NexGen Announces Initiation of Maiden Preliminary Economic Assessment and Off-Scale Mineralization in the 180m Southwest Gap

Ad blocking detected

Thank you for visiting CanadianInsider.com. We have detected you cannot see ads being served on our site due to blocking. Unfortunately, due to the high cost of data, we cannot serve the requested page without the accompanied ads.

If you have installed ad-blocking software, please disable it (sometimes a complete uninstall is necessary). Private browsing Firefox users should be able to disable tracking protection while visiting our website. Visit Mozilla support for more information. If you do not believe you have any ad-blocking software on your browser, you may want to try another browser, computer or internet service provider. Alternatively, you may consider the following if you want an ad-free experience.

Canadian Insider Ultra Club
$500/ year*
Daily Morning INK newsletter
+3 months archive
Canadian Market INK weekly newsletter
+3 months archive
30 publication downloads per month from the PDF store
Top 20 Gold, Top 30 Energy, Top 40 Stock downloads from the PDF store
All benefits of basic registration
No 3rd party display ads
JOIN THE CLUB

* Price is subject to applicable taxes.

Paid subscriptions and memberships are auto-renewing unless cancelled (easily done via the Account Settings Membership Status page after logging in). Once cancelled, a subscription or membership will terminate at the end of the current term.

NexGen Announces Initiation of Maiden Preliminary Economic Assessment and Off-Scale Mineralization in the 180m Southwest Gap

Canada NewsWire

VANCOUVER, April 27, 2017 /CNW/ - NexGen Energy Ltd. ("NexGen" or the "Company") (TSX:NXE, OTCQX:NXGEF) is pleased to report commencement of an independent maiden Preliminary Economic Assessment ("PEA") on the Arrow Deposit, and results from the on-going winter 2017 drilling program at our 100% owned, Rook I property, Athabasca Basin, Saskatchewan.

Initiation of Maiden PEA:

Advanced work has commenced on an independent maiden PEA which will incorporate the updated mineral resource estimate released on March 6, 2017 (see News Release dated March 6, 2017). The PEA is scheduled to be completed late Q2/early Q3 2017 and will outline the following key aspects of Arrow:

  • Annual production rate,
  • Operating life,
  • Mining method,
  • Capital expenditures,
  • Operating costs,
  • Economic returns including: internal rate of return, net present value, payback period and sensitivity analysis.

Roscoe Postle Associates Inc., a leading independent consulting company with substantial experience in the Athabasca Basin, and around the globe will be preparing the PEA.

Drilling Highlights:

Southwest Shallow Dravite A2

Drilling in a previously identified area of strong hydrothermal alteration within the A2 shear located southwest of Arrow, has intersected mineralization including off-scale radioactivity for the first time. This new area of mineralization begins 170 m below surface and is located 275 m up-dip and southwest of the A2 Mineral Resource domains. Highlighted holes include:

  • Scissor hole AR-17-128 intersected 6.0 m of total composite mineralization including 1.1 m of total composite off-scale radioactivity (>10,000 to 32,000 cps) within a 23.0 m section (195.0 to 218.0 m).

  • Scissor hole AR-17-125 (50 m down-dip from AR-17-128) intersected 10.5 m of total composite mineralization including 0.15 m of total composite off-scale radioactivity (>10,000 to 12,500 cps) within a 13.0 m section (236.0 to 249.0 m).

Southwest A3 & A4 Gap Drilling

Strong off-scale radioactivity has been intersected in the 'gap' area located southwest of the Arrow resource domains, and northeast of the 180 m Southwest Area Mineral Resource domains. The Southwest Gap Area was not incorporated into the updated mineral resource estimate and represents a key resource expansion opportunity, which has just begun to be targeted. Highlighted holes include:

  • Hole AR-17-131c3 (85 m northeast and down-dip from AR-16-97) intersected 64.5 m of total composite mineralization including 6.6 m of total composite off-scale radioactivity (>10,000 to >61,000 cps) within 337.0 m section (646.0 to 983.0 m) in the A3 through A5 shears, and all of the off-scale in this hole was encountered in the A3 shear.

  • Hole AR-17-123c4 (30 m southwest from AR-16-97) intersected 75.5m of total composite mineralization including 2.8 m of total composite off-scale radioactivity (>10,000 to >61,000 cps) within 183.0 m section (660.0 to 843.0 m) in the A4 and A5 shears.

  • Hole AR-17-123c3 (55 m southwest and down-dip from AR-16-97) intersected 83.0m of total composite mineralization including 1.3 m of total composite off-scale radioactivity (>10,000 to 14,000 cps) within 503.5 m section (442.0 to 945.5 m) in the A2 through A5 shears.

