Playfair Mining Ltd. Ox Mountain Project: Drilling Update at Cloonacool

Ad blocking detected

Thank you for visiting CanadianInsider.com. We have detected you cannot see ads being served on our site due to blocking. Unfortunately, due to the high cost of data, we cannot serve the requested page without the accompanied ads.

If you have installed ad-blocking software, please disable it (sometimes a complete uninstall is necessary). Private browsing Firefox users should be able to disable tracking protection while visiting our website. Visit Mozilla support for more information. If you do not believe you have any ad-blocking software on your browser, you may want to try another browser, computer or internet service provider. Alternatively, you may consider the following if you want an ad-free experience.

Canadian Insider Ultra Club
$432/ year*
Daily Morning INK newsletter
+3 months archive
Canadian Market INK weekly newsletter
+3 months archive
30 publication downloads per month from the PDF store
Top 20 Gold, Top 30 Energy, Top 40 Stock downloads from the PDF store
All benefits of basic registration
No 3rd party display ads
JOIN THE CLUB

* Price is subject to applicable taxes.

Paid subscriptions and memberships are auto-renewing unless cancelled (easily done via the Account Settings Membership Status page after logging in). Once cancelled, a subscription or membership will terminate at the end of the current term.

Playfair Mining Ltd. Ox Mountain Project: Drilling Update at Cloonacool

VANCOUVER, BC--(Marketwired - November 03, 2016) - Playfair Mining (TSX VENTURE: PLY) is pleased to report that core drilling is progressing well at its Cloonacool Prospect in the Ox Mountains, County Sligo, Ireland.

Six core holes have been completed to date for a total of 526 metres; all six have intersected the gold- bearing quartz vein at Cloonacool; no assays have been received to date.

Results of two lines of chip samples over the outcropping quartz vein at Cloonacool showed 3.38 g/t gold over 1.20 metres comprising 5.58 g/t gold over 50 cm, and 1.80 gpt gold over 70cm. A later 50 cm (apparent width) chip sample across this vein taken by an independent geologist, Thomas Hawkins Ph.D, P.Geo returned values of 17.40 g/t gold and 8.20 g/t silver.

Drillholes are tracing the gold bearing quartz vein at Cloonacool 200 metres northwesterly towards a major East-West geological structure identified by regional geophysical surveys.

At Cabragh, 11 kilometres northeast of Cloonacool, prospecting found gold in several blocks up to 23.9 g/t gold. A further sample of this block taken by an independent geologist, Thomas Hawkins Ph.D, P.Geo returned values of 33.5 g/t gold and 30.8 g/t silver.

Regional geophysical surveys have identified strong northwest-southeast structures near to the Cabragh gold occurrences. Playfair believes these structures are the likely source of the gold bearing blocks and drilling is planned to test this interpretation.

Playfair Mining has entered into an Option Agreement to acquire up to a 100% interest in Bowpark Exploration (Ireland) Ltd. Bowpark is a private company registered in Ireland and holds as its sole asset 3 contiguous prospecting licenses over the Ox Mountains in County Sligo, Ireland.

Richard Parker and Andy Bowden are carrying out and overseeing these approved exploration programs on behalf of Playfair and Bowpark. Both are qualified persons as defined by National Instrument 43-101 and they have reviewed and approved the contents of this News Release. Thomas Hawkins Ph.D, P.Geo is a qualified person as defined by National Instrument 43-101 and he has approved the references to his sampling.

ON BEHALF OF THE BOARD

D. Neil Briggs, Director

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Forward-Looking Statements: This Playfair Mining Ltd News Release may contain certain "forward-looking" statements and information relating to Playfair which are based on the beliefs of Playfair management, as well as assumptions made by and information currently available to Playfair management. Such statements reflect the current risks, uncertainties and assumptions related to certain factors including, without limitations, exploration and development risks, expenditure and financing requirements, title matters, operating hazards, metal prices, political and economic factors, competitive factors, general economic conditions, relationships with vendors and strategic partners, governmental regulation and supervision, seasonality, technological change, industry practices, and one-time events. Should any one or more of these risks or uncertainties materialize or change, or should any underlying assumptions prove incorrect, actual results and forward-looking statements may vary materially from those described herein.

Playfair Mining
Tel: 604 687-7178
Toll Free: 888-244-6644
www.playfairmining.com

Comment On!

140
Upload limit is up to 1mb only
To post messages to your Socail Media account, you must first give authorization from the websites. Select the platform you wish to connect your account to CanadianInsider.com (via Easy Blurb).