Global Atomic Receives Environmental Compliance Certificate for the Dasa Project and Renews Six Exploration Permits in the Republic of Niger

Ad blocking detected

Thank you for visiting CanadianInsider.com. We have detected you cannot see ads being served on our site due to blocking. Unfortunately, due to the high cost of data, we cannot serve the requested page without the accompanied ads.

If you have installed ad-blocking software, please disable it (sometimes a complete uninstall is necessary). Private browsing Firefox users should be able to disable tracking protection while visiting our website. Visit Mozilla support for more information. If you do not believe you have any ad-blocking software on your browser, you may want to try another browser, computer or internet service provider. Alternatively, you may consider the following if you want an ad-free experience.

Canadian Insider Ultra Club
$432/ year*
Daily Morning INK newsletter
+3 months archive
Canadian Market INK weekly newsletter
+3 months archive
30 publication downloads per month from the PDF store
Top 20 Gold, Top 30 Energy, Top 40 Stock downloads from the PDF store
All benefits of basic registration
No 3rd party display ads
JOIN THE CLUB

* Price is subject to applicable taxes.

Paid subscriptions and memberships are auto-renewing unless cancelled (easily done via the Account Settings Membership Status page after logging in). Once cancelled, a subscription or membership will terminate at the end of the current term.

Global Atomic Receives Environmental Compliance Certificate for the Dasa Project and Renews Six Exploration Permits in the Republic of Niger

Canada NewsWire

TORONTO, Jan. 28, 2021 /CNW/ - Global Atomic Corporation ("Global Atomic" or the "Company"), (TSX: GLO) (OTCQX: GLATF) (FRANKFURT: G12) announced that the Government of the Republic of Niger has issued an Environmental Compliance Certificate for the Dasa Uranium Project.  The Company has also received  three-year permit extensions  for each of its six Exploration properties in Niger, all of which have seen substantial exploration programs in the past. 

President and CEO of Global Atomic, Stephen G. Roman said, "The issuance of the Environmental Compliance Certificate along with the Dasa Mining Permit issued in December 2020, provide Global Atomic with the necessary Government approvals to advance the development of the Dasa Project towards commercial production.  We continue to work towards the completion of the Feasibility Study and have begun discussions with utilities with regard to off-take agreements and  financial institutions with regard to project financing.  We continue to target Q1 of 2022 to begin earthworks to build the mine."

The renewed exploration permits cover an area of 730 square kilometres on the following six Exploration Permit Areas:

  • Adrar Emoles 3 (AE3), 121.2 km2
  • Adrar Emoles 4 (AE4), 122.4 km2
  • Tin Negoran 1, 119.7 km2
  • Tin Negoran 2, 122.1 km2
  • Tin Negoran 3, 124.3 km2
  • Tin Negoran 4, 120.1 km2

With the discovery of the Dasa uranium deposit, the Company's focus in recent years has been on Dasa including the development of a uranium processing facility to support commercial production.  Within the AE3 Exploration Permit there remains significant potential to extend the known resources of the high-grade Dasa deposit along both strike and at depth.

There also exists a geological prospect within AE3 known as Dajy where historical drilling encountered prospective widths and grades within the Tarat stratigraphic unit, the same geological structure that hosts Orano Mining's Somaïr mine. Further potential exists along strike of the Isakanan prospect on the adjacent AE4 Exploration Permit.   Historical drilling on the Isakanan prospect outlined a formation that will be further drilled and tested for in-situ recovery (ISR) potential.

The Tin Negoran Exploration Permits have been the target of over 22,000 metres of drilling by Global Atomic.  Areas of extensive outcropping and near-surface mineralization will be further tested to determine the potential for open pit mining.  The Tin Negoran Exploration Permits are within 100 kilometres of the AE3 concession, which would enable Global Atomic to use the planned Dasa mill to potentially process Tin Negouran feedstock. All six Exploration Permit Areas lie within the Tim Mersoï Basin which has produced uranium for the Republic of Niger for the last 50 years.

