GoGold Drills 32.0m averaging 3.18 g/t Gold Equivalent at Los Ricos

Ad blocking detected

Thank you for visiting CanadianInsider.com. We have detected you cannot see ads being served on our site due to blocking. Unfortunately, due to the high cost of data, we cannot serve the requested page without the accompanied ads.

If you have installed ad-blocking software, please disable it (sometimes a complete uninstall is necessary). Private browsing Firefox users should be able to disable tracking protection while visiting our website. Visit Mozilla support for more information. If you do not believe you have any ad-blocking software on your browser, you may want to try another browser, computer or internet service provider. Alternatively, you may consider the following if you want an ad-free experience.

Canadian Insider Ultra Club
$500/ year*
Daily Morning INK newsletter
+3 months archive
Canadian Market INK weekly newsletter
+3 months archive
30 publication downloads per month from the PDF store
Top 20 Gold, Top 30 Energy, Top 40 Stock downloads from the PDF store
All benefits of basic registration
No 3rd party display ads
JOIN THE CLUB

* Price is subject to applicable taxes.

Paid subscriptions and memberships are auto-renewing unless cancelled (easily done via the Account Settings Membership Status page after logging in). Once cancelled, a subscription or membership will terminate at the end of the current term.

GoGold Drills 32.0m averaging 3.18 g/t Gold Equivalent at Los Ricos

Canada NewsWire

Trading Symbol: TSX: GGD
Shares Outstanding: 171,901,481

HALIFAX, June 26, 2019 /CNW/ - GoGold Resources Inc. (TSX: GGD) ("GoGold", "the Company") continues to deliver strong assay results from two new diamond drill holes at the recently acquired 29 concession Los Ricos project located about 100 km northwest of the city of Guadalajara, Mexico.

Diamond drill hole LRGG-19-017 intersected 32.0m averaging 0.80 g/t gold, 178.8 g/t silver and 3.18 g/t gold equivalent, including 11.3m averaging 1.46 g/t gold, 347.8 g/t silver and 6.1 g/t gold equivalent. Diamond drill hole LRGG-19-016 intersected the Los Ricos vein from 80.8m to 106.5m and encountered an open stope from 85.8 to 88.3m. The hanging wall portion of the vein above the stope averaged 0.52 g/t gold, 160.6 g/t silver and 2.66 g/t gold equivalent over 5.0m and vein averaged 0.90 g/t gold, 138.6 g/t silver and 2.75 g/t gold equivalent over 18.3m in the footwall portion of the vein beneath the stope.

"We are very encouraged to see so much of the Los Ricos vein remains in place so close to the surface. Underground mining in the early 1900's focused on the highest grade silver mineralization over widths of 1 to 3 meters, but they left 75 to 90% of the mineralization in place," stated Brad Langille, President and CEO.

Detailed intersections are in Table 1, and drill holes locations are included in Table 2.  A longitudinal section summary of all of the holes drilled at Los Ricos to date is available at https://gogoldresources.com/component/rsfiles/preview?path=diagrams/LosRicos_LongSec_20190625.pdf

Table 1:  Drill Hole Intersections

 

Hole ID

Comment

From

To

Length1

Au

Ag

AuEq2



(m)

(m)

(m)

(g/t)

(g/t)

(g/t)

LRGG-19-016

Main

80.8

85.8

5.0

0.52

160.6

2.66


Open Stope3

85.8

88.3

2.5

*

*

*


including

91.7

98.1

6.3

2.14

336.7

6.63

LRGG-19-017

Main

83.2

115.2

32.0

0.80

178.8

3.18


including

83.2

94.5

11.3

1.46

347.8

6.10



1.

Not true width

2.

AuEq converted using a silver to gold ratio of 75:1

3.

2.5m underground working, no sample

 

Table 2: Drill Hole Locations 

 

Hole ID

Easting

Northing

Elev

Azimuth

Dip

Final

LRGG-19-016

610672

2327555

1436

50

-50

150.00

LRGG-19-017

610706

2327519

1427

50

-60

130.50

 

GoGold commenced a 10,000 m diamond drilling program of HQ size core in conjunction with a field program of geological mapping, sampling and trenching on the property in March 2019. The core drilling campaign is focused on defining the mineralized halo around the historical high grade ore shoots as defined by the underground workings and the 65 historical RC drill holes on the property.