Arrow, Activities & Financial:

  • The 2017 winter program comprising a minimum of 35,000 m of drilling with seven drill rigs, will continue into early May 2017.

  • A maiden Preliminary Economic Assessment is scheduled to be completed in late Q2 / early Q3 2017.

  • The Company has cash on hand of approximately $58 million.

A longitudinal section and a map showing drill hole locations are shown in Figures 1 and 2.  Table 1 is a summary of the mineralized intervals.

Garrett Ainsworth, Vice-President, Exploration and Development, commented: "The Southwest Gap area is showing extensive resource growth potential within the A3 and A4 shears.  This area remains largely untested at depth, which is encouraging given the overall southwest plunge of the Arrow mineralization.  Targeted drill testing has paid off with the discovery of off-scale radioactivity in a new area of the A2 shear located 170 m below the surface.  The strength and core lengths of alteration and radioactivity in this new area reminds us of how large the overall Arrow mineralized system is, and how little it has been explored."    

Leigh Curyer, Chief Executive Officer, commented:  "The drill results today paired with those previously released from our ongoing winter 2017 program demonstrate how much material room there is for Arrow to expand and optimize in terms of grade and tonnage. Commencement of an initial PEA is an important step in providing guidance as to the economic power of Arrow relative to other sources of current and future mined uranium worldwide. Noting, this initial PEA will be subsequently updated as the Arrow resource is further defined."

                                                    

Table 1: Arrow Deposit Drill Hole Data







Drill Hole

Athabasca
Group -
Basement
Unconformity
Depth (m)

Handheld Scintillometer Results (RS-120)

Hole ID

Azimuth

Dip

Total
Depth
(m)

From (m)

To (m)

Width (m)

