CopAur Commences Drilling with Two Rigs Turning at Bolo Gold-Silver Project

Ad blocking detected

Thank you for visiting CanadianInsider.com. We have detected you cannot see ads being served on our site due to blocking. Unfortunately, due to the high cost of data, we cannot serve the requested page without the accompanied ads.

If you have installed ad-blocking software, please disable it (sometimes a complete uninstall is necessary). Private browsing Firefox users should be able to disable tracking protection while visiting our website. Visit Mozilla support for more information. If you do not believe you have any ad-blocking software on your browser, you may want to try another browser, computer or internet service provider. Alternatively, you may consider the following if you want an ad-free experience.

Canadian Insider Ultra Club
$500/ year*
Daily Morning INK newsletter
+3 months archive
Canadian Market INK weekly newsletter
+3 months archive
30 publication downloads per month from the PDF store
Top 20 Gold, Top 30 Energy, Top 40 Stock downloads from the PDF store
All benefits of basic registration
No 3rd party display ads
JOIN THE CLUB

* Price is subject to applicable taxes.

Paid subscriptions and memberships are auto-renewing unless cancelled (easily done via the Account Settings Membership Status page after logging in). Once cancelled, a subscription or membership will terminate at the end of the current term.

Vancouver, British Columbia--(Newsfile Corp. - November 29, 2022) - CopAur Minerals Inc. (TSXV: CPAU) (OTCQX: COPAF) ("CopAur" or the "Company") is pleased to report that its technical team has mobilized and that reverse circulation (RC) and diamond drilling are underway at the Bolo Gold-Silver Project ("Bolo" or the "Project"). The 2,275 meter combined RC and diamond drill program is expected to be completed before end of the year. The Bolo Project is located in the Hot Creek Range of Nye County, Nevada, 65 kilometres east-southeast of the producing Round Mountain Gold Mine1.

The 2022 Bolo drill program will comprise exploration drilling of new targets and expansion drilling at the South Mine Fault Zone, where recent drilling by the Company has yielded drill intercepts including 1.2 g/t Au over 122 m2. A total of 8 RC drill holes designed to test new Carlin gold geochemical pathfinder (arsenic ± antimony ± barium ± silver ± gold), jasperoid, and alteration anomalies along the prospective East Fault structure are planned; in addition to diamond drilling of 4 holes targeting the South Mine Fault Zone (Figure 1; see CopAur news release dated October 24th, 2022).

Jeremy Yaseniuk, CEO, commented, "The Company's work at Bolo integrating surface geochemical, geophysical, and remote satellite alteration mapping has defined numerous new robust greenfield drill targets. This measured and systematic approach to exploration targeting gives us excellent potential to expand the already significant footprint of drill-confirmed gold mineralization at Bolo. The Company also plans to drill our flagship Kinsley Mountain Project after we complete work at Bolo and will keep investors informed when this starts."

Cannot view this image? Visit: https://images.newsfilecorp.com/files/7895/146023_eb632b60b4622ba8_001.jpg

Figure 1: Bolo Gold-Silver Project 2022 Drilling Target Areas

To view an enhanced version of Figure 1, please visit:
https://images.newsfilecorp.com/files/7895/146023_eb632b60b4622ba8_001full.jpg

Qualified Person

The scientific and technical information contained in this news release has been reviewed and approved by Kristopher J. Raffle, P.Geo. (BC) Principal and Consultant of APEX Geoscience Ltd. of Edmonton, AB, a "Qualified Person" as defined in National Instrument 43-101 - Standards of Disclosure for Mineral Projects. Mr. Raffle has verified the data disclosed which includes a review of the sampling, analytical and test data underlying the information and opinions contained herein.

About CopAur Minerals Inc.

CPAU is an exploration company focused on developing projects within the emerging, mineral-rich mining regions of Nevada and British Columbia. The Company is backed by a dynamic and experienced team of resource professionals advancing multiple holdings across both regions; the flagship being Kinsley Mountain Gold Property, a Carlin-style project located 90 km south of the Long Canyon Mine (currently in production under the Newmont/Barrick Joint Venture, Nevada Gold Mines) and its 100% owned Williams Project that points to significant gold-copper potential within the prolific Golden Horseshoe of northern British Columbia, Canada. (For a full overview of projects please download CopAurPresenation).

For more information, please contact:

CopAur Minerals Inc.

Jeremy Yaseniuk, Chief Executive Officer & Director
Tel: +1 (604) 773-1467
Email: [email protected]

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this news release.

Forward Looking Information

This news release may contain certain "forward looking statements". Forward-looking statements involve known and unknown risks, uncertainties, assumptions and other factors that may cause the actual results, performance or achievements of the Company to be materially different from any future results, performance or achievements expressed or implied by the forward-looking statements. Any forward-looking statement speaks only as of the date of this news release and, except as may be required by applicable securities laws, the Company disclaims any intent or obligation to update any forward-looking statement, whether as a result of new information, future events or results or otherwise.


1 Not necessarily indicative of mineralization on CopAur Properties.
2 BL19-04. The true width of mineralization in most drill holes is estimated to be approximately 60-70% of drilled width. See Barrian Mining Corp. news release dated October 23, 2019.

To view the source version of this press release, please visit https://www.newsfilecorp.com/release/146023

Comment On!

140
Upload limit is up to 1mb only
To post messages to your Socail Media account, you must first give authorization from the websites. Select the platform you wish to connect your account to CanadianInsider.com (via Easy Blurb).