Filo Mining drills 130 metres of 1.25% copper and 40 metres of 1.50 g/t gold at Filo del Sol

Ad blocking detected

Thank you for visiting CanadianInsider.com. We have detected you cannot see ads being served on our site due to blocking. Unfortunately, due to the high cost of data, we cannot serve the requested page without the accompanied ads.

If you have installed ad-blocking software, please disable it (sometimes a complete uninstall is necessary). Private browsing Firefox users should be able to disable tracking protection while visiting our website. Visit Mozilla support for more information. If you do not believe you have any ad-blocking software on your browser, you may want to try another browser, computer or internet service provider. Alternatively, you may consider the following if you want an ad-free experience.

Canadian Insider Ultra Club
$500/ year*
Daily Morning INK newsletter
+3 months archive
Canadian Market INK weekly newsletter
+3 months archive
30 publication downloads per month from the PDF store
Top 20 Gold, Top 30 Energy, Top 40 Stock downloads from the PDF store
All benefits of basic registration
No 3rd party display ads
JOIN THE CLUB

* Price is subject to applicable taxes.

Paid subscriptions and memberships are auto-renewing unless cancelled (easily done via the Account Settings Membership Status page after logging in). Once cancelled, a subscription or membership will terminate at the end of the current term.

Filo Mining drills 130 metres of 1.25% copper and 40 metres of 1.50 g/t gold at Filo del Sol

Canada NewsWire

Filo Logo (CNW Group/Filo Mining Corp.)

VANCOUVER, May 31, 2018 /CNW/ - Filo Mining Corp (TSX-V, Nasdaq First North: FIL) ("Filo Mining", "Filo", or the "Company") is pleased to announce the final assay results from the recently completed 2017/18 drill program at the Filo del Sol project in San Juan Province, Argentina and Region III, Chile.  A total of 9,411 metres was drilled during the program, which was completed at the end of March, 2018.  In total, 31 reverse circulation holes and 9 diamond drill holes were completed.  Assay results for the 9 diamond drill holes are presented here.  Results of the reverse circulation holes are contained in previous news releases dated April 27 and May 16, 2018. 

Highlights of Field Program:

  • Infill drilling is expected to convert a portion of the inferred oxide mineral resource to indicated
  • Step out drilling has extended mineralization beyond the current resource limits and it still remains open for expansion
  • Over 4.5 tonnes of material was collected for metallurgical, geotechnical and environmental testing in support of the Pre-Feasibility Study ("PFS") currently underway
  • Geotechnical drilling has been completed

A full table of the drill hole intersections, collar information and a plan map showing the locations of the drill holes are included within this release.

Highlights from this second batch of drill holes include:

FSDH016:

4m @ 0.22% Cu, 0.19 g/t Au, 1,001.0 g/t Ag

FSDH017A:

88m @ 0.95% Cu, 0.19 g/t Au, 43.4 g/t Ag

FSDH020: 

40m @ 0.02% Cu, 1.50 g/t Au, 3.0 g/t Ag

FSDH021: 

141m @ 0.98% Cu, 0.30 g/t Au, 56.7 g/t Ag

FSDH022: 

130m @ 1.25% Cu, 0.28 g/t Au, 1.5 g/t A


Including 

26m @ 4.98% Cu, 0.30 g/t Au, 0.7 g/t Ag

FSDH023:

72m @ 1.02% Cu, 0.26 g/t Au, 108.5 g/t Ag


Including

12m @ 1.24% Cu, 0.36 g/t Au, 628.8 g/t Ag

Commenting on today's results, Adam Lundin, CEO of Filo Mining stated, ""We are very pleased with the final drill results revealed from our 2017/18 field program at Filo del Sol. The results released today along with the first two sets of program results released in April and May of this year, respectively validate the Company's confidence in moving forward to complete an updated mineral resource estimate, and its in-progress efforts to release a Pre-Feasibility Study ("PFS") in early 2019."

Filo del Sol is a large high-sulphidation epithermal copper-gold-silver deposit.  The upper portion of the deposit is oxidized and includes from top to bottom, a gold oxide zone, a copper-gold oxide zone and a silver-rich zone.  The oxide portion of the deposit is underlain by copper-gold sulphide mineralization.  The drill holes reported here tested all of the oxide zones. 

