BacTech Receives Assay Results of Up to 2.24 Oz Gold Per Tonne

Ad blocking detected

Thank you for visiting CanadianInsider.com. We have detected you cannot see ads being served on our site due to blocking. Unfortunately, due to the high cost of data, we cannot serve the requested page without the accompanied ads.

If you have installed ad-blocking software, please disable it (sometimes a complete uninstall is necessary). Private browsing Firefox users should be able to disable tracking protection while visiting our website. Visit Mozilla support for more information. If you do not believe you have any ad-blocking software on your browser, you may want to try another browser, computer or internet service provider. Alternatively, you may consider the following if you want an ad-free experience.

Canadian Insider Ultra Club
$432/ year*
Daily Morning INK newsletter
+3 months archive
Canadian Market INK weekly newsletter
+3 months archive
30 publication downloads per month from the PDF store
Top 20 Gold, Top 30 Energy, Top 40 Stock downloads from the PDF store
All benefits of basic registration
No 3rd party display ads
JOIN THE CLUB

* Price is subject to applicable taxes.

Paid subscriptions and memberships are auto-renewing unless cancelled (easily done via the Account Settings Membership Status page after logging in). Once cancelled, a subscription or membership will terminate at the end of the current term.

(TheNewswire)



    

Toronto, Canada – TheNewswire - December 3, 2020

 

BacTech Environmental Corporation (OTC:BCCEF) (CSE:BAC) (CNSX:BAC.CN)(“BacTech or the Company”) today announced the assay results for the six concentrate samples collected from small mine producers in Ponce Enriquez, Ecuador. The area is known for its production of gold rich arsenopyrite material. The assay work was conducted by ALS Laboratories in Vancouver, Canada.

 

“The results were all relatively close to the stated grades provided by the miners at the time we collected the samples with a single exception,  the reason for which is being investigated.

 

“Now that we have confirmed the positive magnitudes, with respect to gold and arsenic values, we can begin the next phase of the project which will be the bioleach test work. Concentrate will be shipped to Perth, Australia where the test work will be conducted at ALS’ metallurgical  laboratory  under the guidance of BacTech’s Dr. Paul Miller. A full report of the test work will be available in 5-6 months from the onset of the test program,” concluded Orr.

   

Sample

Received Weight (kg)

Gold (ounces)/t

Value per tonne (contained Au)

$1900/oz

Silver (ounces)/t

Arsenic per tonne (%)

#1

0.25

1.19

$2260.00

4.55

1.24

#2

0.25

0.61

$1160.00

5.16

18.0

           *#3

0.26

2.24

$4256.00

4.20

33.0

         **#4

0.26

0.22

$418.00

0.65

  0.4

#5

0.27

0.90

$1710.00

2.70

14.9

#6

0.26

0.40

$760.00

1.39

6.45

* This sample reported 9.64% copper in concentrate

**It is assumed that sample #4 was incorrectly submitted as tailings material given the difference in gold value vs the other samples submitted for assay.

 

Sample #2 reported copper values of 9.64%. With the recent resurgence in the price of copper an investigation will be conducted to see if a copper by-product can be produced for sale. The most likely conclusion, with respect to the presence of copper, would be that the material is enargite. BacTech is considering shipping this material to Laurentian University to conduct a desk top study similar to the test program conducted on the original mineral samples from Ecuador. The test work would determine the ability of bioleaching to produce both gold and copper metal.

 

        An interesting aspect of the mineral processing in Ponce Enriquez has been identified by BacTech’s Bernardo Brito. Mr. Brito has been in active discussions with various mines sourcing concentrate for test work. A common theme of processing has emerged with respect to suppressing arsenic in the floating of concentrates to reduce the arsenic content and the associated penalties imposed by Asian smelters. This has the consequence of also suppressing gold recovery as the amount of gold that reports to the concentrate is below what normal flotation methods would provide. BacTech’s approach of not charging penalties on arsenic will allow the miner to produce a higher grade of gold concentrate. BacTech’s bioleach technology is highly amenable to treating concentrates with very high arsenic contents and therefore does not have the same constraint as producing concentrates for smelting.

 

“What we are seeing are the miners trying to tailor their production to lower the arsenic they deliver in the concentrates. This leads to lower gold grades in the concentrates and less value to the miner. We hope to change this by encouraging them to not worry about the arsenic grade and focus on gold recovery,” added Orr.

