Benz Mining: Ruby Hill West Discovery Returns 26.4m At 1.01% Li2O From 7.4M Including 3.7m At 2.7% Li2O

Ad blocking detected

Thank you for visiting CanadianInsider.com. We have detected you cannot see ads being served on our site due to blocking. Unfortunately, due to the high cost of data, we cannot serve the requested page without the accompanied ads.

If you have installed ad-blocking software, please disable it (sometimes a complete uninstall is necessary). Private browsing Firefox users should be able to disable tracking protection while visiting our website. Visit Mozilla support for more information. If you do not believe you have any ad-blocking software on your browser, you may want to try another browser, computer or internet service provider. Alternatively, you may consider the following if you want an ad-free experience.

Canadian Insider Ultra Club
$500/ year*
Daily Morning INK newsletter
+3 months archive
Canadian Market INK weekly newsletter
+3 months archive
30 publication downloads per month from the PDF store
Top 20 Gold, Top 30 Energy, Top 40 Stock downloads from the PDF store
All benefits of basic registration
No 3rd party display ads
JOIN THE CLUB

* Price is subject to applicable taxes.

Paid subscriptions and memberships are auto-renewing unless cancelled (easily done via the Account Settings Membership Status page after logging in). Once cancelled, a subscription or membership will terminate at the end of the current term.

HIGHLIGHTS

  • High grade intercept from near surface in last drillhole of the April 2022 campaign
  • Assays for RHW22-006 returned:
    • 26.4m at 1.01% Li2O, 355ppm Ta2O5, 980ppm Cs, 1601ppm Rb2O from 7.4m;
    • including 12.7m at 1.29% Li2O, 423ppm Ta2O5, 1160ppm Rb2O, 600ppm Cs; and
    • 3.7m at 2.61% Li2O, 579ppm Ta2O5, 1061ppm Rb2O, 441ppm Cs
  • Very high-grade (+2.5% Li2O) with tantalum, rubidium and caesium association
  • RHW22-001, 002, 003 and 005 show lithium caesium tantalum (LCT) signatures confirming the presence of multiple dyke systems in the area
  • Hole RHW22-006 was collared directly into weathered pegmatite
  • Multiple newly identified outcrops surround the RHW22-006 collar
  • RHW22-006 potentially not collared optimally to fully test the pegmatite intrusion
  • Historical 2008 core discovered at the Eastmain site shows unsampled pegmatite intervals mistakenly referenced as granite up to 80m thick

Toronto, Ontario--(Newsfile Corp. - August 2, 2022) - Benz Mining Corp. (TSXV: BZ) (ASX: BNZ) (the Company or Benz) is pleased to provide an update on its lithium exploration activities. Assays for the 6 holes drilled in April 2022 at Ruby Hill West as part of Benz's maiden lithium drilling have been received and confirm thick high-grade pegmatite as well as the presence of multiple dykes system in the area.

Cannot view this image? Visit: https://images.newsfilecorp.com/files/1818/132478_4bb49e63945c187d_001.jpg

Figure 1: Spodumene bearing pegmatite in core, Ruby Hill West drilling RHW22-006. The interval returned 26.4m at 1.01% LiI2O from 7.4m including 3.7m at 2.7% Li2O.

To view an enhanced version of Figure 1, please visit:
https://images.newsfilecorp.com/files/1818/132478_4bb49e63945c187d_001full.jpg.

CEO, Xavier Braud, commented:

"These results prove that the Ruby Hill West pegmatite we drilled this year carries both grade and thickness. We are currently in the field at Ruby Hill West and Windy Mountain identifying more pegmatite outcrops and stripping the outcrops near last winter's drilling.

"We have seen some pretty spectacular spodumene mineralisation in outcrop near RHW22-006 collar with single spodumene crystals up to 50cm long.

"This region has been underexplored and we believe we can find more of those lithium bearing pegmatites, turning Ruby Hill West into a lithium camp for the benefit of Benz shareholders.

