Positive drill results advance New Ingerbelle deposit

Ad blocking detected

Thank you for visiting CanadianInsider.com. We have detected you cannot see ads being served on our site due to blocking. Unfortunately, due to the high cost of data, we cannot serve the requested page without the accompanied ads.

If you have installed ad-blocking software, please disable it (sometimes a complete uninstall is necessary). Private browsing Firefox users should be able to disable tracking protection while visiting our website. Visit Mozilla support for more information. If you do not believe you have any ad-blocking software on your browser, you may want to try another browser, computer or internet service provider. Alternatively, you may consider the following if you want an ad-free experience.

Canadian Insider Ultra Club
$432/ year*
Daily Morning INK newsletter
+3 months archive
Canadian Market INK weekly newsletter
+3 months archive
30 publication downloads per month from the PDF store
Top 20 Gold, Top 30 Energy, Top 40 Stock downloads from the PDF store
All benefits of basic registration
No 3rd party display ads
JOIN THE CLUB

* Price is subject to applicable taxes.

Paid subscriptions and memberships are auto-renewing unless cancelled (easily done via the Account Settings Membership Status page after logging in). Once cancelled, a subscription or membership will terminate at the end of the current term.

Positive drill results advance New Ingerbelle deposit

PR Newswire

TSX: CMMC

VANCOUVER, Feb. 1, 2018 /PRNewswire/ - Copper Mountain Mining Corporation (TSX: CMMC) (the "Company" or "Copper Mountain") is pleased to announce all results from its drilling program at the New Ingerbelle deposit at the Copper Mountain mine.

Long Section Looking North showing 2017 Ingerbelle Drillholes (Note: Drill holes projected to a single pane so orientations may appear distorted.) (CNW Group/Copper Mountain Mining Corporation)

Results from the fourteen completed drill holes, totalling 4,750m are summarized in the table below.  The drill program was successful as follows:

  1. Validated and confirmed historical data and therefore resources that are currently classified as Inferred can now be upgraded to categories based on mineralization continuity and data density;
  2. Drilling intersected mineralization peripheral to the block model indicating potential for the expansion of resources both laterally, and at depth;
  3. Drill hole assays confirmed the high gold tenor of the Ingerbelle mineralization estimated from historical production data to average 0.66g/t Au for every 1% of copper grade.  

Drill hole locations were designed so as to intersect the historically defined mineralization in an evenly distributed pattern to the extent that topography, and water or backfilled areas, would allow (see attached map and section). Historical drill data in the Ingerbelle deposit consisted of 582 drill-holes totalling 80,500m, approximately half of which are below the previously mined area.  The 35 significant drill intersections from the current program, as tabulated below, have an average Cu Eq grade of 0.48% ( 0.34% Cu, 0.70g/t Ag and 0.22g/tAu).

The Ingerbelle resource, estimated from the historical data (inferred) that is within a whittle pit shell, generated using a US$2.75 copper price and current mine costs, contains 104Mt grading 0.42% Cu  Eq. (0.30% Cu and 0.20g/t Au) based on a 0.2% copper cut-off grade.  A revised resource estimate, using both historical and new drill data, will be completed in the near future.  Additional drill programs and engineering studies will be designed to upgrade resources to reserve status and targeted to define sufficient reserves that could contribute an additional 10 years of production to Copper Mountain's life-of-mine plan.

New Ingerbelle: Significant Drill Intersections

Hole ID

Azi

Dip

From (m)

To (m)

Interval (m)