One of the main goals of the 2017/18 drill program was to convert a part of the inferred oxide mineral resource to the indicated category.  Diamond drilling was used in order to collect coarse sample material for column leach metallurgical testwork, as well as for resource infill.  The mineral resource remains open laterally and to depth.  The holes in this release span a distance of 730 metres from FSDH021 in the south to FSDH022 in the north.

The Filo gold oxide zone was intersected by the upper part of FSDH017A (58m @ 1.09 g/t gold) and FSDH020 (122m @ 0.67 g/t Au) 140 metres to the north. 

Drill holes FSDH021 and FSDH023 intersected the southern high-grade copper zone within the indicated mineral resource, confirming the size and tenor of this zone and providing material for metallurgical testwork.  Hole FSDH017A intersected the northern high-grade copper zone, 400 metres northwest of FSDH021 and hole FSDH022 intersected a shallower high-grade zone 400 metres north of FSDH017A.  The intersection in FSDH022 included a very high-grade section of 8 metres that returned 12.8% Cu.  This zone remains open to the north.  Hole FSDH019 was abandoned just above the copper zone.       

Four of the holes intersected the silver zone, including another broad zone of near-surface mineralization starting at 30 metres down the hole in FSDH016 (62m @ 103.1 g/t silver).  The silver zone intersections included some very high silver values (4m @ 1,001.0 g/t Ag in FSDH016; 6m @ 798.7 g/t Ag in FSDH021 and 4m @ 1,498.0 g/t Ag in FSDH023) as is typical within this zone.  The silver zone intersections in holes FSDH021 and 023 are within the indicated mineral resource while those in FSDH016 and 017A are within the inferred mineral resource.

The results of the 2017/18 drilling will be incorporated into an updated mineral resource estimate to support the PFS which is currently underway.  The PFS follows the completion of a Preliminary Economic Assessment ("PEA") of the project, the results of which were released by the Company on November 28, 2017.  The PEA incorporated open-pit mining and heap leach processing of only the oxide portions of the deposit. The results of the PEA demonstrate a robust project with strong economics, highlighted by an estimated after-tax NPV of US$ 705 million using a discount rate of 8% and an IRR of 23%, with an average estimated annual life of mine production of approximately 50,000 tonnes of copper, 115,000 ounces of gold, and over 5 million ounces of silver. 

Diamond drill holes completed during the 2017/2018 program will contribute data for the mineral resource update and will also provide samples for metallurgical testwork forming an important part of the PFS.  Metallurgical sample material was also collected from surface trenches during the field program.  The PFS metallurgical testwork program is being carried out at SGS Minerals lab in Lakefield, Ontario and commenced in early April, 2018.  Ongoing environmental and social programs continue in support of the PFS and to lay the groundwork for future environmental assessments and project permitting.  

HOLE-ID

From
(m)

To (m)

Length
(m)

Cu %

Au g/t

Ag g/t

Zone

Purpose

FSDH016

30

92

62

0.21

0.18

103.1

Filo

Resource
Conversion
and Addition

incl

68

88

20

0.20

0.16

293.5

incl

82

86

4

0.22

0.19

1001.0

FSDH017A

108

218

110

0.02

0.72

6.8

Filo

Resource
Conversion
and Addition

incl

128

186

58

0.02

1.09

1.2

incl

160

162

2

0.03

11.70

1.0

incl

214

218

4

0.53

0.02

108.5

plus

248

336

88

0.95

0.19

43.4

incl

272

292

20

1.07

0.17

131.2

and incl

288

314

26

1.51

0.25

47.9

FSDH018A

2

20

18

0.04

0.81

0.8

Filo

Infill and
Metallurgy

incl

4

8

4

0.00

2.92

0.5

plus

142

162

20

0.02

0.92

1.0

incl

160

162

2

0.02

5.46

2.0

FSDH019

188

205

17

0.01

0.49

14.0

Filo

Infill

FSDH020

68

190

122

0.02

0.67

2.0

Filo

Infill and
Metallurgy

incl

138

178

40

0.02

1.50

3.0

incl

158

160

2

0.03

19.10

1.0

FSDH021

12

46

34

0.10

0.32

0.7

Filo

Infill and
Metallurgy

plus

84

90

6

0.07

0.86

2.0

plus

90

231

141

0.98

0.30

56.7

incl

90

166

76

1.39

0.31

87.2

incl

146

182

36

0.94

0.31

209.2

FSDH022

6

10

4

0.01

1.25

4.8

Filo

Infill and
Geotechnical

plus

98

228

130

1.25

0.28

1.5

incl

98

124

26

4.98

0.30

0.7

incl

108

116

8

12.84

0.36

0.9

FSDH023

70

96

26

0.07

1.08

2.2

Filo

Infill and
Metallurgy

plus

96

251

155

0.61

0.25

54.6

incl

96

168

72

1.02

0.26

108.5

incl

156

174

18

0.99

0.38

432.6

FSDH024

92

128

36

0.04

0.41

2.4

Filo

Resource
Conversion

plus

130

164

34

0.44

0.13

1.2

 

Mineralized zones within the Filo del Sol deposit are flat-lying, and drilled widths are interpreted to be greater than 95% of true widths.

