Conquest Discovers Cu-rich VMS system at the Belfast-TeckMag Project

Ad blocking detected

Thank you for visiting CanadianInsider.com. We have detected you cannot see ads being served on our site due to blocking. Unfortunately, due to the high cost of data, we cannot serve the requested page without the accompanied ads.

If you have installed ad-blocking software, please disable it (sometimes a complete uninstall is necessary). Private browsing Firefox users should be able to disable tracking protection while visiting our website. Visit Mozilla support for more information. If you do not believe you have any ad-blocking software on your browser, you may want to try another browser, computer or internet service provider. Alternatively, you may consider the following if you want an ad-free experience.

Canadian Insider Ultra Club
$500/ year*
Daily Morning INK newsletter
+3 months archive
Canadian Market INK weekly newsletter
+3 months archive
30 publication downloads per month from the PDF store
Top 20 Gold, Top 30 Energy, Top 40 Stock downloads from the PDF store
All benefits of basic registration
No 3rd party display ads
JOIN THE CLUB

* Price is subject to applicable taxes.

Paid subscriptions and memberships are auto-renewing unless cancelled (easily done via the Account Settings Membership Status page after logging in). Once cancelled, a subscription or membership will terminate at the end of the current term.

Toronto, Ontario--(Newsfile Corp. - October 20, 2021) - Conquest Resources Limited (TSXV: CQR) ("Conquest") is pleased to provide an update on its Phase 2 Drill Program on the Belfast-TeckMag Project.

In June 2021, Conquest announced the commencement of a 10,000 m diamond drill program on its 100% owned Belfast-TeckMag Project (Figure 1). To date, sixteen drill holes totaling an aggregate of 5,699 m have been completed that tested a variety of regional targets generated from Conquest's completion and interpretation of Geotech VTEM and regional magnetic surveys (2018, 2021), follow-up ground geophysical surveys, as well as targets generated from reviewing historical data. Assay results have been received for drill holes BC21-02 through to BC21-13, and are reported below. No significant results were returned for drill holes BC21-06, -09, -12, and -13.

Geochemically anomalous base metal and gold mineralization was encountered in the majority of the drill holes. Highlights include drill hole BC21-05 that intersected a low-grade copper zone that returned 0.24% Cu over a core length of 26.35 m hosted within a brecciated iron-rich sediment, including 1.35% Cu over 0.5 m, and drill hole BC21-11, located approximately 1 km east of BC21-05, that intersected multiple zones of anomalous copper mineralization from 62.55 m to 248.55 m. Significant gold mineralization was also intersected in BC21-04 that returned 4.55 g/t Au, 0.38% Cu over a core length of 0.35 m, and in drill hole BC21-11 that returned 5.32 g/t Au over 1.15 m (see Tables 1 and 2).

Down hole geophysical EM (BHEM) surveys have also been completed in drill holes BC21-02, BC21-05, BC21-11, and BC21-15. The downhole surveys in the BC21-05 to BC21-011 mineralized corridor have detected a widespread area of conductive, sulphide-bearing, source rocks within the Copper bearing horizon extending over an area of >200x200m extending from holes BC21-05 and BC21-11, and over depth intervals of 100 m and 200 m respectively. A detailed target interpretation of the geologic and geophysical data (VTEM, BHEM and vertical gradient magnetics) suggests a follow up drill program targeting the extents of the local West to East trending series of discrete magnetic signatures, which coincide with the location of the newly discovered Cu-rich VMS zone. Including the weaker responses, two local areas of anomalous VTEM response can be outlined and isolated from the Eaglerock and Emerald Lake areas (Figure 2, black dashed). Drill holes BC21-05 and BC21-11 intersected the anomalous copper horizon within the west to east oriented magnetic responses. The subsequent BHEM surveys reveal near field conductors that are also largely within the magnetic expressions and/or near magnetic edges. The follow up drill campaign for the BC21-05 and BC21-11 region will be to step out on the BHEM and VTEM conductors within the extents of the target magnetic features and at the edges, over a strike length of >1 km across the magnetic signatures/edges. A program of 8 to 10 drill holes totaling approximately 3000 m is planned (black crosses, Figure 2) with an approximate interhole distance of 225 m apart on the local magnetic high expressions, at edges or on descending mag expressions, as well as individual BHEM conductors, including two drill holes targeting offhole conductors, will also be drilled within 100 m of existing holes.