CPS Range


AR-17-122

147

-70

381.50

96.10

240.50

253.00

12.50

<500 -  8500

AR-17-123c1

147

-70

906.50

101.50

672.50

675.50

3.00

<500 -  1000






688.00

688.50

0.50

<500 -  560






708.00

708.50

0.50

<500 -  1050






725.00

727.00

2.00

<500 -  2340






730.50

733.50

3.00

<500 -  2100






830.00

831.00

1.00

<500 -  6400

AR-17-123c2

147

-70

864.50

101.50

651.00

655.00

4.00

<500 -  4600






657.50

658.00

0.50

<500 -  1140






668.50

670.00

1.50

<500 -  60000






675.00

676.00

1.00

<500 -  4100






680.50

684.00

3.50

<500 -  6600






687.00

688.00

1.00

<500 -  9800






707.00

720.50

13.50

<500 -  15000






725.50

742.00

16.50

<500 -  9700






753.50

754.00

0.50

<500 -  1710






761.00

761.50

0.50

<500 -  740






778.50

779.50

1.00

<500 -  530






784.50

791.00

6.50

<500 -  3900






825.00

825.50

0.50

<500 -  630






833.50

835.00

1.50

<500 -  1360






843.50

844.50

1.00

<500 -  560






847.50

850.00

2.50

<500 -  1350

AR-17-123c3

147

-70

984.50

101.50

442.00

443.00

1.00

<500 -  720






653.50

654.50

1.00

<500 -  13000






658.50

661.50

3.00

<500 -  8600






665.00

670.00

5.00

<500 -  11000






682.00

683.00

1.00

<500 -  1800






688.00

688.50

0.50

<500 -  630






697.50

736.50

39.00

<500 -  13000






739.00

761.00

22.00

<500 -  14000






783.00

784.00

1.00

<500 -  2300






794.00

797.00

3.00

<500 -  1150






800.00

800.50

0.50

<500 -  670






803.50

804.00

0.50

<500 -  620






817.00

818.00

1.00

<500 -  720






836.00

836.50

0.50

<500 -  885






848.00

848.50

0.50

<500 -  570






881.50

884.50

3.00

<500 -  1100






945.00

945.50

0.50

<500 -  550

AR-17-123c4

147

-70

864.50

101.50

660.00

667.50

7.50

<500 -  3900






672.50

673.50

1.00

700 -  >61000






676.00

679.50

3.50

<500 -  13000






686.00

692.50

6.50

<500 -  7500






695.50

707.50

12.00

<500 -  29000






710.50

738.00

27.50

<500 -  30000






740.50

754.00

13.50

<500 -  54000






757.50

760.00

2.50

<500 -  5000






790.00

790.50

0.50

<500 -  760






829.00

829.50

0.50

<500 -  5000






842.50

843.00

0.50

<500 -  550

AR-17-124

147

-70

411.00

93.40

No Anomalous Radioactivity

AR-17-125

327

-70

417.00

N/A

236.00

241.50

5.50

<500 -  3450






244.00

249.00

5.00

<500 -  12500

AR-17-128

327

-70

357.00

N/A

195.00

198.00

3.00

<500 -  18000






215.00

218.00

3.00

<500 -  32000

AR-17-130

327

-70

321.00

N/A

181.50

183.00

1.50

<500 -  19000

AR-17-131c1

147

-70

857.50

100.50

659.50

660.00

0.50

1600 -  >61000






785.00

785.50

0.50

<500 -  3200

AR-17-131c2

147

-70

963.50

100.50

671.00

671.50

0.50

<500 -  1150






674.00

674.50

0.50

<500 -  1400






718.00

718.50

0.50

<500 -  520






749.00

749.50

0.50

<500 -  2000






752.50

753.50

1.00

520 -  8500






759.50

760.50

1.00

<500 -  2000






765.50

769.00

3.50

<500 -  14000






771.50

776.00

4.50

<500 -  4400






788.50

793.50

5.00

<500 -  55000






821.50

822.00

0.50

<500 -  1010






828.50

829.00

0.50

<500 -  14200






857.00

858.00

1.00

<500 -  3080






869.50

870.50

1.00

<500 -  8800

AR-17-131c3

147

-70

1029.50

100.50

646.00

667.50

21.50

<500 -  >61000






671.00

678.50

7.50

<500 -  11000






724.50

725.00

0.50

<500 -  1100






756.00

757.50

1.50

<500 -  570






761.50

768.50

7.00

<500 -  2000






772.50

773.00

0.50

<500 -  1100






777.50

785.50

8.00

<500 -  1650






804.00

806.50

2.50

<500 -  4250






809.00

809.50

0.50

<500 -  530






816.50

819.00

2.50

<500 -  3000






881.00

881.50

0.50

<500 -  940






908.00

908.50

0.50

<500 -  770






913.50

914.50

1.00

<500 -  510






919.00

923.50

4.50

<500 -  2210






933.50

937.00

3.50

<500 -  1550






940.50

942.00

1.50

<500 -  680






952.00

952.50

0.50

<500 -  700






982.50

983.00

0.50

<500 -  525

AR-17-132

327

-70

232.00

N/A

No Anomalous Radioactivity

AR-17-134

327

-70

401.00

102.50

234.00

239.00

5.00

<500 -  5400

AR-17-135

327

-70

285.00

102.40

No Anomalous Radioactivity

AR-17-137

327

-70

366.00

N/A

No Anomalous Radioactivity

AR-17-139

327

-70

321.00

N/A

No Anomalous Radioactivity

AR-17-140

327

-70

477.00

108.60

262.00

263.50

1.50

<500 -  1240

AR-17-141

327

-70

330.00

N/A

No Anomalous Radioactivity

AR-17-142

327

-70

348.00

N/A

No Anomalous Radioactivity

AR-17-145

327

-70

315.00

N/A

No Anomalous Radioactivity

 

Parameters:

  • Maximum internal dilution 2.00 m downhole
  • All depths and intervals are meters downhole, true thicknesses are yet to be determined. Resource modelling in conjunction with an updated mineral resource estimate is required before true thicknesses can be estimated.
  • "Anomalous" means >500 cps (counts per second) total count gamma readings by gamma scintillometer type RS-120
  • "Off-scale" means >10,000 cps (counts per second) total count gamma readings by gamma scintillometer type RS-120
  • Where "Min cps" is <500 cps, this refers to local low radiometric zones within the overall radioactive interval

Arrow Deposit Drilling

AR-17-122

Hole AR-17-122 was collared from surface at an angled orientation (-70°) to the southeast (147° Azimuth). It was designed to test strong, shallow clay-breccia style dravite alteration in the 180 m southwest area in the A2 shear. The A2 shear was interested at an inclination of -71°.

The hole intersected silicified and hematized Athabasca Group sandstones between 95.9 m and the unconformity at 96.1 m. Basement lithologies largely consisted of semi-pelitic gneiss and narrow intervals of pelitic gneiss and mylonite. The hole successfully intersected anomalous radioactivity associated with disseminated and fracture-hosted pitchblende mineralization. Continuous composite mineralization of 12.5 m was intersected from 240.5 to 253.0 m in the A2 shear. The hole was terminated at 381.5 m and represents the first identification of significant mineralization in this new shallow area, approximately 235 m below surface.