The field program was carried out under the supervision of Bob Carmichael, B.A.Sc., P.Eng., who is the Qualified Person as defined by NI 43-101.  Mr. Carmichael is Vice President, Exploration for the Company and has reviewed and approved the technical information contained in this news release.

The Quality Control/Quality Assurance (QA/QC) program for the Filo del Sol Project is under the management of Diego Charchaflie MSc., P.Geo (BC), a Qualified Person pursuant to NI 43-101.

Samples were collected at the drill site by Company personnel with splitting carried out at the Company's field camp near the drill sites.  Individual samples represent final splits from 2 metre intervals down the hole.  Samples were delivered to the ALS preparation laboratory in Copiapo, Chile where samples were crushed and split and a 500g split was pulverized to 85% passing 200 mesh.  The prepared samples were sent to the ALS assay laboratory in Lima, Peru.  ALS is an accredited laboratory which is independent of the Company.  Gold analyses were by fire assay fusion with AAS finish on a 30g sample.  Copper and silver were analysed by atomic absorption following a 4 acid digestion.  Samples were also analyzed for a suite of 36 elements with ICP-ES and a sequential copper leach analysis was completed on each sample.  Copper and gold standards as well as blanks and duplicates (field, preparation and analysis) were randomly inserted into the sampling sequence for Quality Control.  On average, 9% of the submitted samples are Quality Control samples.

About Filo Mining Corp.

Filo Mining's flagship project is its 100% controlled Filo del Sol Project located on the border between San Juan Province, Argentina and Region III, Chile. Filo del Sol is located between the prolific Maricunga and El Indio Gold Belts, two major mineralized trends that contain such deposits as Caspiche, La Coipa, Veladero, and El Indio. The region is mining-friendly and hosts a number of large scale mining operations.  The project area is covered under the Mining Integration and Complementation Treaty between Chile and Argentina, which provides the framework for the development of cross border mining projects.

HOLE-ID

East

North

Elevation

Length
(m)

Azimuth

Dip

FSDH016

435204

6848107

5087

100.0

142

-90

FSDH017A

434996

6848499

5256

360.8

263

-66

FSDH018A

435006

6848398

5262

349.0

180

-73

FSDH019

435000

6848397

5265

204.6

249

-69

FSDH020

435000

6848600

5248

290.5

270

-88

FSDH021

434993

6848100

5155

230.5

270

-85

FSDH022

435097

6848787

5210

228.0

330

-68

FSDH023

434995

6848103

5154

250.5

25

-70

FSDH024

434994

6848200

5178

252.0

250

-70


 

Additional Information

Filo Mining is listed on the TSX-V and Nasdaq First North Exchange under the trading symbol "FIL".  Pareto Securities AB is the Company's Certified Adviser on Nasdaq First North.

The PEA study results in this press release are only intended to provide an initial, high-level summary of the project. The PEA is preliminary in nature and includes the use of inferred mineral resources, which are considered too speculative geologically to have the economic considerations applied to them that would enable them to be categorized as mineral reserves and there is no certainty that PEA results will be realized. Mineral resources are not mineral reserves and do not have demonstrated economic viability.

The Filo del Sol Project, the Mineral Resource estimate, and the PEA are described in a Technical Report titled "Independent Technical Report for a Preliminary Economic Assessment on the Filo del Sol Project, Region III, Chile and San Juan Province, Argentina" dated December 18, 2017, with an effective date of November 6, 2017 (the "Technical Report"), which was prepared for Filo Mining by SRK Consulting (Canada) Inc ("SRK").  The Technical Report is available for review under the Company's profile on SEDAR at www.sedar.com and on the Company's website at www.filo-mining.com.

This information is information that Filo Mining Corp. is obliged to make public pursuant to the EU Market Abuse Regulation. This information was submitted for publication, through the agency of the contact person set out below, on May 31, 2018 at 1:00 a.m. Pacific Standard Time.

