Arbor Metals Completes Geochemical Program at Rakounga Gold Project, West Africa

Ad blocking detected

Thank you for visiting CanadianInsider.com. We have detected you cannot see ads being served on our site due to blocking. Unfortunately, due to the high cost of data, we cannot serve the requested page without the accompanied ads.

If you have installed ad-blocking software, please disable it (sometimes a complete uninstall is necessary). Private browsing Firefox users should be able to disable tracking protection while visiting our website. Visit Mozilla support for more information. If you do not believe you have any ad-blocking software on your browser, you may want to try another browser, computer or internet service provider. Alternatively, you may consider the following if you want an ad-free experience.

Canadian Insider Ultra Club
$432/ year*
Daily Morning INK newsletter
+3 months archive
Canadian Market INK weekly newsletter
+3 months archive
30 publication downloads per month from the PDF store
Top 20 Gold, Top 30 Energy, Top 40 Stock downloads from the PDF store
All benefits of basic registration
No 3rd party display ads
JOIN THE CLUB

* Price is subject to applicable taxes.

Paid subscriptions and memberships are auto-renewing unless cancelled (easily done via the Account Settings Membership Status page after logging in). Once cancelled, a subscription or membership will terminate at the end of the current term.

(TheNewswire)



  

Vancouver, Canada – TheNewswire - October 23, 2020 - Arbor Metals Corp. (the “Company”) (TSXV:ABR), (FWB:432) is pleased to announces that it has completed its recent soil grid geochemistry program at the 250-sq km Rakounga Gold Project (the “Project”), located in Burkina Faso, West Africa.

The 55-line kilometer soil geochemistry program was designed to extend the geochemical gold anomalies identified in 2019 and to test for continuity of these geochemical gold trends extending from the neighbouring Bouboulou permit which borders the Rakounga permit on the north.  The soil program collected a total of 779 samples which were collected at fifty metre stations on lines spaced 200 metres apart.  Samples were collected from depths which averaged 50 cm below the surface.

The program concentrated on filling in a gap between previous soil grid programs trending southwest, in a northeastern direction towards the Bouboulou 1 orpaillage (artisanal mining area) located along the concession boundary (see image below).  Samples were delivered to Activation Laboratories (“Actlabs”) Ouagadougou, an independent laboratory with ISO 9001: 2015 accreditation for analysis.  Results will be released once received, reviewed, and verified by the Company’s geological team.


Click Image To View Full Size

 

Image 1: Rakounga gold concession, existing PR Gold Trend, showing gap towards the Bouboulou 1 orpaillage

Warren Robb P.Geo., is the designated Qualified Person as defined by National Instrument 43-101 and is responsible for, and has approved, the technical information contained in this release.

About the Rakounga Gold Project

The Rakounga Gold Project consists of an exploration permit covering a two-hundred-and-fifty square kilometer area located along the Goren Greenstone Belt in central Burkina Faso.  The Company, through its wholly owned subsidiary Kruger Gold Corp. (“Kruger”), holds the right to acquire up to a one-hundred percent interest in and to the Project, subject only to pre-existing royalty obligations.  Kruger has control over operations conducted on the Project and will look to expand on historical drilling and survey work conducted on the Project.

For further information, contact Mark Ferguson, Chief Executive Officer, at [email protected], or visit the Company’s website at www.arbormetalscorp.com.

On behalf of the Board,

Arbor Metals Corp.

Mark Ferguson, Chief Executive Officer

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

This news release may contain certain “Forward-Looking Statements” within the meaning of the United States Private Securities Litigation Reform Act of 1995 and applicable Canadian securities laws.  When or if used in this news release, the words “anticipate”, “believe”, “estimate”, “expect”, “target, “plan”, “forecast”, “may”, “schedule” and similar words or expressions identify forward-looking statements or information.  These forward-looking statements or information may relate to finalization of a work program at the Project, the anticipated timing for the commencement of such a program, and other factors or information.  Such statements represent the Company’s current views with respect to future events and are necessarily based upon a number of assumptions and estimates that, while considered reasonable by the Company, are inherently subject to significant business, economic, competitive, political and social risks, contingencies and uncertainties. Many factors, both known and unknown, could cause results, performance or achievements to be materially different from the results, performance or achievements that are or may be expressed or implied by such forward-looking statements. The Company does not intend, and does not assume any obligation, to update these forward-looking statements or information to reflect changes in assumptions or changes in circumstances or any other events affecting such statements and information other than as required by applicable laws, rules and regulations.

Copyright (c) 2020 TheNewswire - All rights reserved.