AR-17-123c1

Hole AR-17-123c1 was collared from surface at an angled orientation (-70°) to the southeast (147° Azimuth). It was designed to test the A4 shear 30 m up-dip of AR-16-97 (2.64% U3O8 over 18.0 m in the A4 shear). Directional drilling was initiated at 201 m and the A4 shear was intersected at an inclination of -63°.

The hole intersected hematized Athabasca Group sandstones between 93.0 m and the unconformity at 101.5 m. Basement lithologies largely consisted of semi-pelitic gneiss and relatively narrow intervals of pelitic gneiss and mylonite. The hole successfully intersected anomalous radioactivity associated with disseminated and fracture-hosted pitchblende mineralization. A total composite mineralization of 10.0 m was intersected within a 158.5 m section (672.5 to 831.0 m). In the A4 shear, 9.0 m of composite mineralization was intersected. In the A5 shear, 1.0 m of composite mineralization was intersected. The hole was terminated at 906.5 m.

AR-17-123c2

Hole AR-17-123c2 was a directional hole that departed pilot hole AR-17-123c1 at a depth of 210 m. It was designed to test the southwest gap target area 60 m down-dip of AR-16-97 (2.64% U3O8 over 18.0 m in the A4 shear). Directional drilling was initiated at 222 m. The A4 shear was intersected at an inclination of -65°.

Basement lithologies were intersected from the top of the hole and dominantly consisted of semi-pelitic gneiss with relatively narrow intervals of graphitic pelitic gneiss and mylonite (the A3 and A4 shears). The hole successfully intersected anomalous to strongly anomalous radioactivity in the A3 and A4 shears in association with disseminated, fracture-controlled, and foliation-controlled pitchblende mineralization. A total composite mineralization of 55.5 m including 0.55 m of off-scale radioactivity (>10,000 to 60,000 cps) was intersected within a 199.0 m section (651.0 to 850.0 m). In the A3 shear, 11.5 m of composite mineralization was intersected including 0.3 m of off-scale radioactivity. In the A4 shear, 39.0 m of composite mineralization including 0.25 m of off-scale radioactivity was intersected. An additional 5.0 m of composite mineralization was intersected in the A5 shear. The hole was terminated at a depth of 864.5 m.

AR-17-123c3

Hole AR-17-123c3 was a directional hole that departed AR-17-123c2 at a depth of 231 m. It was designed to test the southwest gap target area 55 m down-plunge to the southwest of AR-16-97 (2.64% U3O8 over 18.0 m in the A4 shear). Directional drilling was initiated at 231 m. The A4 shear was intersected at an inclination of -66°.

Basement lithologies were intersected from the top of the hole and dominantly consisted of semi-pelitic gneiss with relatively narrow intervals of graphitic pelitic gneiss and mylonite (the A2 through A4 shears). The hole successfully intersected anomalous to strongly anomalous radioactivity in the A2 through A4 shears in association with disseminated, fracture-controlled, and foliation-controlled pitchblende mineralization. A total composite mineralization of 83.0 m including 1.3 m of off-scale radioactivity (>10,000 to 14,000 cps) was intersected within a 503.5 m section (442.0 to 945.5 m). In the A2 shear, 1.0 m of composite mineralization was intersected. In the A3 shear, 10.5 m of composite mineralization was intersected including 0.5 m of off-scale radioactivity. In the A4 shear, 67.0 m of composite mineralization including 0.8 m of off-scale radioactivity was intersected. The hole was terminated at a depth of 984.5 m.

AR-17-123c4

Hole AR-17-123c4 was a directional hole that departed AR-17-123c3 at a depth of 369 m. It was designed to test the southwest gap target area 30 m along strike to the southwest of AR-16-97 (2.64% U3O8 over 18.0 m in the A4 shear). Directional drilling was initiated at 384 m. The A4 shear was intersected at an inclination of -63°.

Basement lithologies were intersected from the top of the hole and dominantly consisted of semi-pelitic gneiss with relatively narrow intervals of graphitic pelitic gneiss and mylonite (the A4 and A5 shears). The hole successfully intersected anomalous to strongly anomalous radioactivity in the A4 and A5 shears in association with disseminated, fracture-controlled, foliation-controlled, and semi-massive to massive pitchblende mineralization. A total composite mineralization of 75.5 m including 2.8 m of off-scale radioactivity (>10,000 to >61,000 cps) was intersected within a 183.0 m section (660.0 to 843.0 m). In the A4 shear, 74.0 m of composite mineralization including 2.8 m of off-scale radioactivity was intersected. An additional 1.5 m of composite mineralization was intersected in the A5 shear. The hole was terminated at a depth of 864.5 m.

