Black Tusk Resources Inc. Permitting to Drill Up to 2,500 Metres Mogold and PG Highway Projects, Quebec

Ad blocking detected

Thank you for visiting CanadianInsider.com. We have detected you cannot see ads being served on our site due to blocking. Unfortunately, due to the high cost of data, we cannot serve the requested page without the accompanied ads.

If you have installed ad-blocking software, please disable it (sometimes a complete uninstall is necessary). Private browsing Firefox users should be able to disable tracking protection while visiting our website. Visit Mozilla support for more information. If you do not believe you have any ad-blocking software on your browser, you may want to try another browser, computer or internet service provider. Alternatively, you may consider the following if you want an ad-free experience.

Canadian Insider Ultra Club
$500/ year*
Daily Morning INK newsletter
+3 months archive
Canadian Market INK weekly newsletter
+3 months archive
30 publication downloads per month from the PDF store
Top 20 Gold, Top 30 Energy, Top 40 Stock downloads from the PDF store
All benefits of basic registration
No 3rd party display ads
JOIN THE CLUB

* Price is subject to applicable taxes.

Paid subscriptions and memberships are auto-renewing unless cancelled (easily done via the Account Settings Membership Status page after logging in). Once cancelled, a subscription or membership will terminate at the end of the current term.

VANCOUVER, BC / ACCESSWIRE / August 22, 2022 / Black Tusk Resources Inc. ("Black Tusk" or the "Company) (C:TUSK)(OTC Pink:BTKRF)(FRA:0NB) is pleased to announce that the company is in the process of obtaining permits to drill on their PG Highway and MoGold projects located north of Val d'Or, Quebec.

On the PG Highway property TMC Geophysique recently completed deep-penetrating Pulse-EM -Time Domain Electromagnetic (TDEM) surveying to cover zones targeted through geologic assessment and rock sampling. The TMC Geophysical report concludes that the newly acquired surface TDEM data identified of a group of strong conductive anomalies in places coincident with areas of rock exposures that contained significant percentages of pyrite and pyrrhotite. The geology along the trend is interpreted to have potential for Volcanogenic Massive Sulphide (VMS) mineralization (see News Release dated 2022-08-07). The zone of interest also displays magnetic features derived from Black Tusk 2021 surveys. The geophysical survey results combined with the geology and rock sampling provide compelling targets for further exploration.

The permit application for the PG Highway project, as submitted by Black Tusk, includes 6 drill pads with associated access roads. Black Tusk plans up to 2,000 metres of diamond drilling from the permitted drill pads, with VMS targets at proposed depths ranging from 50 to 300 metres below surface (as modelled by the EM survey).

On the MoGold project, the TMC report of findings from the TDEM survey identified six localized anomalies that are roughly grouped around the Boily-Bérubé mineral occurrence (see News Release dated July 12, 2022). This is also the area where Black Tusk exploration obtained rock samples that returned elevated values for silver, copper and zinc. The TDEM features are modelled as relatively shallow-seated bodies/targets. The permit application for the MoGold area includes 4 drill pads to allow up to 500 metres of diamond drilling for testing the relatively shallow targets.

Black Tusk exploration programs undertaken in Quebec are supervised by Dr. Mathieu Piché, OGQ, with office located north of Val d'Or. He is also a Black Tusk company director.

Cautionary Statement

This press release contains forward-looking statements based on assumptions as of that date. These statements reflect management's current estimates, beliefs, intentions and expectations; they are not guarantees of future performance. The Company cautions that all forward-looking statements are inherently uncertain and that actual performance may be affected by a number of material factors, many of which are beyond the Company's control. Such factors include, among other things: risks and uncertainties relating to exploration and development; the ability of the Company to obtain additional financing; the Company's limited operating history; the need to comply with environmental and governmental regulations; fluctuations in the prices of commodities; operating hazards and risks; competition and other risks and uncertainties, including those described in the Company's Prospectus dated September 8, 2017 available on www.sedar.com. Accordingly, actual and future events, conditions, and results may differ materially from the estimates, beliefs, intentions, and expectations expressed or implied in the forward-looking information. Except as required under applicable securities legislation, the Company undertakes no obligation to publicly update or revise forward-looking information.

On behalf of the Board of Directors

Richard Penn
CEO
(778) 384-8923

SOURCE: Black Tusk Resources Inc



View source version on accesswire.com:
https://www.accesswire.com/712965/Black-Tusk-Resources-Inc-Permitting-to-Drill-Up-to-2500-Metres-Mogold-and-PG-Highway-Projects-Quebec

Comment On!

140
Upload limit is up to 1mb only
To post messages to your Socail Media account, you must first give authorization from the websites. Select the platform you wish to connect your account to CanadianInsider.com (via Easy Blurb).