous underground mineral shapes above the calculated cut-off grades. Blocks within those UG mineral shapes that are below the cut-off were included as dilution material and the grade reported represents the average of all UG mineral shapes thus delineated.
5. The geological interpretation of the deposits was based on lithologies and the observation that mineralized domains occur either within or proximal to sub-vertical dykes, deformation zones or as low dipping quartz tourmaline vein sets.
6. The mineral resource presented here were estimated with a block size of 5m X 5m X 5m for the Monique pit-constrained Mineral Resource and a block size of 2.5m X 2.5m X 2.5m for all others.
7. The blocks were interpolated from equal length composites calculated from the mineralized intervals. Prior to compositing, high-grade gold assays were capped (capping maximum ranges from 28 to 100 g/t Au depending on the deposit). Depending on the deposit, the composites were 1.0 metre or 1.5 metres.
8. The mineral estimation was completed using the inverse distance to the square methodology utilizing three passes. For each pass, search ellipsoids followed the geological interpretation trends were used.
9. The Mineral Resources have been classified under the guidelines of the CIM Standards on Mineral Resources and Reserves, Definitions and Guidelines prepared by the CIM Standing Committee on Reserve Definitions and adopted by CIM Council (2019), and procedures for classifying the reported Mineral Resources were undertaken within the context of the Canadian Securities Administrators NI 43-101.
10. In order to accurately estimate the resources, underground voids (shaft, ramp and drifts) and the existing pits were subtracted from the mineralized bodies modeled prior to the pit optimization.
11. Tonnage estimates are based on measured rock densities by Gold Trend. 2.82 tonnes per cubic metre for the Courvan Gold Trend, 2.83 for the Pascalis Gold Trend and 2.88 for the Monique Gold Trend. Results are presented undiluted and in situ for the pit-constrained resources and diluted for the UG resources.
12. This mineral resource estimate is dated June 1, 2021 and the cut-off date for the drillhole database used to produce this updated mineral resource estimate is May 8, 2021. Tonnages and ounces in the tables are rounded to nearest thousand and hundred respectively. Numbers may not total due to rounding.
13. Additional details are provided in the technical report.

About the Val-d’Or East Project

Since 2016, Probe Metals has been consolidating its land position in the highly prospective Val-d’Or East area in the province of Quebec. The Val-d’Or East project is a district-scale land package comprising 436 square kilometers and represents one of the largest land holdings in the Val-d’Or mining camp. The property is host to three past producing mines (Beliveau Mine, Monique Mine and Bussiere Mine) and falls along four regional mine trends, including 14 kilometres of strike length along the prolific Cadillac Break. Val-d’Or East is situated in a politically stable and low-cost mining environment that hosts numerous active producers and mills.

About Probe Metals:
Probe Metals Inc. is a leading Canadian gold exploration company focused on the acquisition, exploration and development of highly prospective gold properties. The Company is committed to discovering and developing high-quality gold projects, including its key asset the multimillion-ounce Val-d’Or East Gold Project, Quebec. The Company is well-funded and controls a strategic land package of approximately 1,000-square-kilometres of exploration ground within some of the most prolific gold belts in Quebec. The Company was formed as a result of the $526M sale of Probe Mines Limited to Goldcorp Inc. in March 2015. Newmont Corporation currently owns approximately 11.6% of the Company.

On behalf of Probe Metals Inc.,

Dr. David Palmer,
President & Chief Executive Officer

For further information:

Please visit our website at www.probemetals.com or contact:

Seema Sindwani
Director of Investor Relations
[email protected]
+1.416.777.9467

Forward-Looking Statements

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release. This News Release includes certain "forward-looking statements" which are not comprised of historical facts. Forward-looking statements include estimates and statements that describe the Company’s future plans, objectives or goals, including words to the effect that the Company or management expects a stated condition or result to occur. Forward-looking statements may be identified by such terms as “believes”, “anticipates”, “expects”, “estimates”, “may”, “could”, “would”, “will”, or “plan”. Since forward-looking statements are based on assumptions and address future events and conditions, by their very nature they involve inherent risks and uncertainties. Although these statements are based on information currently available to the Company, the Company provides no assurance that actual results will meet management’s expectations. Risks, uncertainties and other factors involved with forward-looking information could cause actual events, results, performance, prospects and opportunities to differ materially from those expressed or implied by such forward-looking information. Forward looking information in this news release includes, but is not limited to, the Company’s objectives, goals or future plans, statements, exploration results, potential mineralization, the estimation of mineral resources, exploration and mine development plans, timing of the commencement of operations and estimates of market conditions. Factors that could cause actual results to differ materially from such forward-looking information include, but are not limited to failure to identify mineral resources, failure to convert estimated mineral resources to reserves, the inability to complete a feasibility study which recommends a production decision, the preliminary nature of metallurgical test results, delays in obtaining or failures to obtain required governmental, environmental or other project approvals, political risks, inability to fulfill the duty to accommodate First Nations and other indigenous peoples, uncertainties relating to the availability and costs of financing needed in the future, changes in equity markets, inflation, changes in exchange rates, fluctuations in commodity prices, delays in the development of projects, capital and operating costs varying significantly from estimates and the other risks involved in the mineral exploration and development industry, and those risks set out in the Company’s public documents filed on SEDAR. Although the Company believes that the assumptions and factors used in preparing the forward-looking information in this news release are reasonable, undue reliance should not be placed on such information, which only applies as of the date of this news release, and no assurance can be given that such events will occur in the disclosed time frames or at all. The Company disclaims any intention or obligation to update or revise any forward-looking information, whether as a result of new information, future events or otherwise, other than as required by law.


Comment On!

140
Upload limit is up to 1mb only
To post messages to your Socail Media account, you must first give authorization from the websites. Select the platform you wish to connect your account to CanadianInsider.com (via Easy Blurb).