NexGen Energy Ltd. - Hole AR-16-81c3 Returns 23.0 m at 17.19% U3O8 including 5.0 m at 49.27% U3O8 including High Grade Gold at the Arrow Deposit

Ad blocking detected

Thank you for visiting CanadianInsider.com. We have detected you cannot see ads being served on our site due to blocking. Unfortunately, due to the high cost of data, we cannot serve the requested page without the accompanied ads.

If you have installed ad-blocking software, please disable it (sometimes a complete uninstall is necessary). Private browsing Firefox users should be able to disable tracking protection while visiting our website. Visit Mozilla support for more information. If you do not believe you have any ad-blocking software on your browser, you may want to try another browser, computer or internet service provider. Alternatively, you may consider the following if you want an ad-free experience.

Canadian Insider Ultra Club
$500/ year*
Daily Morning INK newsletter
+3 months archive
Canadian Market INK weekly newsletter
+3 months archive
30 publication downloads per month from the PDF store
Top 20 Gold, Top 30 Energy, Top 40 Stock downloads from the PDF store
All benefits of basic registration
No 3rd party display ads
JOIN THE CLUB

* Price is subject to applicable taxes.

Paid subscriptions and memberships are auto-renewing unless cancelled (easily done via the Account Settings Membership Status page after logging in). Once cancelled, a subscription or membership will terminate at the end of the current term.

NexGen Energy Ltd. - Hole AR-16-81c3 Returns 23.0 m at 17.19% U3O8 including 5.0 m at 49.27% U3O8 including High Grade Gold at the Arrow Deposit

Canada NewsWire

Photo_Asset_1

VANCOUVER, July 19, 2016 /CNW/ - NexGen Energy Ltd. ("NexGen" or the "Company") (TSX:NXE) is pleased to report assay results for 8 holes from our recently completed winter 2016 drilling program on our 100% owned, Rook I property, Athabasca Basin, Saskatchewan.

Highlights:

A2 Sub-Zone

Extensive and continuous high grade uranium mineralization in the higher grade A2 sub-zone (the "Sub-Zone) is confirmed with 2 assay results reported herein.

  • AR-16-81c3 (127 m up-dip and southwest from AR-15-44b) intersected 23.0 m at 17.19% U3O8 including 9.5 m at 39.82% U3O8 and 5.0 m at 49.27% U3O8.
  • AR-16-86c1 (84 m up-dip and southwest from AR-15-44b) intersected 44.5 m at 8.85% U3O8 including 19.0 m at 20.40% U3O8 and 5.0 m at 39.52% U3O8.

A2 Shear High Grade Domain

  • AR-16-80c4 (110 m up-dip and southwest from AR-15-44b) intersected 25.0 m at 6.38% U3O8 including 10.0 m at 14.66% U3O8.
  • AR-16-84c2 (33 m up-dip and northeast from AR-15-44b) intersected 39.0 m at 2.10% U3O8 including 18.5 m at 4.27% U3O8.
  • AR-16-84c3 (34 m up-dip and northeast from AR-15-44b) intersected 31.0 m at 3.26% U3O8 including 18.0 m at 5.58% U3O8 and 6.5 m at 10.89% U3O8.
  • AR-16-85c1 (90 m up-dip and southwest from AR-15-44b) intersected 24.0 m at 4.40% U3O8 including 3.5 m at 29.15% U3O8.

Substantial mineralization was intersected completely outside the current boundary of the A2 high grade domain in six holes (Figure 1). There is significant potential for continued expansion and this will be a focus of the 35,000 m summer drilling program.

High Grade Gold

High grade assays intersected in the A2 shear also contain high grade gold and silver values, with individual 0.5 m samples ranging from below detection limits up to 90.4 g/t Au and 418 g/t Ag (Table 1). Hole AR-16-81c3 returned 9.5 m at 7.9 g/t Au and AR-16-86c1 returned 20.4 m at 1.9 g/t Au. Also of significant importance, geochemical analyses continue to show very low concentrations of deleterious elements (arsenic, antimony, selenium), which is a favourable characteristic for processing of uranium ores in the Athabasca Basin.