AR-17-124

Hole AR-17-124 was collared from surface at an angled orientation (-70°) to the southeast (147° Azimuth). It was designed to test strong, shallow clay-breccia style dravite alteration in the 180 m southwest area in the A2 shear 30 m down-dip of AR-17-122, but it deviated severely in the overburden. The A2 shear was intersected at an inclination of -73°.

The hole intersected hematized Athabasca Group sandstones from 92.2 m and the unconformity at 95.4 m. Basement lithologies largely consisted of semi-pelitic gneiss and narrow intervals of pelitic gneiss and mylonite. No anomalous radioactivity was intersected. The hole was terminated at 411 m.

AR-17-125

Hole AR-17-125 was scissor hole collared from surface at an angled orientation (-70°) to the northwest (327° Azimuth). It was designed to test the A2 shear 50 m northeast of AR-17-122 (12.5 m of total composite mineralization; assays pending). Directional drilling was initiated at 111 m and the A2 shear was intersected at an inclination of -68°.

Basement lithologies were intersected beginning at 100.5 m which consisted largely of semi-pelitic gneiss and relatively narrow intervals of pelitic gneiss and mylonite. Athabasca Group sandstones were not intersected. The hole successfully intersected anomalous to strongly anomalous radioactivity associated with disseminated, fracture-controlled, and foliation-controlled pitchblende mineralization. A total composite mineralization of 10.5 m including 0.15 m of off-scale radioactivity (>10,000 to 12,500 cps) was intersected within a 13.0 m section (236.0 to 249.0 m), all in the A2 shear. The hole was terminated at 417 m and was the first to intersect off-scale radioactivity in this new area.

AR-17-128

Hole AR-17-128 was collared from surface at an angled scissor orientation (-70°) to the northwest (327° Azimuth). It was designed to test the A2 shear 50 m up-dip of mineralization encountered hole AR-17-125 (0.15 m of off-scale radioactivity; assays pending). The A2 shear was intersected at an inclination of -68°.

Basement lithologies were intersected beginning at 102.0 m which consisted largely of semi-pelitic gneiss and relatively narrow intervals of pelitic gneiss and mylonite. Athabasca Group sandstones were not intersected. The hole successfully intersected anomalous to strongly anomalous radioactivity associated with disseminated and fracture-controlled pitchblende mineralization. A total composite mineralization of 6.0 m including 1.1 m of off-scale radioactivity (>10,000 to 21,000 cps) was intersected within a 23.0 m section (195.0 to 218.0 m), all in the A2 shear. The hole was terminated at 357 m.

AR-17-130

Hole AR-17-130 was collared from surface at an angled scissor orientation (-70°) to the northwest (327° Azimuth).  It was designed to test the A2 shear 50 m up-dip of mineralization encountered hole AR-17-128 (1.1 m of off-scale radioactivity; assays pending). The A2 shear was intersected at an inclination of -71°.

Basement lithologies were intersected beginning at 99.2 m which consisted largely of semi-pelitic gneiss and relatively narrow intervals of pelitic gneiss. Athabasca Group sandstones were not intersected. The hole successfully intersected anomalous to strongly anomalous radioactivity associated with disseminated and fracture-controlled pitchblende mineralization. Continuous composite mineralization of 1.5 m including 0.2 m of off-scale radioactivity (>10,000 to 19,000 cps) was intersected in the A2 shear from 181.5 to 183.0 m. The hole was terminated at 321 m.

AR-17-131c1

Hole AR-17-131c1 was collared from surface at an angled orientation (-70°) to the southeast (147° Azimuth). It was designed to test the Arrow Deposit in the southwest gap target area, 60 m up-plunge to the northeast of AR-16-97 (2.64% U3O8 over 18.0 m in the A4 shear). Directional drilling was initiated at 252 m. The A4 shear was intersected at an inclination of -65°.

The hole intersected hematized Athabasca Group sandstones between 98.1 m and the unconformity at 100.5 m. Basement lithologies largely consist of semi-pelitic gneiss and relatively narrow intervals of pelitic gneiss and mylonite. The hole successfully intersected anomalous radioactivity associated with vein and fracture-hosted pitchblende mineralization. A total composite mineralization of 1.0 m including 0.25 m of off-scale radioactivity (>10,000 to >61,000 cps) was intersected within a 126.0 m section (659.5 to 785.5 m). In the A4 shear, 0.5 m of composite mineralization was intersected including 0.25 m of off-scale radioactivity. Additionally, in the A5 shear 0.5 m of composite mineralization was intersected. The hole was terminated at a depth of 857.5 m.

