CANTEX COMMENCES DRILLING AT NORTH RACKLA PROJECT, YUKON

Ad blocking detected

Thank you for visiting CanadianInsider.com. We have detected you cannot see ads being served on our site due to blocking. Unfortunately, due to the high cost of data, we cannot serve the requested page without the accompanied ads.

If you have installed ad-blocking software, please disable it (sometimes a complete uninstall is necessary). Private browsing Firefox users should be able to disable tracking protection while visiting our website. Visit Mozilla support for more information. If you do not believe you have any ad-blocking software on your browser, you may want to try another browser, computer or internet service provider. Alternatively, you may consider the following if you want an ad-free experience.

Canadian Insider Ultra Club
$500/ year*
Daily Morning INK newsletter
+3 months archive
Canadian Market INK weekly newsletter
+3 months archive
30 publication downloads per month from the PDF store
Top 20 Gold, Top 30 Energy, Top 40 Stock downloads from the PDF store
All benefits of basic registration
No 3rd party display ads
JOIN THE CLUB

* Price is subject to applicable taxes.

Paid subscriptions and memberships are auto-renewing unless cancelled (easily done via the Account Settings Membership Status page after logging in). Once cancelled, a subscription or membership will terminate at the end of the current term.

CANTEX COMMENCES DRILLING AT NORTH RACKLA PROJECT, YUKON

Canada NewsWire

KELOWNA, BC, May 25, 2022 /CNW/ - Cantex Mine Development Corp. (TSXV: CD) (the "Company") has commenced drilling at its 100-percent-owned 14,077 hectare North Rackla claim block in the Yukon.

Dr. Charles Fipke reports

Drilling Underway at GZ Zone

Cantex is pleased to announce that drilling has now commenced on its North Rackla project in the Yukon.  Currently, two drills are working on testing the GZ Zone at the Massive Sulphide project.  The maiden drill program here in 2021 encountered significant high-grade mineralization such as 16.05 metres of 24% lead-zinc and 101 g/t silver which included 3.7 metres of 60% lead-zinc and 336 g/t silver.

The area of the GZ Zone is covered in glacial sediments making soil-talus sampling and geological mapping not possible.  This season's drilling at the GZ Zone is targeted to better determine the geometry and control of this mineralization by drilling beneath the glacial cover.

Later in the season drilling will also be undertaken on the Main Zone to extend the 2.1km strike length.  Further drilling will also be undertaken on regional targets within the North Rackla claim block.

The Company looks forward to a productive field season.

The technical information and results reported here have been reviewed by Mr. Chad Ulansky P.Geo., a Qualified Person under National Instrument 43-101, who is responsible for the technical content of this release.

Signed,

Charles Fipke

Charles Fipke
Chairman

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release. Information set forth in this news release includes forward-looking statements under applicable securities laws. Forward-looking statements are statements that relate to future, not past, events. In this context, forward-looking statements often address expected future business and financial performance, and often contain words such as "anticipate", "believe", "plan", "estimate", "expect", and "intend", statements that an action or event "may", "might", "could", "should", or "will" be taken or occur, or other similar expressions. All statements, other than statements of historical fact, included herein are forward-looking statements. By their nature, forward-looking statements involve known and unknown risks, uncertainties and other factors which may cause the actual results, performance or achievements, or other future events, to be materially different from any future results, performance or achievements expressed or implied by such forward-looking statements. Such factors include, among others, risks identified in the management discussion and analysis section of the Company's interim and most recent annual financial statements or other reports and filings with Canadian securities regulators. Forward looking statements are made based on management's beliefs, estimates and opinions on the date that statements are made and the respective companies undertake no obligation to update forward-looking statements if these beliefs, estimates and opinions or other circumstances should change, except as required by applicable securities laws. Investors are cautioned against attributing undue certainty to forward-looking statements.

SOURCE Cantex Mine Development Corp.

Cision View original content to download multimedia: http://www.newswire.ca/en/releases/archive/May2022/25/c3990.html

Copyright CNW Group 2022

Comment On!

140
Upload limit is up to 1mb only
To post messages to your Socail Media account, you must first give authorization from the websites. Select the platform you wish to connect your account to CanadianInsider.com (via Easy Blurb).