"Every campaign we have conducted has been successful and returned high grade gold and now high-grade lithium mineralisation. We will keep exploring and making discoveries in the Upper Eastmain Greenstone Belt, a new frontier area that Benz is bringing to the world's attention.

"Finding core from holes drilled in 2008 which has unsampled pegmatites is a welcome discovery. This pegmatite shows high rubidium and niobium content on a hand held XRF indicating probable fertility. Sometimes, discoveries are made in the core yard unearthing historical core and looking at it with a fresh eye."

Cannot view this image? Visit: https://images.newsfilecorp.com/files/1818/132478_4bb49e63945c187d_002.jpg

Figure 2: Ruby Hill West pegmatite, outcrop with 50cm long spodumene crystal

To view an enhanced version of Figure 2, please visit:
https://images.newsfilecorp.com/files/1818/132478_4bb49e63945c187d_002full.jpg.

Ruby Hill West Lithium Drilling Results

The Ruby Hill West Lithium Project is a surface occurrence of spodumene bearing LCT pegmatite within the Ruby Hill West Project, located 50km due west of the Eastmain exploration camp. The occurrence was first sampled in 2016 by Eastmain Resources and then by Quebec government geologists in 2018. Only limited sampling was conducted by both groups.

In the summer of 2021, a team of consultants working for Benz sampled the outcrop without sufficiently attempting to scrape the moss and other vegetation covering the underlying rocks.

The samples collected returned best assay values of:

  • 2.59% Li2O, 1970ppm Rb, 1030 ppm Ta, 7530 ppm Cs
  • 1.9% Li2O, 3160ppm Rb, 3820 ppm Cs, 274ppm Ta

Cannot view this image? Visit: https://images.newsfilecorp.com/files/1818/132478_4bb49e63945c187d_003.jpg

Figure 3: Spodumene rich part of RHW22-006 intercept, this part is from the 3.7m at 2.70% Li2O

To view an enhanced version of Figure 3, please visit:
https://images.newsfilecorp.com/files/1818/132478_4bb49e63945c187d_003full.jpg.

In March 2022, Benz conducted a drilling program at the Ruby Hill West lithium pegmatite prospect and reported a 31.2m interval of visible pegmatite with zones of visible spodumene in the drilling (ASX & TSX-V releases dated 29 April 2022 "Multiple spodumene pegmatites intersected at Ruby Hill West").

Drillholes RHW22-001, RHW22-002, RHW22-003 and RHW22-005 were drilled 100m apart from each other and targeted the geology at depth under lithium bearing pegmatite outcrop and sub-crop sampled in 2021.

The limited time spent on the outcrop during the 2021 campaign had not allowed for detailed exploration and the structural directions guiding drilling direction were inferred from historical airborne magnetics data. Those holes were located north west of the outcrop and drilled towards 155° azimuth.

Benz's best hole of the 2022 drilling campaign was RHW22-006 which returned 31.1m of pegmatite from near surface.

Assays for this hole returned:

  • 31.1m at 0.9% Li2O, 323ppm Ta2O5, 1093ppm Cs, 1558ppm Rb2O from 2.6m including:
    • 26.4m at 1.01% Li2O, 355ppm Ta2O5, 980ppm Cs, 1601ppm Rb2O from 7.35m
    • 12.7m at 1.29% Li2O, 423ppm Ta2O5, 600ppm Cs, 1156ppm Rb2O from 21m
    • 3.7m at 2.61% Li2O, 579ppm Ta2O5, 441ppm Cs, 1057ppm Rb2O from 30m

Hole RHW22-006, drilled only 4.0m away from hole RHW22-004 was collared directly into weathered pegmatite. Multiple newly identified outcrops surround the collar and it now looks like the hole was not collared optimally to fully test the intrusive pegmatite body.

Benz will have to reassess the geometry of the system as the pegmatite is potentially thicker than what was intercepted in hole RHW22-006.