 

The bioleach test work to be conducted in Perth will involve three separate tests. Two samples of the material that were assayed in Vancouver at ALS had already been contacted with  cyanide by the miner to recover the gold that was not refractory. As high levels of  residual cyanide compounds  can be detrimental to the bacteria, these two sample will be subjected to a simple pre-treatment process before any bioleach test work is started. The third test will use a composite  of  samples which have not previously been subjected to cyanidation. From the reported samples it is recommended that bioleach test work be undertaken on samples #1, #3 and #5. According to assay records of the mine the magnitude of gold in sample #4  should be much higher.  Investigations will be pursued to evaluate the reasons for this anomaly.

 

        With respect to other projects being pursued by BacTech , the Company is still awaiting the reopening of travel within Colombia . When access is approved BacTech and MetalTec will engage a third-party for sampling of the gold/platinum tailings that was announced by BacTech on August 10, 2020.

 

In summary, BacTech is investigating the prospects of a build/own/operate bioleach facility to be based in Ponce Enriquez, Ecuador. The selection of Ponce Enriquez is driven by the extremely high levels of arsenic that is associated with gold in the +90 small mines in the area which attract high penalties in smelting . Presently, the miners are forced to sell their production at reduced prices to Asian buyers due to the high arsenic values in the concentrates and accept lower financial returns. BacTech proposes to pay better prices for the miners’ material, by eliminating penalties for arsenic, and process higher grade gold to reduce overall refining costs. This concept can be repeated in areas of Peru, Colombia and Central America where arsenic is known to exist alongside gold mining.

 

Qualified Person Statement

 

All technical information disclosed in this news release was approved by Gary Williams, MSc., P.Geo., who is a Qualified Person as defined by NI 43-101. He has reviewed and approved this news release.

 

ABOUT BACTECH

 

BacTech is promoting the use of its proprietary bioleach processing technology to treat historic arsenopyrite concentrates and tailings produced in the Ponce Enriquez area of Southern Ecuador. The Company is also awaiting the reduction in government imposed Covid restrictions in Colombia where BacTech will investigate a gold/platinum tailings project.

For further information contact:

Ross Orr,

President & CEO, BacTech Environmental Corporation

416-813-0303 ext. 222,

Cell 416-346-5529 and

Email: [email protected]

Website: www.bactechgreen.com

Follow us on:

Facebook http://www.facebook.com/BacTechGreen
Twitter
http://twitter.com/BacTechGreen

LinkedIn http://www.linkedin.com/company/1613873
Vimeo
 http://vimeo.com/bactechgreen
YouTube
 http://www.youtube.com/user/bactechgreen

Special Note Regarding Forward-Looking Statements

This news release contains “forward-looking information”, which may include, but is not limited to, statements with respect to future tailings sites, sampling or other investigations of tailing sites, the Company’s ability to make use of infrastructure around tailings sites or operating performance of the Company and its projects. Often, but not always, forward-looking statements can be identified using words such as “plans”, “expects”, “is expected”, “budget”, “scheduled”, “estimates”, “forecasts”, “intends”, “anticipates”, or believes” or variations (including negative variations) of such words and phrases, or state that certain actions, events or results “may”, “could”, “would”, “might” or “will” be taken, occur or be achieved. Forward-looking statements involve known and unknown risks, uncertainties and other factors which may cause the actual results, performance or achievements of the Company to be materially different from any future results, performance or achievements expressed or implied by the forward-looking statements. Forward-looking statements contained herein are made as of the date of this news release and the Company disclaims, other than as required by law, any obligation to update any forward-looking statements whether because of new information, results, future events, circumstances, or if management’s estimates or opinions should change, or otherwise. There can be no assurance that forward-looking statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Accordingly, the reader is cautioned not to place undue reliance on forward-looking statements.

 

Shares outstanding: 116,914,667

The Canadian Securities Exchange (CSE) has not reviewed and does not accept responsibility for the adequacy or the accuracy of the contents of this release.

This press release does not constitute an offer to sell or a solicitation of an offer to buy any of the shares, nor is it a solicitation of interest from a prospective investor.

           

Copyright (c) 2020 TheNewswire - All rights reserved.