Cu %

Au g/t

Ag g/t

Cu Eq1 %

17IG-01*

317

-49

3.0

161.0

158.0

0.29

0.22

0.49

0.42

Incl



3.0

75.0

72.0

0.42

0.30

0.62

0.60

17IG-02*

134

-49

32.6

57.0

24.2

0.40

0.41

0.66

0.65




90.6

212.3

121.7

0.36

0.16

1.00

0.46

Incl



90.6

188.1

97.5

0.54

0.26

1.61

0.71

17IG-03*

207

-51

90.5

185.0

94.5

0.27

0.20

0.52

0.39




249.0

267.3

18.3

0.29

0.25

0.61

0.44

17IG-04*

267

-51

17.4

54.0

36.6

0.25

0.17

0.54

0.36




78.3

118.0

39.7

0.39

0.31

0.86

0.58




145.4

194.2

48.8

0.39

0.28

0.68

0.56




212.5

252.1

39.6

0.57

0.36

0.86

0.79




270.4

367.9

97.5

0.24

0.21

0.38

0.37

17IG-05

217

-48

172.8

218.6

45.8

0.19

0.08

0.29

0.24




367.8

389.2

21.4

0.24

0.14

0.26

0.33

17IG-06

131

-49

258.2

282.6

24.4

0.43

0.43

0.93

0.69




337.4

361.8

24.4

0.35

0.25

0.59

0.50

17IG-07

334

-51

81.4

121.0

39.6

0.27

0.07

0.60

0.32




227.7

316.1

88.4

0.40

0.3

0.77

0.58




364.9

401.4

36.5

0.19

0.11

0.39

0.26

17IG-08

28

-65

239.9

264.3

24.4

0.26

0.23

0.27

0.40

17IG-09

23

-58

44.8

63.1

18.3

0.37

0.06

1.29

0.41




178.9

200.3

21.4

0.48

0.07

1.65

0.53




386.2

541.6

155.4

0.30

0.24

0.48

0.45

17IG-10

24

-48

60.1

105.8

45.7

0.33

0.12

1.18

0.41

17IG-11

332

-46

38.7

96.6

57.9

0.47

0.21

1.01

0.60




105.8

142.3

36.5

0.51

0.16

0.46

0.61

17IG-12

48

-46

75.3

163.7

88.4

0.28

0.18

0.62

0.39




197.2

230.7

33.5

0.46

0.32

0.84

0.66




246.0

261.2

15.2

0.34

0.24

0.57

0.49




270.4

313.0

42.6

0.24

0.25

0.59

0.39

17IG-14

285

56

108.8

148.4

39.6

0.29

0.15

0.86

0.39




188.1

252.1

64.0

0.36

0.25

0.85

0.51

17IG-15

111

-56

60.1

114.9

54.8

0.49

0.29

0.52

0.67




136.3

188.1

51.8

0.16

0.11

0.34

0.23




322.2

340.5

18.3

0.40

0.27

0.78

0.57


*Results previously released

1: CuEq % : Calculated using US$3.10/lb Cu, US$1,275/oz Au, US $18/oz Ag; with recoveries of 82%, 70%, and 55% for Cu,

Au and Ag, respectively. Transportation costs and smelter terms applied.

2: 17IG-13 was abandoned in overburden.

 

About Copper Mountain Mining Corporation:

Copper Mountain's flagship asset is the Copper Mountain mine located in southern British Columbia near the town of Princeton. The Company has a strategic alliance with Mitsubishi Materials Corporation who owns 25% of the mine. The Copper Mountain mine has a large resource of copper that remains open laterally and at depth. This significant exploration potential is being explored over the next few years in order to fully appreciate the property's full development potential. Additional information is available on the Company's web page at www.CuMtn.com.

Qualified Person

Peter Holbek is a Qualified Person as defined by National Instrument 43:101 and has reviewed and approved the technical content of this release.

On behalf of the Board of

COPPER MOUNTAIN MINING CORPORATION

"Peter Holbek, M.Sc., P. Geo."

Note:  This release contains forward-looking statements that involve risks and uncertainties.  These statements may differ materially from actual future events or results.  Readers are referred to the documents, filed by the Company on SEDAR at www.sedar.com, specifically the most recent reports which identify important risk factors that could cause actual results to differ from those contained in the forward-looking statements.  The Company undertakes no obligation to review or confirm analysts' expectations or estimates or to release publicly any revisions to any forward-looking statement.

New Ingerbelle with 2017 diamond drill holes projected to plan view.  Section line in the previous image is through the center of the above diagram. (CNW Group/Copper Mountain Mining Corporation)

SOURCE Copper Mountain Mining Corporation

Copyright CNW Group 2018

Comment On!

140
Upload limit is up to 1mb only
To post messages to your Socail Media account, you must first give authorization from the websites. Select the platform you wish to connect your account to CanadianInsider.com (via Easy Blurb).