A three-dimensional view of the A2 High Grade Domain, a plan map, and the A2 long section are shown in Figures 1 to 3.

Arrow, Activities & Financial

  • The land-based and basement hosted Arrow Deposit currently covers an area of 870 m by 280 m with a vertical extent of mineralization commencing from 100 m to 920 m, and remains open in most directions and at depth.
  • The summer 2016 program comprising 35,000 m of drilling is underway with six drill rigs active. A seventh drill rig will be put into service imminently.
  • The Company has cash on hand of approximately $100 million.

 

Garrett Ainsworth, Vice-President, Exploration and Development, commented "Our winter drilling program has exceeded all of our expectations. As shown in Figure 1, drill holes -81c3 and -86c1 are on the very edges of the A2 high grade domain where substantial intervals of high grade uranium are completely outside the high grade domain. We look forward to delivering continued success throughout the summer program and beyond."

Leigh Curyer, Chief Executive Officer commented: "Assay results today continue to show the robustness of the A2 Sub-Zone which continuously returns high uranium grades on a world scale. These results are also inclusive of significant gold values and very low deleterious elements which is a favourable characteristic for processing of uranium ores in the Athabasca Basin."

Table 1: Selected A2 Shear Assay Results

Drill Hole

SRC Geoanalytical Results

Hole ID

From
(m)

To
(m)

Interval
(m)

U3O8
(wt%)

Au
(g/t)

Ag
(g/t)

Cu
(wt%)

Mo
(wt%)

As
(wt%)

Sb
(wt%)

Se
(wt%)

AR-16-80c4

incl.

529.0

554.0

25.0

6.38

1.1

37.8

0.07

0.18

<0.01

<0.01

<0.01

536.0

546.0

10.0

14.66

2.4

73.7

0.04

0.28

0.01

<0.01

0.01

AR-16-81c3

incl.

incl.

incl.

546.0

569.0

23.0

17.19

3.4

77.5

0.25

0.20

0.02

<0.01

0.01

553.5

563.0

9.5

39.82

7.9

163.9

0.57

0.23

0.03

<0.01

0.02

555.0

560.0

5.0

49.27

10.7

210.3

0.85

0.24

0.04

<0.01

0.02

559.5

560.0

0.5

43.20

90.4

209.0

0.61

0.19

0.01

<0.01

0.02

AR-16-84c2

incl.

535.5

574.5

39.0

2.10

0.3

11.2

0.05

0.04

<0.01

<0.01

<0.01

554.0

572.5

18.5

4.27

0.5

18.9

0.05

0.04

0.01

<0.01

<0.01

AR-16-84c3

incl.

incl.

540.0

571.0

31.0

3.26

0.2

18.1

0.08

0.05

0.01

<0.01

<0.01

548.5

566.5

18.0

5.58

0.3

28.6

0.12

0.05

0.02

<0.01

0.01

560.0

566.5

6.5

10.89

0.6

54.4

0.25

0.12

0.03

<0.01

0.01

AR-16-85c1

incl.

incl.

460.0

484.0

24.0

4.40

0.2

37.5

0.01

0.01

0.05

<0.01

<0.01

465.5

469.0

3.5

29.15

0.9

252.0

0.05

0.04

0.29

<0.01

<0.01

467.0

467.5

0.5

49.00

0.8

418.0

0.04

0.03

0.25

<0.01

<0.01

AR-16-86c1

incl.

incl.

402.0

446.5

44.5

8.85

0.9

49.0

0.05

0.13

0.05

<0.01

0.01

423.5

442.5

19.0

20.40

1.9

113.1

0.11

0.28

0.10

<0.01

0.03

428.5

433.5

5.0

39.52

1.0

199.2

0.05

0.22

0.24

<0.01

0.03

 

Composite parameters:

  • Minimum thickness 0.5 m downhole
  • Cutoff grade 0.01% U3O8
  • Maximum internal dilution 2.00 m downhole
  • U3O8, Ag, Cu, Mo analyzed by ICP-OES, Au analyzed by fire assay, As, Sb, Se analyzed by ICP-MS at SRC Geoanalytical Laboratories, Saskatoon, Saskatchewan.
  • All depths and intervals are meters downhole, true thicknesses are yet to be determined