Cannot view this image? Visit: https://images.newsfilecorp.com/files/1818/132478_4bb49e63945c187d_004.jpg

Figure 4: Schematic cross section with Benz's best result from RHW 2022 drilling campaign. Note, drillholes RWH22-003 and 004 are interpreted to be drilled below a pegmatite body dipping toward the reader and sub parallel to the section.

To view an enhanced version of Figure 4, please visit:
https://images.newsfilecorp.com/files/1818/132478_4bb49e63945c187d_004full.jpg.

Drillhole RHW22-004 was unfortunately collared in the host basalt 2m from the pegmatite/basalt contact and is believed to have been drilled continuously above the contact for the whole length of the hole.

Field observation conducted following extensive vegetation removal from the outcrops shows that there are two main bodies of spodumene bearing pegmatites and secondary dykes of lower size and importance. The current interpretation is that drillholes RWH22-001, 002, 003 and 005 were drilled at angles which could not adequately test the main body of pegmatite now at outcrop.

Cannot view this image? Visit: https://images.newsfilecorp.com/files/1818/132478_4bb49e63945c187d_005.jpg

Figure 5: April 2022 drilling with simplified drillhole geology over satellite image.

To view an enhanced version of Figure 5, please visit:
https://images.newsfilecorp.com/files/1818/132478_4bb49e63945c187d_005full.jpg.

Cannot view this image? Visit: https://images.newsfilecorp.com/files/1818/132478_4bb49e63945c187d_006.jpg

Figure 6: Schematic section of RHW22-005 with assays results.

To view an enhanced version of Figure 6, please visit:
https://images.newsfilecorp.com/files/1818/132478_4bb49e63945c187d_006full.jpg.

Cannot view this image? Visit: https://images.newsfilecorp.com/files/1818/132478_4bb49e63945c187d_007.jpg

Figure 7: Schematic section of RHW22-001. The hole may have been drilled below the main pegmatite intrusion body. The geometry of the main outcropping pegmatite body seems to be dipping towards the reader and be parallel to the current section with RHW22-001 having only intercepted small secondary cross cutting dykes.

To view an enhanced version of Figure 7, please visit:
https://images.newsfilecorp.com/files/1818/132478_4bb49e63945c187d_007full.jpg.

Cannot view this image? Visit: https://images.newsfilecorp.com/files/1818/132478_4bb49e63945c187d_008.jpg

Figure 8: Schematic section of RHW22-002 with assay results. The geometry of the main outcropping pegmatite body seems to be dipping towards the reader and be parallel to the current section with RHW22-002 having only intercepted small secondary cross cutting dykes.

To view an enhanced version of Figure 8, please visit:
https://images.newsfilecorp.com/files/1818/132478_4bb49e63945c187d_008full.jpg.

Cannot view this image? Visit: https://images.newsfilecorp.com/files/1818/132478_4bb49e63945c187d_009.jpg

Figure 9: Ruby Hill West, Summer 2022 - uncovering spodumene pegmatite.

To view an enhanced version of Figure 9, please visit:
https://images.newsfilecorp.com/files/1818/132478_4bb49e63945c187d_009full.jpg.

Cannot view this image? Visit: https://images.newsfilecorp.com/files/1818/132478_4bb49e63945c187d_010.jpg

Figure 10: RHW main pegmatite outcrop, removing cover allowed identification of a basalt/pegmatite contact (under the geologist's feet and allowed for the discovery of very large (+50cm euhedral and subhedral spodumene crystals) as shown by the geologist.

To view an enhanced version of Figure 10, please visit:
https://images.newsfilecorp.com/files/1818/132478_4bb49e63945c187d_010full.jpg.

Cannot view this image? Visit: https://images.newsfilecorp.com/files/1818/132478_4bb49e63945c187d_011.jpg

Figure 11: Uncovering RHW main pegmatite outcrop, located between drillholes RHW22-001,003 and 004 and potentially dipping parallel to the drillholes.

