Melkior - Maseres IP Survey Progress

Ad blocking detected

Thank you for visiting CanadianInsider.com. We have detected you cannot see ads being served on our site due to blocking. Unfortunately, due to the high cost of data, we cannot serve the requested page without the accompanied ads.

If you have installed ad-blocking software, please disable it (sometimes a complete uninstall is necessary). Private browsing Firefox users should be able to disable tracking protection while visiting our website. Visit Mozilla support for more information. If you do not believe you have any ad-blocking software on your browser, you may want to try another browser, computer or internet service provider. Alternatively, you may consider the following if you want an ad-free experience.

Canadian Insider Ultra Club
$500/ year*
Daily Morning INK newsletter
+3 months archive
Canadian Market INK weekly newsletter
+3 months archive
30 publication downloads per month from the PDF store
Top 20 Gold, Top 30 Energy, Top 40 Stock downloads from the PDF store
All benefits of basic registration
No 3rd party display ads
JOIN THE CLUB

* Price is subject to applicable taxes.

Paid subscriptions and memberships are auto-renewing unless cancelled (easily done via the Account Settings Membership Status page after logging in). Once cancelled, a subscription or membership will terminate at the end of the current term.

(TheNewswire)



 

Timmins, Ontario / TheNewswire / November 30, 2018 - Melkior Resources Inc. (“Melkior”) is pleased to provide an update on the progress of the IP survey underway on the Maseres Project. A survey of 46 line kilometers of pole-dipole induced polarization survey is being conducted by GÉOPHYSIQUE TMC from Val-d’Or. Line cutting has now been completed. Data collection for the IP survey is expected to be completed before December 24, 2018.

 

A new section has been published on the Melkior website to present the raw incoming preliminary pseudo-sections. IP Pseudo-sections currently available: (http://www.melkior.com/ip/)

L0+00 N

L1+00N

L2+00N

L3+00N

L4+00N

L5+00N

L6+00N

 

A separate section provides the same pseudo-sections marked up with the location of VTEM EM anomalies. As the program progresses proposed drill hole locations and the traces of holes drilled will be added to these marked up pseudo-sections.

 

Additionally, some composite maps have been published to provide focused context to the area of the new grid.  These maps focus on the area of the new grid and provide the location of the individual lines, and VTEM EM anomalies overlain on a variety of base maps.

Maps published to provide context include:

 

Grid Layout on Satellite Imagery Base

Grid Layout on Sharp Solutions Interpretation Base

Grid Layout on Sharp Solutions EM Ternary Base

Grid Layout on Total Magnetic Intensity Base

Grid Layout on Topographic Base

Grid Layout on Calculated Vertical Gradient Base

Grid layout with Gold in A-Horizon

Grid layout with Silver in A-Horizon

Grid layout with Copper in A-Horizon

Grid layout with Lead in A-Horizon

  

Wade Kornik, P.Geo., has approved the information contained in this release.  Mr. Kornik is the Exploration Manager of the Company and is a Qualified Person as defined by National Instrument 43-101.

  

ON BEHALF OF THE BOARD

Keith James Deluce, CEO

 

For more information, please contact:

Melkior Resources Inc.

E-mail: [email protected]

Tel: 705-267-4000

 

The reader is invited to visit Melkior's web site www.melkior.com.

  

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the

TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

  

Copyright (c) 2018 TheNewswire - All rights reserved.