Joerg Kleinboeck, P.Geo., Conquest's Vice President of Exploration, stated that, "The widespread copper mineralization intersected in drill holes BC21-05 and BC21-11 is encouraging as it represents a new discovery that warrants further investigation. Drill crews will be mobilized back into this area in the next two weeks to follow up on the results from the recently completed downhole surveys."

Thomas Obradovich, Conquest's President and CEO stated, "After months of regional target testing it is gratifying to identify an area where we can increase our drill density on a well mineralized system with the goal of locating economic phases of a VMS system."

Table 1: Summary of Diamond Drill Results

DDHFrom (m)To (m)Core Length (m)Au (ppb)Ag (ppm)Cu (ppm)Pb (ppm)Zn (ppm)
BC21-02186.95189.312.3670.3782430
224.33227.853.52421.01019829
incl.225.25226.951.70461.21760320
BC21-03266.05279.0513.0050.3248110
incl.278.45279.050.60412.63090480
BC21-04233.15234.551.4012921.017031514
incl.234.2234.550.3545502.338103212
247.9250.552.656592.22372233
incl.248.85250.551.709492.93099245
BC21-0599.40100.000.60679.4990024236
111.75138.1026.35801.22385369
incl.111.75112.250.503589.8135004253
incl.119.20124.205.001261.33030672
incl.125.20127.202.00441.33730367
incl.129.00131.002.00441.442242104
154.20155.601.40591.11480245
171.50174.503.00330.6711162
231.80236.805.00320.81078237
BC21-0732.3033.000.7030.33950118
95.7096.350.6530.89890154
105.65106.651.0030.1974124
BC21-0820.0023.003.00140.2363140
129.00133.004.0080.44714749
incl.129.00129.7.000.70230.7917195
BC21-10114.40115.000.6030.3832551
138.75140.752.0030.2400323
186.50187.000.5035.0558019190
200.80202.651.8534.1553316282
incl.200.80201.650.8538.21090027472
BC21-1162.5569.106.5530.51452417
incl.62.5564.752.2030.92896630
83.00104.5521.5530.3498410
incl.83.0088.005.0030.3583411
incl.93.0098.105.1030.462857
122.25127.104.8530.3844320
incl.122.25124.902.6530.4921314
170.5173.653.1530.72075228
incl.173.10173.650.5531.86690478
187.25188.501.2530.2434219
193.00195.852.8524010.4486322
incl.194.70195.851.1553200.6300114
241.10248.557.4530.51283240
incl.242.20245.203.0030.61573244
incl.246.40248.552.1530.51602337

 

Table 2: Drill Hole Information

DDHEastingNorthingElevation (m)DipAzimuthLength (m)
BC21-025542575193644330-75270306
BC21-035540305193580318-7060297
BC21-045542315194927343-50195321
BC21-055544565195867386-60315249
BC21-065540185195924380-80330351
BC21-075562215196250318-80215201
BC21-085564065196435318-65235225
BC21-095566115196174318-6060378
BC21-105558605196088338-45180231
BC21-115555665196106363-8530270
BC21-125564545194800328-60250150
BC21-135565315194670328-85270150

 

Cannot view this image? Visit: https://orders.newsfilecorp.com/files/7183/100311_88cb8faf64edcb91_002.jpg

Figure 1- Locations of drill holes, Belfast-TeckMag Project

To view an enhanced version of this graphic, please visit:
https://orders.newsfilecorp.com/files/7183/100311_88cb8faf64edcb91_002full.jpg

Cannot view this image? Visit: https://orders.newsfilecorp.com/files/7183/100311_88cb8faf64edcb91_003.jpg

Figure 2- Magnetic, VTEM (black, yellow), BHEM (red) conductors are outlined within the VTEM conductors.

To view an enhanced version of this graphic, please visit:
https://orders.newsfilecorp.com/files/7183/100311_88cb8faf64edcb91_003full.jpg

QA/QC Program

Conquest has implemented a quality assurance/quality control (QA/QC) program for the Phase 2 diamond drill program.