AR-17-131c2

Hole AR-17-131c2 was a directional hole that departed pilot hole AR-17-131c1 at a depth of 262 m. It was designed to test the Arrow Deposit in the southwest gap target area, 55 m down-plunge to the northeast of AR-16-97 (2.64% U3O8 over 18.0 m in the A4 shear). Directional drilling was initiated at 279 m. The A4 shear was intersected at an inclination of -67°.

Basement lithologies were intersected from the top of the hole and dominantly consisted of semi-pelitic gneiss with relatively narrow intervals of graphitic pelitic gneiss and mylonite (the A2 through A5 shears). The hole successfully intersected anomalous to strongly anomalous radioactivity in the A4 and A5 shears in association with disseminated, fracture-controlled, and foliation-controlled pitchblende mineralization. A total composite mineralization of 20.0 m including 0.55 m of off-scale radioactivity (>10,000 to 55,000 cps) was intersected within a 199.5 m section (671.0 to 870.5 m). In the A4 shear 12.0 m of composite mineralization was intersected including 0.2 m of of-scale radioactivity. In the A5 shear, 8.5 m of composite mineralization was intersected including 0.35 m of off-scale radioactivity. The hole was terminated at a depth of 963.5 m.

AR-17-131c3

Hole AR-17-131c3 was a directional hole that departed pilot hole AR-17-131c2 at a depth of 283 m. It was designed to test the Arrow Deposit in the southwest gap target area, 80 m down-dip and northeast of AR-16-97 (2.64% U3O8 over 18.0 m in the A4 shear). Directional drilling was initiated at 298 m. The A3 and A4 shears were intersected at inclinations of -72° and -71° respectively.

Basement lithologies were intersected from the top of the hole and dominantly consisted of semi-pelitic gneiss with relatively narrow intervals of graphitic pelitic gneiss and mylonite (the A3 and A4 shears). The hole successfully intersected anomalous to strongly anomalous radioactivity in the A3 and A4 shears in association with disseminated, fracture-controlled, and foliation-controlled pitchblende mineralization. A total composite mineralization of 64.5 m including 6.6 m of off-scale radioactivity (>10,000 to >61,000 cps) was intersected within a 337.0 m section (646.0 to 983.0 m). In the A3 shear, 29.0 m of composite mineralization was intersected including 6.6 m of off-scale radioactivity. In the A4 shear, 23.0 m of composite mineralization was intersected. An additional 12.5 m of composite mineralization was intersected in the A5 shear. The hole was terminated at a depth of 1029.5 m.

AR-17-132

Hole AR-17-132 was collared from surface at an angled scissor orientation (-70°) to the northwest (327° Azimuth).  It was designed to test the A2 shear 50 m up-dip of mineralization encountered hole AR-17-130 (0.2 m of off-scale radioactivity; assays pending). The A2 shear was intersected at an inclination of -71°.

Basement lithologies were intersected beginning at 96.4 m which consisted largely of semi-pelitic gneiss and relatively narrow intervals of pelitic gneiss. Athabasca Group sandstones were not intersected. The hole was terminated at 232 m. No anomalous radioactivity was intersected.

AR-17-134

Hole AR-17-134 was collared from surface at an angled scissor orientation (-70°) to the northwest (327° Azimuth).  It was designed to test the A2 shear 50 m down-dip of mineralization encountered in hole AR-17-125 (0.15 m of off-scale radioactivity; assays pending). The A2 shear was intersected at an inclination of -70°.

The hole intersected Athabasca Group sandstones between 102.3 m and the unconformity at 102.5 m. Basement lithologies consist largely of semi-pelitic gneiss and relatively narrow intervals of pelitic gneiss. The hole successfully intersected anomalous radioactivity associated with disseminated and fracture-controlled pitchblende mineralization. Continuous composite mineralization of 5.0 m was intersected in the A2 shear from 234.0 to 239.0 m. The hole was terminated at 401 m.

AR-17-135

Hole AR-17-135 was collared from surface at an angled scissor orientation (-70°) to the northwest (327° Azimuth). It was designed to test the A2 shear 50 m northeast of mineralization encountered in hole AR-17-128 (1.1 m of off-scale radioactivity; assays pending). The A2 shear was intersected at an inclination of -69°.

The hole intersected hematized Athabasca Group sandstones between 101.4 m and the unconformity at 102.4 m. Basement lithologies largely consisted of semi-pelitic gneiss and narrow intervals of pelitic gneiss and mylonite. No anomalous radioactivity was intersected. The hole was terminated at 285 m.