 

Table 2: Arrow Deposit Assay Results




Drill Hole

Athabasca Group -
Basement
Unconformity Depth
(m)

SRC Geoanalytical Results

Hole ID

Azimuth

Dip

Total
Depth
(m)

From (m)

To (m)

Interval
(m)

U3O8 (wt%)

AR-16-80c3

147

-70

585.00

120.20

450.50

452.00

1.50

0.05






469.00

471.00

2.00

0.85






474.00

509.00

35.00

0.70






515.00

520.00

5.00

0.04






537.50

554.00

16.50

0.16






556.50

560.00

3.50

0.08






568.00

578.00

10.00

0.06

AR-16-80c4

147

-70

618.00

120.20

487.50

493.00

5.50

0.10






496.00

508.50

12.50

0.40






511.00

526.00

15.00

0.89






529.00

554.00

25.00

6.38





incl.

536.00

546.00

10.00

14.66






571.00

588.00

17.00

0.08






602.50

605.00

2.50

0.04

AR-16-81c3

145

-69

932.00

111.00

513.50

518.50

5.00

0.19






521.00

531.50

10.50

0.22






535.50

539.50

4.00

0.05






546.00

569.00

23.00

17.19





incl.

553.50

563.00

9.50

39.82





incl.

555.00

560.00

5.00

49.27






594.50

595.50

1.00

0.05






604.50

611.00

6.50

0.13






614.00

615.50

1.50

0.02






620.00

622.00

2.00

0.10






628.00

629.00

1.00

0.03






634.00

636.00

2.00

0.10






645.00

650.50

5.50

0.14






661.50

679.00

17.50

0.13






698.00

698.50

0.50

0.03






704.00

713.00

9.00

0.27






717.00

718.00

1.00

0.10






725.00

730.00

5.00

0.02






764.50

771.00

6.50

0.05






782.00

783.00

1.00

0.02






804.50

805.50

1.00

0.04






817.50

830.00

12.50

0.06






833.50

834.50

1.00

0.07






839.50

849.00

9.50

0.05






894.00

899.00

5.00

0.76






904.50

906.00

1.50

0.04

AR-16-84c2

315

-71

864.00

127.00

409.00

413.00

4.00

0.11






417.00

425.50

8.50

0.05






440.50

445.00

4.50

0.01






448.50

452.00

3.50

0.02






458.50

459.50

1.00

0.04






469.50

484.50

15.00

0.04






487.00

493.00

6.00

0.06






499.50

500.00

0.50

0.04






514.00

523.00

9.00

0.11






535.50

574.50

39.00

2.10





incl.

554.00

572.50

18.50

4.27






580.00

581.50

1.50

0.58






584.50

590.00

5.50

1.12






595.00

597.50

2.50

0.04






612.00

617.50

5.50

0.03






624.00

625.50

1.50

0.05






672.00

686.00

14.00

0.07






689.00

690.00

1.00

0.01






694.50

711.50

17.00

0.04

AR-16-84c3

315

-71

813.00

127.00

419.50

423.50

4.00

0.04






427.00

427.50

0.50

0.03






433.00

445.00

12.00

0.04






452.00

453.50

1.50

0.18






457.50

460.50

3.00

0.04






465.50

466.50

1.00

0.02






472.50

485.00

12.50

0.03






490.00

496.50

6.50

0.03






501.00

513.00

12.00

0.02






540.00

571.00

31.00

3.26





incl.

548.50

566.50

18.00

5.58





incl.

560.00

566.50

6.50

10.89






576.00

581.00

5.00

1.76






585.00

586.00

1.00

0.06






588.50

593.50

5.00

0.15






677.50

680.00

2.50

0.26






692.00

698.50

6.50

0.11






704.00

717.00

13.00

1.39






719.50

733.50

14.00

0.35






739.50

744.00

4.50

0.03






763.50

772.50

9.00

0.03

AR-16-85c1

143

-70

978.00

114.40

404.50

405.00

0.50

0.10






410.00

410.50

0.50

0.08






416.50

418.00

1.50

0.09






430.50

444.50

14.00

0.03






460.00

484.00

24.00

4.40





incl.

