Drill Mobilization Commences at Forum's Fir Island Uranium Project

Ad blocking detected

Thank you for visiting CanadianInsider.com. We have detected you cannot see ads being served on our site due to blocking. Unfortunately, due to the high cost of data, we cannot serve the requested page without the accompanied ads.

If you have installed ad-blocking software, please disable it (sometimes a complete uninstall is necessary). Private browsing Firefox users should be able to disable tracking protection while visiting our website. Visit Mozilla support for more information. If you do not believe you have any ad-blocking software on your browser, you may want to try another browser, computer or internet service provider. Alternatively, you may consider the following if you want an ad-free experience.

Canadian Insider Ultra Club
$432/ year*
Daily Morning INK newsletter
+3 months archive
Canadian Market INK weekly newsletter
+3 months archive
30 publication downloads per month from the PDF store
Top 20 Gold, Top 30 Energy, Top 40 Stock downloads from the PDF store
All benefits of basic registration
No 3rd party display ads
JOIN THE CLUB

* Price is subject to applicable taxes.

Paid subscriptions and memberships are auto-renewing unless cancelled (easily done via the Account Settings Membership Status page after logging in). Once cancelled, a subscription or membership will terminate at the end of the current term.

Vancouver, British Columbia--(Newsfile Corp. - January 20, 2021) -  Forum Energy Metals Corp. (TSXV: FMC) ("Forum" or "Company") is pleased to announce that ice road construction has commenced and two drills are being mobilized to site in preparation for a 6,000 metre (24 hole) drill program on its Fir Island project in northern Saskatchewan. This program is operated by Forum and funded 100% by Orano Canada Ltd. (formerly AREVA Resources Canada Ltd.).

The program is designed to test a number of targets along two major structures associated with the Snowbird Tectonic Zone, a major lineament that transects the Athabasca Basin and is associated with Cameco's Centennial Deposit at the south side of the basin. The targets have been developed by previous geophysical surveys (ground gravity, resistivity and EM), a soil sampling survey and diamond drilling in 2015 and 2020.

Depth to the unconformity on this project varies from 0 metres to 250 metres, and the two previous drill campaigns have identified a 30 to 50m offset of the unconformity (the Cathy Fault) that runs under Fir Island, and extends to the north under the lake, interpreted to intersect the major Black Lake Fault near the shoreline of the mainland (see Fig 1). The 2021 drill program will further investigate this fault that exhibits strong alteration, plastic and brittle deformation, elevated geochemical indicators and an abundance of dravite; a boron-rich clay that is present around most uranium deposits on the eastern side of the Athabasca Basin.

A temporary camp will be established on the island to minimize the commute to the drill site and to minimize contact with the local communities to comply with the current Covid restrictions. The program will last approximately 6 to 8 weeks once the drilling starts and should be complete by the end of March.

Ken Wheatley, P.Geo., Forum's VP, Exploration and Qualified Person under National Instrument 43-101, has reviewed and approved the contents of this news release.

About Forum Energy Metals

Forum Energy Metals Corp. (TSXV: FMC) has three 100% owned energy metal projects to be drilled in 2021 by the Company and its major mining company partners Rio Tinto Exploration Canada and Orano Canada Inc. for copper/silver, uranium and nickel/platinum/palladium in Saskatchewan, Canada's number one rated mining province for exploration and development. In addition, Forum has a portfolio of seven drill ready uranium projects in the Athabasca Basin and a strategic land position in the Idaho Cobalt Belt. For further information: www.forumenergymetals.com

Cannot view this image? Visit: https://orders.newsfilecorp.com/files/4908/72375_d8f24430a407a87a_003.jpg

Figure 1: Target Areas on the Fir Island Project.

To view an enhanced version of Figure 1, please visit:
https://orders.newsfilecorp.com/files/4908/72375_d8f24430a407a87a_003full.jpg

ON BEHALF OF THE BOARD OF DIRECTORS

Richard J. Mazur, P.Geo.
President & CEO

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

For further information contact:

NORTH AMERICA 

Rick Mazur, P.Geo., President & CEO
[email protected]

Tel: 778-772-3100


UNITED KINGDOM

Burns Singh Tennent-Bhohi, Director

[email protected]
Tel: 074-0316-3185

To view the source version of this press release, please visit https://www.newsfilecorp.com/release/72375

Comment On!

140
Upload limit is up to 1mb only
To post messages to your Socail Media account, you must first give authorization from the websites. Select the platform you wish to connect your account to CanadianInsider.com (via Easy Blurb).