AR-17-137

Hole AR-17-137 was collared from surface at an angled scissor orientation (-70°) to the northwest (327° Azimuth). It was designed to test the A2 shear 50 m to the northeast of mineralization encountered in hole AR-17-134 (5.0 m of composite mineralization; assays pending). The A2 shear was intersected at an inclination of -73°.

The hole intersected basement lithologies at 101.6 m which largely consisted of semi-pelitic gneiss and narrow intervals of pelitic gneiss and mylonite, no Athabasca sandstone was intersected.  No anomalous radioactivity was intersected. The hole was terminated at 366 m.

AR-17-139

Hole AR-17-139 was collared from surface at an angled scissor orientation (-70°) to the northwest (327° Azimuth). It was designed to test the A2 shear 50 m northeast of mineralization encountered in hole AR-17-130 (0.2 m of off-scale radioactivity; assays pending). The A2 shear was intersected at an inclination of -68°.

The hole intersected hematized Athabasca Group sandstones between 101.4 m and the unconformity at 102.4m. Basement lithologies largely consisted of semi-pelitic gneiss and narrow intervals of pelitic gneiss and mylonite. No anomalous radioactivity was intersected. The hole was terminated at 321 m.

AR-17-140

Hole AR-17-140 was collared from surface at an angled orientation (-70°) to the northwest (327° Azimuth). It was designed to test the A2 shear 50 m down dip of mineralization encountered in hole AR-17-134 (5.0 m of composite mineralization; assays pending). The A2 shear was intersected at an inclination of -72°.

The hole intersected hematized Athabasca Group sandstones between 105.3 m and the unconformity at 108.6 m. Basement lithologies largely consisted of semi-pelitic gneiss and narrow intervals of pelitic gneiss and mylonite.  The hole intersected anomalous radioactivity associated with fracture hosted pitchblende mineralization. Continuous composite mineralization of 1.5 m was intersected from 262.0 to 263.5 m. The hole was terminated at 477 m.

AR-17-141

Hole AR-17-141 was collared from surface at an angled scissor orientation (-70°) to the northwest (327° Azimuth). It was designed to test the A2 shear 40 m southwest of AR-17-128 (1.1 m of off-scale radioactivity; assays pending). The A2 shear was intersected at an inclination of -71°.

The hole intersected basement lithologies at 99.0 m which largely consisted of semi-pelitic gneiss and narrow intervals of pelitic gneiss and mylonite, no Athabasca sandstone was intersected.  No anomalous radioactivity was intersected. The hole was terminated at 330 m.

AR-17-142

Hole AR-17-142 was collared from surface at an angled scissor orientation (-70°) to the northwest (327° Azimuth).  It was designed to test the A2 shear 175 m southwest of mineralization intersected in hole AR-17-128 (1.1 m of off-scale radioactivity; assays pending). The area of the A2 shear was intersected at an inclination of -69°.

Basement lithologies were intersected beginning at 97.2 m which consisted largely of semi-pelitic gneiss. Athabasca Group sandstones were not intersected. No anomalous radioactivity was intersected. The hole was terminated at 348 m.

AR-17-145

Hole AR-17-145 was collared from surface at an angled scissor orientation (-70°) to the northwest (327° Azimuth).  It was designed to test the A2 shear 50 m below AR-17-142. The area of the A2 shear was intersected at an inclination of -69°.

Basement lithologies were intersected beginning at 99.0 m which consisted largely of semi-pelitic gneiss. Athabasca Group sandstones were not intersected. No anomalous radioactivity was intersected. The hole was terminated at 360 m.

Technical Information

Natural gamma radiation in drill core reported in this news release was measured in counts per second (cps) using a Radiation Solutions Inc. RS-120 gamma-ray scintillometer. The reader is cautioned that total count gamma readings may not be directly or uniformly related to uranium grades of the rock sample measured; they should be used only as a preliminary indication of the presence of radioactive minerals. All intersections are downhole.

Split core samples will be taken systematically, and intervals will be submitted to SRC Geoanalytical Laboratories (an SCC ISO/IEC 17025: 2005 Accredited Facility) of Saskatoon for analysis. All samples sent to SRC will be analyzed using ICP-MS for trace elements on partial and total digestions, ICP-OES for major and minor elements on a total digestion, and fusion solution of boron by ICP-OES. Mineralized samples are analyzed for U3O8 by ICP-OES and select samples for gold by fire assay. Assay results will be released when received and after stringent internal QA/QC protocols are passed.