465.50

469.00

3.50

29.15






590.00

599.00

9.00

0.03






636.00

643.50

7.50

0.04






646.00

653.50

7.50

0.03






660.00

660.50

0.50

0.06






663.00

674.50

11.50

0.53






677.00

682.00

5.00

0.02






702.50

709.00

6.50

0.01






731.50

735.00

3.50

0.05






816.00

817.00

1.00

0.20






825.00

832.00

7.00

0.13






835.50

838.50

3.00

0.40






851.00

852.50

1.50

0.05






864.50

875.50

11.00

0.06






878.50

879.00

0.50

0.16






893.00

895.50

2.50

0.12






921.00

922.00

1.00

0.05






940.00

942.00

2.00

0.10






954.50

955.00

0.50

0.15

AR-16-85c2

143

-70

606.00

114.40

428.00

472.00

44.00

0.37






475.00

495.50

20.50

0.05






529.00

532.00

3.00

0.01






579.50

581.50

2.00

0.02






599.50

601.00

1.50

0.02

AR-16-86c1

142

-71

897.00

110.50

402.00

446.50

44.50

8.85





incl.

423.50

442.50

19.00

20.40





incl.

428.50

433.50

5.00

39.52






449.00

488.00

39.00

0.10






494.00

503.50

9.50

0.11






513.50

520.00

6.50

0.03






560.00

566.00

6.00

0.04






571.00

625.00

54.00

0.10






630.00

632.50

2.50

0.01






637.00

665.00

28.00

0.26






670.00

671.00

1.00

0.05






680.50

692.50

12.00

0.15






696.50

719.00

22.50

0.32






722.50

726.50

4.00

0.93






729.00

730.00

1.00

0.07






744.00

756.00

12.00

0.33






758.50

760.00

1.50

0.07






767.50

769.00

1.50

0.30






817.00

824.50

7.50

0.51






829.50

845.50

16.00

0.74

 

Composite parameters:

  • Minimum thickness 0.5 m downhole
  • Cutoff grade 0.01% U3O8
  • Maximum internal dilution 2.00 m downhole
  • U3O8 analyzed by ICP-OES at SRC Laboratories, Saskatoon, Saskatchewan
  • All depths and intervals are meters downhole, true thicknesses are yet to be determined

 

Split core samples were taken systematically, and intervals were submitted to SRC Geoanalytical Laboratories (an SCC ISO/IEC 17025: 2005 Accredited Facility) of Saskatoon for analysis. All samples were analyzed using ICP-MS for trace elements on partial and total digestions, ICP-OES for major and minor elements on a total digestion, and fusion solution of boron by ICP-OES. Mineralized samples were analyzed for U3O8 by ICP-OES and selected samples for gold by fire assay.

All assay batches reported herein are subjected to and have passed rigorous internal QA/QC protocols that include, but are not limited to, the blind  insertion of standard reference materials, blank materials and field duplicates into the sample stream at both random and systematic intervals.

About NexGen

NexGen is a British Columbia corporation with a focus on the acquisition, exploration and development of Canadian uranium projects. NexGen has an experienced team of uranium industry professionals with a successful track record in the discovery of uranium deposits and in developing projects through discovery to production.

NexGen owns a portfolio of prospective uranium exploration assets in the Athabasca Basin, Saskatchewan, Canada, including a 100% interest in Rook I, location of the Arrow discovery in February 2014 and the Bow discovery, 3.7 km along trend and northeast of Arrow, in March 2015 The Arrow Deposit's maiden Inferred mineral resource estimate is 201.9 M lbs U3O8 contained in 3.48 M tonnes grading 2.63% U3O8

Technical Information

All scientific and technical information in this news release has been prepared by or reviewed and approved by Mr. Garrett Ainsworth, P.Geo., Vice President – Exploration & Development for NexGen. Mr. Ainsworth is a qualified person for the purposes of National Instrument 43-101 Standards of Disclosure for Mineral Projects ("NI 43-101"), and has verified the sampling, analytical, and test data underlying the information or opinions contained herein by reviewing original data certificates and monitoring all of the data collection protocols.