To view an enhanced version of Figure 11, please visit:
https://images.newsfilecorp.com/files/1818/132478_4bb49e63945c187d_011full.jpg.

Historical Drilling:

During a site inspection in late June 2022, core from a 2008 drilling campaign at Ruby Hill West was discovered in the core racks at the Eastmain mine site. Three holes had pegmatite core in the racks.

Cannot view this image? Visit: https://images.newsfilecorp.com/files/1818/132478_fig%2012%20benz_550.jpg

Figure 12: Racks with core from the 2008 drill campaign at Ruby Hill West - Note: Eastmain Decline in the background

To view an enhanced version of Figure 12, please visit:
https://images.newsfilecorp.com/files/1818/132478_fig%2012%20benz.jpg.

Cannot view this image? Visit: https://images.newsfilecorp.com/files/1818/132478_4bb49e63945c187d_015.jpg

Figure 13: RHW-08-003 core displaying pegmatite (80m of cumulative length).

To view an enhanced version of Figure 13 please visit:
https://images.newsfilecorp.com/files/1818/132478_4bb49e63945c187d_015full.jpg.

The 2008 drilling campaign led by Eastmain Resources at Ruby Hill West was targeting VTEM targets, interpreted from a 2005 airborne survey. A limited number of intervals were sampled and analysed for a suite of elements in the search for gold mineralisation.

In total, 3 holes (RH-08-002, RH-08-003, and RH-08-014) showed intervals of pegmatites in the core.

The core was never sampled or assayed for any other commodity and there is potential for the pegmatites in those three holes to be part of a system prospective for lithium and associated tantalum, caesium and rubidium.

Benz is currently cutting the core and samples will be submitted in due course to ALS Laboratories in Montreal for analysis by a suitable method.

Eastmain Gold Project

The Eastmain Gold Project, situated on the Upper Eastmain Greenstone Belt in Quebec, Canada, currently hosts a NI 43-101 and JORC (2012) compliant resource of 376,000oz at 7.9gpt gold (Indicated: 236,500oz at 8.2gpt gold, Inferred: 139,300oz at 7.5gpt gold). The existing gold mineralisation is associated with 15-20% semi-massive to massive pyrrhotite, pyrite and chalcopyrite in highly deformed and altered rocks making it amenable to detection using electromagnetic techniques. Multiple gold occurrences have been identified by previous explorers over a 12km long zone along strike from the Eastmain Mine with very limited but highly encouraging testing outside the existing resource area.

Cannot view this image? Visit: https://images.newsfilecorp.com/files/1818/132478_4bb49e63945c187d_016.jpg

Figure 14: Benz's tenure over Upper Eastmain Greenstone Belt simplified geology.

To view an enhanced version of Figure 14, please visit:
https://images.newsfilecorp.com/files/1818/132478_4bb49e63945c187d_016full.jpg.

This release was prepared under supervision and approved by Dr. Danielle Giovenazzo, P.Geo, acting as Benz's qualified person under National Instrument 43-101 for the reporting of exploration and drilling results.

This release was prepared under supervision and approved by Dr. Marat Abzalov, PGeo, holder of an OGQ temporary permit, acting as Benz's qualified person under National Instrument 43-101 for the purposes of exploration target compilation and calculation.

This release was prepared under supervision and approved by Mr Xavier Braud, PGeo, holder of an OGQ temporary permit, acting as Benz's qualified person under National Instrument 43-101 for the purposes of exploration results and field observations.

About Benz Mining Corp.

Benz Mining Corp. (TSXV: BZ) (ASX: BNZ) brings together an experienced team of geoscientists and finance professionals with a focused strategy to unlock the immense mineral potential of the Upper Eastmain Greenstone Belt in Northern Quebec, which is prospective for gold, lithium, nickel, copper and other high-value minerals. Benz is earning a 100% interest in the former producing high grade Eastmain gold mine, Ruby Hill West and Ruby Hill East Projects in Quebec and owns 100% of the Windy Mountain Project.