In separate news, Global Atomic is pleased to announce it won the 24th position on the 2021 OTCQX® Best 50, a ranking of top performing companies traded on the OTCQX Best Market in 2020.   The OTCQX Best 50 is an annual ranking of the top 50 U.S. and international companies traded on the OTCQX market  based on an equal weighting of one-year total return and average daily dollar volume growth in the previous calendar year. 

About Global Atomic
Global Atomic Corporation (www.globalatomiccorp.com) is a publicly listed company that provides a unique combination of high-grade uranium mine development and cash-flowing zinc concentrate production.

The Company's Uranium Division includes four deposits with the flagship project being the large, high-grade Dasa Project, discovered in 2010 by Global Atomic geologists through grassroots field exploration. With the issuance of the Dasa Mining Permit, final design in support of the Company's Feasibility Study is on-going.

Global Atomics' Base Metals Division holds a 49% interest in the Befesa Silvermet Turkey, S.L. ("BST") Joint Venture, which operates a new, state of the art processing plant, located in Iskenderun, Turkey. The plant recovers zinc from Electric Arc Furnace Dust ("EAFD") to produce a high-grade zinc concentrate which is sold to smelters around the world. The Company's joint venture partner, Befesa Zinc S.A.U. ("Befesa") listed on the Frankfurt exchange under 'BFSA', holds a 51% interest in, and is the operator, of the BST Joint Venture. Befesa is a market leader in EAFD recycling, with approximately 50% of the European EAFD market and facilities located throughout Europe and Asia.

The information in this news release may contain forward-looking information under applicable securities laws.  Forward-looking information includes, but is not limited to, statements with respect to completion of any financings; Global Atomics' development potential and timetable of its operations, development and exploration assets; Global Atomics' ability to raise additional funds necessary; the future price of uranium; the estimation of mineral reserves and resources; conclusions of economic evaluation; the realization of mineral reserve estimates; the timing and amount of estimated future production, development and exploration; cost of future activities; capital and operating expenditures; success of exploration activities; mining or processing issues; currency exchange rates; government regulation of mining operations; and environmental and permitting risks.   Generally, forward-looking statements can be identified by the use of forward-looking terminology such as "plans", "is expected", "estimates", variations of such words and  phrases or statements that certain actions, events or results "could", "would", "might", "will be taken", "will begin", "will include", "are expected", "occur" or "be achieved".  All information contained in this news release, other than statements of current or historical fact, is forward-looking information.   Statements of forward-looking information are subject to known and unknown risks, uncertainties and other factors that may cause the actual results, level of activity, performance or achievements of Global Atomic to be materially different from those expressed or implied by such forward-looking statements, including but not limited to those risks described in the annual information form of Global Atomic and in its public documents filed on SEDAR from time to time.

Forward-looking statements are based on the opinions and estimates of management at the date such statements are made.  Although management of Global Atomic has attempted to identify important factors that could cause actual results to be materially different from those forward-looking statements, there may be other factors that cause results not to be as anticipated, estimated or intended.  There can be no assurance that such statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements.  Accordingly, readers should not place undue reliance upon forward-looking statements.  Global Atomic does not undertake to update any forward-looking statements, except in accordance with applicable securities law.  Readers should also review the risks and uncertainties sections of Global Atomics' annual and interim MD&As.

The Toronto Stock Exchange has not reviewed and does not accept responsibility for the adequacy and accuracy of this news release.

SOURCE Global Atomic Corporation

Cision View original content to download multimedia: http://www.newswire.ca/en/releases/archive/January2021/28/c6189.html

Copyright CNW Group 2021

Comment On!

140
Upload limit is up to 1mb only
To post messages to your Socail Media account, you must first give authorization from the websites. Select the platform you wish to connect your account to CanadianInsider.com (via Easy Blurb).