On behalf of the Board of Directors of Filo Mining,

Adam I. Lundin
President and CEO

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Cautionary Note Regarding Forward-Looking Statements

Certain statements made and information contained herein in the press release constitutes "forward-looking information" and "forward-looking statements" within the meaning of applicable securities legislation (collectively, "forward-looking information"), concerning the business, operations and financial performance and condition of Filo Mining Corp. The forward-looking information contained in this press release is based on information available to the Company as of the date of this press release. Except as required under applicable securities legislation, the Company does not intend, and does not assume any obligation, to update this forward-looking information.  Generally, any statements that express or involve discussions with respect to predictions, expectations, beliefs, plans, projections, objectives, assumptions or future events or performance, (often, but not always, identified by words or phrases such as "plans", "expects" or "does not expect", "is expected", "budget", "scheduled", "estimates", "forecasts", "intends", "projects" , "estimates", "budgets", "scheduled", "forecasts", "assumes", "intends", "strategy", "goals", "objectives", "potential", "possible", "anticipates" or "does not anticipate", or "believes", or variations of such words and phrases or statements that certain actions, events, conditions or results "will", "may", "could", "would", "should", "might" or "will be taken", "will occur" or "will be achieved" or the negative connotations thereof and similar expressions) are not statements of historical fact and may be forward-looking statements.

All statements other than statements of historical fact may be forward-looking statements. Forward-looking information is necessarily based on estimates and assumptions that are inherently subject to known and unknown risks, uncertainties and other factors that may cause the actual results, level of activity, performance or achievements of the Company to be materially different from those expressed or implied by such forward-looking information, including but not limited to: risks and uncertainties relating to, among other things, the inherent uncertainties regarding mineral resource estimates, cost estimates, changes in commodity prices, currency fluctuation, financing, unanticipated resource grades, infrastructure, results of exploration activities, cost overruns, availability of financing, materials and equipment, timeliness of government approvals, taxation, political risk and related economic risk and unanticipated environmental impact on operations, as well as other risks and uncertainties more fully described under "Risk and Uncertainties" section of the Company's most recent MD&A and in the Company's most recent Annual Information Form under the heading "Risk Factors", and elsewhere, which are available under the Company's profile at www.sedar.com and on the Company's website.  These risks and uncertainties may cause the actual results, level of activity, performance or achievements of the Company to be materially different from those expressed or implied by such forward-looking information.

The Company believes that the expectations reflected in the forward-looking information included in this press release are reasonable, but no assurance can be given that these expectations will prove to be correct and such forward-looking information should not be unduly relied upon. This forward-looking information speaks as of the date of this press release. Forward-looking information in this news release includes, but is not limited to, statements regarding the Company's expectations with respect to conversion of inferred mineral resources to indicated mineral resources, timing of an updated mineral resource estimate to support a PFS,  the assumptions used in the mineral resource estimates for the Filo del Sol project; expected timing with respect to completion of a PFS, expectations with regard to potential for adding to mineral resources through exploration; estimations of commodity prices, mineral resources, and costs.

Statements relating to "mineral resources" are deemed to be forward looking information, as they involve the implied assessment, based on certain estimates and assumptions that the mineral resources described can be profitably produced in the future.

Forward-looking information is based on certain assumptions that the Company believes are reasonable, including that the current price of and demand for commodities will be sustained or will improve, the supply of commodities will remain stable, that the general business and economic conditions will not change in a material adverse manner, that financing will be available if and when needed on reasonable terms and that the Company will not experience any material labour dispute, accident, or failure of plant or equipment. These factors are not, and should not be construed as being, exhaustive. Although the Company has attempted to identify important factors that would cause actual results to differ materially from those contained in forward-looking information, there may be other factors that cause results not to be as anticipated, estimated, or intended. There can be no assurance that such statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. All forward-looking information contained in this document is qualified by these cautionary statements. Readers are cautioned not to place undue reliance on forward-looking information due to the inherent uncertainty thereof.

Filo Map - May 31 PR (CNW Group/Filo Mining Corp.)

SOURCE Filo Mining Corp.

View original content with multimedia: http://www.newswire.ca/en/releases/archive/May2018/31/c1135.html

Copyright CNW Group 2018

Comment On!

140
Upload limit is up to 1mb only
To post messages to your Socail Media account, you must first give authorization from the websites. Select the platform you wish to connect your account to CanadianInsider.com (via Easy Blurb).