At the Eastmain Gold Project, Benz has identified a combination of over 380 modelled in-hole and off-hole DHEM conductors over a strike length of 6km which is open in all directions (final interpretation of some of the conductors still pending).

In 2021, Benz confirmed the presence of visible spodumene in a pegmatite at the Ruby Hill West Project, indicating lithium mineralisation which Benz intends to further explore in 2022.

This announcement has been approved for release by the Board of Directors of Benz Mining Corp.

For more information please contact:

Paul Fowler
Head of Corporate Development (Canada)
Benz Mining Corp.
Telephone: +1 416 356 8165
Email: [email protected]

Xavier Braud
CEO, Head of Corporate Development (Aus)
Benz Mining Corp.
Telephone +61 8 6143 6702 
email: [email protected]

Forward-Looking Information: Certain statements contained in this news release may constitute "forward-looking information" as such term is used in applicable Canadian securities laws. Forward-looking information is based on plans, expectations and estimates of management at the date the information is provided and is subject to certain factors and assumptions, including, that the Company's financial condition and development plans do not change as a result of unforeseen events and that the Company obtains regulatory approval. Forward-looking information is subject to a variety of risks and uncertainties and other factors that could cause plans, estimates and actual results to vary materially from those projected in such forward-looking information. Factors that could cause the forward-looking information in this news release to change or to be inaccurate include, but are not limited to, the risk that any of the assumptions referred to prove not to be valid or reliable, that occurrences such as those referred to above are realized and result in delays, or cessation in planned work, that the Company's financial condition and development plans change, and delays in regulatory approval, as well as the other risks and uncertainties applicable to the Company as set forth in the Company's continuous disclosure filings filed under the Company's profile at www.sedar.com. The Company undertakes no obligation to update these forward-looking statements, other than as required by applicable law.

NEITHER THE TSX VENTURE EXCHANGE NOR ITS REGULATION SERVICES PROVIDER (AS THAT TERM IS DEFINED IN THE POLICIES OF THE TSX VENTURE EXCHANGE) ACCEPTS RESPONSIBILITY FOR THE ACCURACY OR ADEQUACY OF THIS RELEASE.

Competent Person's Statements: The information in this report that relates to Exploration Results is based on and fairly represents information and supporting information compiled by Mr Xavier Braud, who is a member of the Australian Institute of Geoscientists (AIG membership ID:6963). Mr Braud is a consultant to the Company and has sufficient experience in the style of mineralisation and type of deposits under consideration and qualifies as a Competent Person as defined in the 2012 edition of the "Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves". Mr Braud holds securities in Benz Mining Corp and consents to the inclusion of all technical statements based on his information in the form and context in which they appear.

The information in this announcement that relates to the Inferred Mineral Resource was first reported under the JORC Code by the Company in its prospectus released to the ASX on 21 December 2020. The Company confirms that it is not aware of any new information or data that materially affects the information included in the original market announcement and confirms that all material assumptions and technical parameters underpinning the estimate continue to apply and have not materially changed. The Company confirms that the form and context in which the Competent Person's findings are presented have not been materially modified from the original market announcement

Appendix 1: Drilling data to date - Eastmain Mine

Table 1: Collar data from Ruby Hill West Pegmatite Drilling


DDH ID

AreaX-NAD83-
Z18N
Y- NAD83-
Z18N
ElevationAzimuthDipFinal
Depth
RHW22-001Ruby Hill West Pegmatite6584905796350540155-50170
RHW22-002Ruby Hill West Pegmatite6584455796330544155-50200
RHW22-003Ruby Hill West Pegmatite6585255796455534155-50250
RHW22-004Ruby Hill West Pegmatite6586145796219546335-50200
RHW22-005Ruby Hill West Pegmatite6583305796335554155-50200
RHW22-006Ruby Hill West Pegmatite6586145796219546155-50200

