Moneta Files NI 43-101 Technical Report on New Resource Estimate for the Golden Highway Project, Ontario

Ad blocking detected

Thank you for visiting CanadianInsider.com. We have detected you cannot see ads being served on our site due to blocking. Unfortunately, due to the high cost of data, we cannot serve the requested page without the accompanied ads.

If you have installed ad-blocking software, please disable it (sometimes a complete uninstall is necessary). Private browsing Firefox users should be able to disable tracking protection while visiting our website. Visit Mozilla support for more information. If you do not believe you have any ad-blocking software on your browser, you may want to try another browser, computer or internet service provider. Alternatively, you may consider the following if you want an ad-free experience.

Canadian Insider Ultra Club
$432/ year*
Daily Morning INK newsletter
+3 months archive
Canadian Market INK weekly newsletter
+3 months archive
30 publication downloads per month from the PDF store
Top 20 Gold, Top 30 Energy, Top 40 Stock downloads from the PDF store
All benefits of basic registration
No 3rd party display ads
JOIN THE CLUB

* Price is subject to applicable taxes.

Paid subscriptions and memberships are auto-renewing unless cancelled (easily done via the Account Settings Membership Status page after logging in). Once cancelled, a subscription or membership will terminate at the end of the current term.

Moneta Files NI 43-101 Technical Report on New Resource Estimate for the Golden Highway Project, Ontario

Canada NewsWire

Symbol: TSX: ME                                

TORONTO, March 1, 2019 /CNW/ - Moneta Porcupine Mines Inc. (TSX:ME) (OTC:MPUCF) (XETRA:MOP) ("Moneta" or the "Company") is pleased to announce the filing of a technical report covering the new mineral resource estimate for its Golden Highway Project, located 110 km east of Timmins, Ontario.

Moneta Porcupine Mines Inc. (CNW Group/Moneta Porcupine Mines Inc.)

The Technical Report dated March 01, 2019 was prepared in accordance with National Instrument 43-101 standards for Disclosure for Mineral Projects ("NI 43-101") and has been filed on both SEDAR and the Company's website (www.monetaporcupine.com) and is now available for review.

The Report was prepared by Mr. B. Terrence Hennessey, P. Geo and Mr. Richard M. Gowans, P. Eng of Micon International Ltd. of Toronto, Canada. Mr. B. Terrence Hennessey, P. Geo and Mr. Richard M. Gowans, P. Eng are both considered "Qualified Persons" under NI 43-101. The new technical report covers and supports the technical and scientific disclosure as contained in the new mineral resource estimate reported in Moneta's press release dated January 17, 2019 entitled "Moneta defines New Resource Estimate at its Golden Highway Project of 383,400 oz of Gold at 4.61g/t of indicated resource and 873,200 oz of Gold at 4.21g/t inferred resource."

The technical content of this press release has been reviewed and approved by Gary O'Connor, FAusIMM of Moneta who is deemed a "Qualified Person" as defined by NI 43-101.

About Moneta
The Company holds a 100% interest in 5 core gold projects strategically located along the Destor-Porcupine Fault Zone (DPFZ) in the Timmins Gold Camp with over 85 million ounces of past gold production. The projects consist of the key Golden Highway Project and the North Tisdale, Nighthawk Lake, Kayorum and Denton projects. The Golden Highway Project hosts the current 43-101 resource and covers 12 kilometres of prospective Banded Iron Formation in contact with Timiskaming clastic sediments located along the DPFZ.

The Company's public documents may be accessed at www.sedar.com. For further information on the Company, please visit our website at www.monetaporcupine.com or email us at [email protected].

SOURCE Moneta Porcupine Mines Inc.

View original content to download multimedia: http://www.newswire.ca/en/releases/archive/March2019/01/c8916.html

Copyright CNW Group 2019

Comment On!

140
Upload limit is up to 1mb only
To post messages to your Socail Media account, you must first give authorization from the websites. Select the platform you wish to connect your account to CanadianInsider.com (via Easy Blurb).