i-80 Gold Commences Underground Development Program at McCoy-Cove

Ad blocking detected

Thank you for visiting CanadianInsider.com. We have detected you cannot see ads being served on our site due to blocking. Unfortunately, due to the high cost of data, we cannot serve the requested page without the accompanied ads.

If you have installed ad-blocking software, please disable it (sometimes a complete uninstall is necessary). Private browsing Firefox users should be able to disable tracking protection while visiting our website. Visit Mozilla support for more information. If you do not believe you have any ad-blocking software on your browser, you may want to try another browser, computer or internet service provider. Alternatively, you may consider the following if you want an ad-free experience.

Canadian Insider Ultra Club
$500/ year*
Daily Morning INK newsletter
+3 months archive
Canadian Market INK weekly newsletter
+3 months archive
30 publication downloads per month from the PDF store
Top 20 Gold, Top 30 Energy, Top 40 Stock downloads from the PDF store
All benefits of basic registration
No 3rd party display ads
JOIN THE CLUB

* Price is subject to applicable taxes.

Paid subscriptions and memberships are auto-renewing unless cancelled (easily done via the Account Settings Membership Status page after logging in). Once cancelled, a subscription or membership will terminate at the end of the current term.

i-80 Gold Commences Underground Development Program at McCoy-Cove

Canada NewsWire

Jon Laird Joins i-80 as Cove Mine Project Manager

RENO, Nev., March 7, 2022 /CNW/ - i-80 GOLD CORP. (TSX: IAU) (OTCQX: IAUCF) ("i-80", or the "Company") is pleased to announce that the underground, advanced-exploration, program at the Company's 100%-owned McCoy-Cove Property ("McCoy-Cove" or "the Property") has commenced, achieving another item of its 2022 comprehensive plan (see press release dated January 12, 2022).  Additionally, Jon Laird has joined the Company as the Manager of the Cove Mine Project and will oversee the development program.

McCoy-Cove is one of four projects currently being advanced and is expected to be a key component in the Company's plans to restart the Lone Tree autoclave. Construction of the decline is now underway (see Figure 1) and the Phase 1 program will include construction of an initial level with multiple drill bays to provide access for upgrading resources. Approximately 40,000 metres of underground definition and expansion drilling is anticipated to commence in H2-2022 followed by a Feasibility Study anticipated to be completed in 2023. The Cove deposit represents one of North America's highest grade gold deposits with grades in excess of 10 grams per tonne gold (g/t Au) (see Table 1).  The deposit remains open for expansion down-dip.

Table 1 – McCoy-Cove Resource


Mineral Resources


Tonnage

Au Grade

Ag Grade

Gold

Silver


(kt)

(g/t)

(g/t)

(koz)

(koz)

Indicated

1,007

10.9

29.1

351

943

Inferred

3,867

10.9

20.6

1,353

2,565


Notes: Mineral Resources were calculated at a gold price of US$1500/oz, cut-off grade 0.141 opt Au. and is based on the Preliminary Economic Assessment issued by i-80 on April 13, 2021. Practical Mining LLC, under the supervision of Dagny Odell, P.E., Laura Symmes, SME, and Robert Raponi, P. Eng., each being Qualified Persons within the meaning National Instrument (NI) 43-101, was the lead consultant for the Project PEA.

The Company is also pleased to announce that Jon Laird has joined i-80 to become the Cove Mine Project Manager.  Mr. Laird is well known to i-80 Gold having previously been the project manager responsible for bringing the El Niño mine (Nevada Gold Mines JV) into production. Most recently, he worked at Hycroft Resources as well as Underground Mine Operations Superintendent at Barrick Gold's Hemlo Mine in Northwestern Ontario

"McCoy-Cove is one of three underground mining projects being advanced, ultimately with mineralization to be processed at the Company's recently acquired Lone Tree Complex", stated Matt Gili, President & COO of i-80.  "With interim processing arrangements with Nevada Gold Mines, in addition to our autoclave, we have secured the required processing that will allow us to build our portfolio of high-grade projects including the Cove Mine that is an important component in our growth plans."

The McCoy-Cove Property is strategically located approximately eighty-four kilometres south (by road) of the Company's Lone Tree Complex and immediately south of Nevada Gold Mines' Phoenix Mine within the Battle Mountain-Eureka Trend (see Figure 2). The Property is accessed via all-season road from Highway 55 in Nevada.

Figure 1 – Cove Mine Portal Site (CNW Group/i-80 Gold Corp)

Figure 2 – McCoy-Cove Property Location (CNW Group/i-80 Gold Corp)

Qualified Person

Tim George, PE, is the Qualified Person for the information contained in this press release and is a Qualified Person within the meaning of National Instrument 43-101.

About i-80 Gold Corp.

i-80 Gold Corp. is a well-financed, Nevada-focused, mining company with a goal of achieving mid-tier gold producer status through the development of multiple deposits within the Company's advanced-stage property portfolio anticipated to be processed at the centrally located Lone Tree processing facility and autoclave.



Certain statements in this release constitute "forward-looking statements" or "forward-looking information" within the meaning of applicable securities laws, including but not limited to, the expansion or mineral resources at McCoy-Cove and the potential of the McCoy-Cove Property, . Such statements and information involve known and unknown risks, uncertainties and other factors that may cause the actual results, performance or achievements of the company, its projects, or industry results, to be materially different from any future results, performance or achievements expressed or implied by such forward-looking statements or information. Such statements can be identified by the use of words such as "may", "would", "could", "will", "intend", "expect", "believe", "plan", "anticipate", "estimate", "scheduled", "forecast", "predict" and other similar terminology, or state that certain actions, events or results "may", "could", "would", "might" or "will" be taken, occur or be achieved. These statements reflect the Company's current expectations regarding future events, performance and results and speak only as of the date of this release.


Forward-looking statements and information involve significant risks and uncertainties, should not be read as guarantees of future performance or results and will not necessarily be accurate indicators of whether or not such results will be achieved. A number of factors could cause actual results to differ materially from the results discussed in the forward-looking statements or information, including, but not limited to: material adverse changes, unexpected changes in laws, rules or regulations, or their enforcement by applicable authorities; the failure of parties to contracts with the company to perform as agreed; social or labour unrest; changes in commodity prices; and the failure of exploration programs or studies to deliver anticipated results or results that would justify and support continued exploration, studies, development or operations.

 

i-80 Gold Corp Logo (CNW Group/i-80 Gold Corp)

Cision View original content to download multimedia:https://www.prnewswire.com/news-releases/i-80-gold-commences-underground-development-program-at-mccoy-cove-301496439.html

SOURCE i-80 Gold Corp

Cision View original content to download multimedia: http://www.newswire.ca/en/releases/archive/March2022/07/c5523.html

Copyright CNW Group 2022

Comment On!

140
Upload limit is up to 1mb only
To post messages to your Socail Media account, you must first give authorization from the websites. Select the platform you wish to connect your account to CanadianInsider.com (via Easy Blurb).