For details of the Rook I Project including the quality assurance program and quality control measures applied and key assumptions, parameters and methods used to estimate the mineral resource set forth above please refer to the technical report entitled "Technical Report on the Rook 1 Property, Saskatchewan, Canada" dated effective April 13, 2016 (the "Rook 1 Technical Report") prepared by Mark B. Mathisen and David Ross, each of whom is a "qualified person" under NI 43-101. The Rook I Technical Report is available for review under the Company's profile on SEDAR at www.sedar.com.

Forward-Looking Information

This news release contains "forward-looking information" within the meaning of applicable Canadian securities legislation.  "Forward-looking information" includes, but is not limited to, statements with respect to the activities, events or developments that the Company expects or anticipates will or may occur in the future, including, without limitation, planned exploration activities and preparation and release of an updated mineral resource estimate. Generally, but not always, forward-looking information and statements can be identified by the use of words such as "plans", "expects", "is expected", "budget", "scheduled", "estimates", "forecasts", "intends", "anticipates", or "believes" or the negative connotation thereof or variations of such words and phrases or state that certain actions, events or results "may", "could", "would", "might" or "will be taken", "occur" or "be achieved" or the negative connation thereof.

Such forward-looking information and statements are based on numerous assumptions, including among others, that the results of planned exploration activities are as anticipated, the price of uranium, the anticipated cost of planned exploration activities, that general business and economic conditions will not change in a material adverse manner, that financing will be available if and when needed and on reasonable terms, and that third party contractors, equipment and supplies and governmental and other approvals required to conduct the Company's planned exploration activities will be available on reasonable terms and in a timely manner. Although the assumptions made by the Company in providing forward-looking information or making forward-looking statements are considered reasonable by management at the time, there can be no assurance that such assumptions will prove to be accurate.

Forward-looking information and statements also involve known and unknown risks and uncertainties and other factors, which may cause actual events or results in future periods to differ materially from any projections of future events or results expressed or implied by such forward-looking information or statements, including, among others: negative operating cash flow and dependence on third party financing, uncertainty of additional financing, no known mineral reserves or resources, pending assay results may not be consistent with preliminary results, alternative sources of energy, aboriginal title and consultation issues, reliance on key management and other personnel, potential downturns in economic conditions, actual results of exploration activities being different than anticipated, changes in exploration programs based upon results, availability of third party contractors, availability of equipment and supplies, failure of equipment to operate as anticipated; accidents, effects of weather and other natural phenomena and other risks associated with the mineral exploration industry, environmental risks, changes in laws and regulations, community relations and delays in obtaining governmental or other approvals.

Although the Company has attempted to identify important factors that could cause actual results to differ materially from those contained in the forward-looking information or implied by forward-looking information, there may be other factors that cause results not to be as anticipated, estimated or intended. There can be no assurance that forward-looking information and statements will prove to be accurate, as actual results and future events could differ materially from those anticipated, estimated or intended. Accordingly, readers should not place undue reliance on forward-looking statements or information.  The Company undertakes no obligation to update or reissue forward-looking information as a result of new information or events except as required by applicable securities laws.

SOURCE NexGen Energy Ltd.

Photo_Asset_2

Photo_Asset_3

Image with caption: "Figure 1: Three-Dimensional View of the A2 High Grade Domain (CNW Group/NexGen Energy Ltd.)". Image available at: http://photos.newswire.ca/images/download/20160719_C5083_PHOTO_EN_737152.jpg

Image with caption: "Figure 2: Arrow Deposit Drill Hole Locations (CNW Group/NexGen Energy Ltd.)". Image available at: http://photos.newswire.ca/images/download/20160719_C5083_PHOTO_EN_737154.jpg

Image with caption: "Figure 3: A2 Mineralized Shear Long Section (Close Up of Sub-Zone) (CNW Group/NexGen Energy Ltd.)". Image available at: http://photos.newswire.ca/images/download/20160719_C5083_PHOTO_EN_737156.jpg

Copyright CNW Group 2016

Comment On!

140
Upload limit is up to 1mb only
To post messages to your Socail Media account, you must first give authorization from the websites. Select the platform you wish to connect your account to CanadianInsider.com (via Easy Blurb).