VANCOUVER, BC / ACCESSWIRE / July 23, 2020 / GATLING EXPLORATION INC. (TSXV:GTR)(OTCQX:GATGF) (the "Company" or "Gatling) is pleased to announce it will resume all exploration activities in August 2020, including drilling on its advanced Larder Gold Project in Ontario. The 13,000 meter, multi-phase program will target all three high-grade deposits along the 4.5 kilometer trend, as well as following up at the Kir Vit prospect, where the Company's first program hit mineralization in 13 out of 16 holes and discovered two new gold trends.
2020 Program at Fernland, Cheminis and Bear Deposits
2020 Program at Kir Vit Prospect
Nathan Tribble, VP Exploration for Gatling, commented, "Our first round of drilling at Larder was a great success and we have multiple targets lined up for the new program. Thanks to our extensive fieldwork and historical databank, we are excited about the growth prospects at our existing deposits, as well as at our new Kir Vit prospect."
Exploration at Regional Targets
Recent Achievements
Figure 1. Larder project long section showing the new gold mineralized zones identified from recent drill results and target areas for the 2020 drill campaign.
Figure 2. Geological map of the Larder project with new gold targets and structures.
Figure 3. Geological map of the Larder project with anomalous gold values in surface samples.
Figure 4. Processed regional magnetic survey with anomalous gold samples in surface samples.
Figure 5. Kir Vit plan map with geology, interpreted structures, anomalous gold in surface samples and 2019 drill results.
About Gatling Exploration
Gatling Exploration is a Canadian gold exploration company focused on advancing the Larder Gold Project, located in the prolific Abitibi greenstone belt in Northern Ontario. The Larder property hosts three high-grade gold deposits along the Cadillac-Larder Lake Break, 35 kilometers east of Kirkland Lake. The project is 100% controlled by Gatling and is comprised of patented and unpatented claims, leases and mining licenses of occupation within the McVittie and McGarry Townships. The 3,370 hectare project area is positioned 7 kilometers west of the Kerr Addison Mine, which produced 11 million ounces of gold. All parts of the Larder property are accessible by truck or all-terrain vehicles on non-serviced roads and trails.
Qualified Person
The technical content of this news release has been reviewed and approved by Nathan Tribble, P. Geo., VP Exploration of Gatling Exploration, and a Qualified Person pursuant to National Instrument 43-101.
ON BEHALF OF THE BOARD OF DIRECTORS,
Nav Dhaliwal, President and CEO
Gatling Exploration Inc.
For further information on Gatling, contact Investor Relations
Telephone: 1-888-316-1050
Email: [email protected]
Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.
Forward Looking Statements: Statements contained in this news release that are not historical facts are forward-looking statements, which are subject to a number of known and unknown risks, uncertainness and other factors that may cause the actual results to differ materially from those anticipated in our forward-looking statements. Although we believe that the expectations in our forward-looking statements are reasonable, actual results may vary, and we cannot guarantee future results, levels of activity, performance or achievements.
SOURCE: Gatling Exploration Inc.