 


Table 2: Ruby Hill West Lithium Assays

DDH IDFromToLengthLi2O %Ta2O5 (ppm)Cs (ppm)Rb (ppm)
RHW22-00172.0072.971.000.08265377
RHW22-00172.9773.900.900.241561350686
RHW22-00173.9074.800.900.231171330655
RHW22-00174.8075.771.000.6619615401135
RHW22-00175.7776.600.800.169610601345
RHW22-00176.6077.450.900.221331050565
RHW22-00177.4578.551.100.07184431
RHW22-00178.5580.001.500.15119361558
RHW22-00180.0081.001.000.072653547
RHW22-00189.3090.301.000.05012199
RHW22-00190.3090.970.700.06471185
RHW22-00190.9792.101.100.1271310
RHW22-00192.1093.351.300.06124113
RHW22-00193.3595.352.000.061998109
RHW22-00195.3597.422.100.094547
RHW22-00197.4298.451.000.0110943
RHW22-00198.45100.001.600.085879
RHW22-00266.3367.331.000.10154209
RHW22-00267.3368.331.000.11160137196
RHW22-00268.3369.901.600.173431454
RHW22-00269.9071.001.100.66203387886
RHW22-00271.0072.001.000.421975871265
RHW22-00272.0073.101.100.76300832940
RHW22-00273.1074.000.900.293725101925
RHW22-00284.0085.001.000.0914103629
RHW22-00285.0086.001.000.12165286639
RHW22-00286.0087.001.000.1113213475
RHW22-00287.0088.601.600.157214455
RHW22-00288.6089.330.700.08215247308
RHW22-00289.3389.730.400.23620102880
RHW22-00289.7391.001.300.1818219701790
RHW22-00291.0092.001.000.04726785620
RHW22-00292.0093.001.000.503294632030
RHW22-003155.00156.501.500.017143
RHW22-003172.50173.000.500.048714175
RHW22-003173.80174.300.500.057422175
RHW22-00583.0083.500.500.00203360224
RHW22-005111.90112.800.900.0090165473
RHW22-005114.6115.10.50.03103740695
RHW22-005118118.50.50.00809131155
RHW22-005119.1120.71.60.0090409316
RHW22-005124.4124.90.50.047112601680
RHW22-005127.41280.60.141161125966
RHW22-005128128.60.60.11112984280
RHW22-005142.55143.510.24414051060
RHW22-005143.5144.651.20.161153933910
RHW22-0062.63.40.800.2435254526
RHW22-0063.44.51.100.4023725401785
RHW22-0064.561.500.3114215451115
RHW22-00667.351.400.2514921001240
RHW22-0067.3591.701.2321512852370
RHW22-006910.51.500.332164841895
RHW22-00610.511.91.401.412149691315
RHW22-00611.912.660.801.4319512501340
RHW22-00612.6613.651.000.251853451135
RHW22-00613.6514.61.000.2319015751925
RHW22-00614.615.61.000.772019221280
RHW22-00615.6171.401.0425913551635
RHW22-0061718.51.500.4348716151930
RHW22-00618.520.21.700.5649527802510
RHW22-00620.2210.800.3843415602440
RHW22-0062122.81.801.167098461075
RHW22-00622.8241.201.083951570980
RHW22-0062425.51.500.55213633902
RHW22-00625.5271.500.08354264770
RHW22-0062728.51.500.861964951865
RHW22-00628.5301.500.72223331974
RHW22-00630311.002.38521451986
RHW22-0063132.51.502.635265221080
RHW22-00632.533.71.202.76694331819
RHW22-00633.734.71.000.047382181180

 

To view the source version of this press release, please visit https://www.newsfilecorp.com/release/132478

Comment On!

140
Upload limit is up to 1mb only
To post messages to your Socail Media account, you must first give authorization from the websites. Select the platform you wish to connect your account to CanadianInsider.com (via Easy Blurb).