Diamond drill core was logged, and where marked for sampling, cut in half, with one half placed in a labelled sample bag, and the remaining half placed back into the core tray and stored in a secured compound. A blank and a standard were inserted in the assay sampling sequence at every 10th place respectively. All samples were shipped to Activation Laboratories in Timmins, Ontario. Once the samples are received and dried at the laboratory, the samples are then crushed to 80% passing 10 mesh (2 mm) and then split into 250 g sub-sample size using a Jones Riffle Splitter. These sub-samples are then pulverized (using rings and pucks to 90% passing 200 mesh (0.075 mm) and homogenized prior to analysis. Gold analysis is performed using a 30 g charge by fire assay using lead collection with a silver inquart (1A2 package). The lower detection limit is 5 ppb, and the upper detection limit is 5000 ppb for this analysis. A gravimetric finish (1A3 package) is completed for any samples that return greater than 5000 ppb that includes crushing of the entire sample to -150 mesh and subsequently sieved through a 150 mesh screen. The entire +150 mesh portion is assayed, along with two duplicate cuts of the -150 mesh portion. Results are reported as a calculated weighted average of gold in the entire sample. Results for the 38 element ICP analysis (1E3 package) includes digesting 0.5 g of the sample with aqua regia for 2 hours at 95 °C. The sample is cooled and then diluted with deionized water. The samples are then analyzed using an Agilent 700 series ICP for the 38 element suite. QC for the digestion is 15% for each batch, 2 method reagent blanks, 6 in-house controls, 8 sample duplicates and 5 certified reference materials. An additional 20% QC is performed as part of the instrumental analysis to ensure quality in the areas of instrumental drift. If over limits for base metals are encountered, a sodium peroxide fusion, acid dissolution followed by ICP‐OES is completed.

Qualified Person

The technical content of this News Release has been reviewed and approved by Joerg Kleinboeck, P.Geo., a qualified person as defined in NI 43-101.

ABOUT CONQUEST

Conquest Resources Limited, incorporated in 1945, is a mineral exploration company that is exploring for base metals and gold on mineral properties in Ontario.

Conquest holds a 100% interest in the Belfast - Teck Mag Project, located in the Temagami Mining Camp at Emerald Lake, approximately 65 kilometers northeast of Sudbury, Ontario, which hosts the former Golden Rose Gold Mine and is underlain by highly prospective Abitibi greenstone geology along a strike length of seventeen (17) kilometers.

In October 2020, Conquest completed the acquisition of Canadian Continental Exploration Corp. which holds an extensive package of mining claims which surround Conquest's Golden Rose Mine, and subsequently doubled its land holdings in the Temagami Mining Camp through the staking of 588 mining cells, encompassing approximately 93 sq km., centered on Belfast Township, on the edge of the Temagami Magnetic Anomaly.

Conquest now controls over 350 sq km of underexplored territory, including the past producing Golden Rose Mine at Emerald Lake, situated in the Temagami Mining Camp.

Conquest also holds a 100% interest in the Alexander Gold Property located immediately east of the Red Lake and Campbell mines in the heart of the Red Lake Gold Camp on the important "Mine Trend" regional structure. Conquest's property is almost entirely surrounded by Evolution Mining land holdings.

In addition, Conquest owns a 100% interest in the Smith Lake Gold Property of six patented claims and 181 staked mining claims to the north, west and south of the former Renabie Gold Mine in Rennie Township in northern Ontario, operated by Corona and Barrick that had reported gold production of over 1,000,000 ounces between 1947 and 1991 (Northern Miner March 4, 1991).

FOR FURTHER INFORMATION CONTACT:

[email protected]
www.conquestresources.com

Tom Obradovich
President & Chief Executive
416-985-7140

Forward-looking statements. This news release may include certain "forward-looking statements". All statements other than statements of historical fact, included in this release, including, without limitation, statements regarding the completion of the Acquisition and the Consolidation, the release of escrowed funds, future cash on hand, potential mineralization, resources and reserves, exploration results, and future plans and objectives of Conquest, are forward-looking statements that involve various risks and uncertainties. There can be no assurance that such statements will prove to be accurate and actual results and future events could differ materially from those anticipated in such statements. Important factors that could cause actual results to differ materially from Conquest's expectations are exploration risks detailed herein and from time to time in the filings made by Conquest with securities regulators. Neither the TSXV nor its Regulation Services Provider (as defined in the policies of TSXV) accepts responsibility for the adequacy or accuracy of this release.

To view the source version of this press release, please visit https://www.newsfilecorp.com/release/100314

Comment On!

140
Upload limit is up to 1mb only
To post messages to your Socail Media account, you must first give authorization from the websites. Select the platform you wish to connect your account to CanadianInsider.com (via Easy Blurb).