The diamond drill core (HQ size) is geologically logged, photographed and marked for sampling. When the sample lengths are determined, the full core is sawn with a diamond blade core saw with one half of the core being bagged and tagged for assay. The remaining half portion is returned to the core trays for storage and/or for metallurgical test work. 

The sealed and tagged sample bags are transported to the ActLabs facility in Zacatecas, Mexico. ActLabs crushes the samples and prepares 200-300 gram pulp samples with ninety percent passing Tyler 150 mesh (106μm). The pulps are assayed for gold using a 50 gram charge by fire assay (Code 1A2-50) and over limits greater than 10 grams per tonne are re-assayed using a gravimetric finish (Code 1A3-50). Silver and multi-element analysis is completed using total digestion (Code 1F2 Total Digestion ICP). Over limits greater than 100 grams per tonne silver are re-assayed using a gravimetric finish (Code 8-Ag FA-GRAV Ag).

Quality Assurance / Quality Control and Data Verification
Quality assurance and quality control ("QA/QC") procedures monitor the chain-of-custody of the samples and includes the systematic insertion and monitoring of appropriate reference materials (certified standards, blanks and duplicates) into the sample strings. The results of the assaying of the QA/QC material included in each batch are tracked to ensure the integrity of the assay data. All results stated in this announcement have passed GoGold's QA/QC protocols.

Mr. David Duncan, P. Geo. is the qualified person as defined by National Instrument 43-101 and is responsible for the technical information of this release.

About GoGold Resources
GoGold Resources (TSX: GGD) is a Canadian-based silver and gold producer focused on operating, developing, exploring and acquiring high quality projects in Mexico. The Company operates the Parral Tailings project in the state of Chihuahua and has the Los Ricos exploration project in the state of Jalisco. Headquartered in Halifax, NS, GoGold is building a portfolio of low cost, high margin projects. For more information visit gogoldresources.com.

CAUTIONARY STATEMENT:
The securities described herein have not been, and will not be, registered under the United States Securities Act of 1933, as amended (the "U.S. Securities Act"), or any state securities laws, and may not be offered or sold within the United States or to, or for the benefit of, U.S. persons (as defined in Regulation S under the U.S. Securities Act) except in compliance with the registration requirements of the U.S. Securities Act and applicable state securities laws or pursuant to exemptions therefrom. This release does not constitute an offer to sell or a solicitation of an offer to buy of any of GoGold's securities in the United States.

This news release may contain "forward-looking information" as defined in applicable Canadian securities legislation. All statements other than statements of historical fact, included in this release, including, without limitation, statements regarding the Parral tailings project, the Los Ricos project, future operating margins, future production and processing, and future plans and objectives of GoGold, constitute forward looking information that involve various risks and uncertainties. Forward-looking information is based on a number of factors and assumptions which have been used to develop such information but which may prove to be incorrect, including, but not limited to, assumptions in connection with the continuance of GoGold and its subsidiaries as a going concern, general economic and market conditions, mineral prices, the accuracy of mineral resource estimates, and the performance of the Parral project. There can be no assurance that such information will prove to be accurate and actual results and future events could differ materially from those anticipated in such forward-looking information.

Important factors that could cause actual results to differ materially from GoGold's expectations include exploration and development risks associated with GoGold's projects, the failure to establish estimated mineral resources or mineral reserves, volatility of commodity prices, variations of recovery rates, and global economic conditions. For additional information with respect to risk factors applicable to GoGold, reference should be made to GoGold's continuous disclosure materials filed from time to time with securities regulators, including, but not limited to, GoGold's Annual Information Form. The forward-looking information contained in this release is made as of the date of this release.

 

SOURCE GoGold Resources Inc.

View original content: http://www.newswire.ca/en/releases/archive/June2019/26/c2161.html

Copyright CNW Group 2019

Comment On!

140
Upload limit is up to 1mb only
To post messages to your Socail Media account, you must first give authorization from the websites. Select the platform you wish to connect your account to CanadianInsider.com (via Easy Blurb).