All scientific and technical information in this news release has been prepared by or reviewed and approved by Mr. Garrett Ainsworth, P.Geo., Vice President – Exploration & Development for NexGen. Mr. Ainsworth is a qualified person for the purposes of National Instrument 43-101 Standards of Disclosure for Mineral Projects ("NI 43-101"), and has verified the sampling, analytical, and test data underlying the information or opinions contained herein by reviewing original data certificates and monitoring all of the data collection protocols.

For details of the Rook I Project including the quality assurance program and quality control measures applied and key assumptions, parameters and methods used to estimate the mineral resource set forth above please refer to the technical report entitled "Technical Report on the Rook 1 Property, Saskatchewan, Canada" dated effective March 31, 2017 (the "Rook 1 Technical Report") prepared by Mark B. Mathisen and David Ross, each of whom is a "qualified person" under NI 43-101. The Rook I Technical Report is available for review under the Company's profile on SEDAR at www.sedar.com.

About NexGen

NexGen is a British Columbia corporation with a focus on the acquisition, exploration and development of Canadian uranium projects. NexGen has a highly experienced team of uranium industry professionals with a successful track record in the discovery of uranium deposits and in developing projects through discovery to production.

NexGen owns a portfolio of highly prospective uranium exploration assets in the Athabasca Basin, Saskatchewan, Canada, including a 100% interest in Rook I, location of the Arrow Discovery in February 2014 and Bow Discovery in March 2015 and the Harpoon discovery in August 2016. The Arrow Deposit's second resource estimate, released only three years after the first discovery of mineralization, is 179.5 M lbs U3O8 contained in 1.18 M tonnes grading 6.88% U3O8 in the indicated category and an additional 122.1 M lbs U3O8 contained in 4.25 M tonnes grading 1.30% U3O8 in the inferred category.

This news release contains "forward-looking information" within the meaning of applicable Canadian securities legislation.  "Forward-looking information" includes, but is not limited to, statements with respect to the activities, events or developments that the Company expects or anticipates will or may occur in the future, including, without limitation, completion of the PEA, and planned exploration activities and results of exploration and development activities. Generally, but not always, forward-looking information and statements can be identified by the use of words such as "plans", "expects", "is expected", "budget", "scheduled", "estimates", "forecasts", "intends", "anticipates", or "believes" or the negative connotation thereof or variations of such words and phrases or state that certain actions, events or results "may", "could", "would", "might" or "will be taken", "occur" or "be achieved" or the negative connation thereof.

Such forward-looking information and statements are based on numerous assumptions, including among others, that the results of planned exploration activities are as anticipated, the price of uranium, the anticipated cost of planned exploration activities, that general business and economic conditions will not change in a material adverse manner, that financing will be available if and when needed and on reasonable terms, and that third party contractors, equipment and supplies and governmental and other approvals required to conduct the Company's planned exploration activities will be available on reasonable terms and in a timely manner. Although the assumptions made by the Company in providing forward-looking information or making forward-looking statements are considered reasonable by management at the time, there can be no assurance that such assumptions will prove to be accurate.

Forward-looking information and statements also involve known and unknown risks and uncertainties and other factors, which may cause actual events or results in future periods to differ materially from any projections of future events or results expressed or implied by such forward-looking information or statements, including, among others: negative operating cash flow and dependence on third party financing, uncertainty of additional financing, no known mineral reserves, assay results may not be consistent with preliminary results, alternative sources of energy, aboriginal title and consultation issues, reliance on key management and other personnel, potential downturns in economic conditions, actual results of exploration activities being different than anticipated, changes in exploration programs based upon results, availability of third party contractors, availability of equipment and supplies, failure of equipment to operate as anticipated; accidents, effects of weather and other natural phenomena and other risks associated with the mineral exploration industry, environmental risks, changes in laws and regulations, community relations and delays in obtaining governmental or other approvals.

Although the Company has attempted to identify important factors that could cause actual results to differ materially from those contained in the forward-looking information or implied by forward-looking information, there may be other factors that cause results not to be as anticipated, estimated or intended. There can be no assurance that forward-looking information and statements will prove to be accurate, as actual results and future events could differ materially from those anticipated, estimated or intended. Accordingly, readers should not place undue reliance on forward-looking statements or information.  The Company undertakes no obligation to update or reissue forward-looking information as a result of new information or events except as required by applicable securities laws.

SOURCE NexGen Energy Ltd.

View original content with multimedia: http://www.newswire.ca/en/releases/archive/April2017/27/c5503.html

Copyright CNW Group 2017

Comment On!

140
Upload limit is up to 1mb only
To post messages to your Socail Media account, you must first give authorization from the websites. Select the platform you wish to connect your account to CanadianInsider.com (via Easy Blurb).