Anaconda Mining Files Preliminary Economic Assessment Report for the Goldboro Gold Project

Ad blocking detected

Thank you for visiting CanadianInsider.com. We have detected you cannot see ads being served on our site due to blocking. Unfortunately, due to the high cost of data, we cannot serve the requested page without the accompanied ads.

If you have installed ad-blocking software, please disable it (sometimes a complete uninstall is necessary). Private browsing Firefox users should be able to disable tracking protection while visiting our website. Visit Mozilla support for more information. If you do not believe you have any ad-blocking software on your browser, you may want to try another browser, computer or internet service provider. Alternatively, you may consider the following if you want an ad-free experience.

Canadian Insider Ultra Club
$500/ year*
Daily Morning INK newsletter
+3 months archive
Canadian Market INK weekly newsletter
+3 months archive
30 publication downloads per month from the PDF store
Top 20 Gold, Top 30 Energy, Top 40 Stock downloads from the PDF store
All benefits of basic registration
No 3rd party display ads
JOIN THE CLUB

* Price is subject to applicable taxes.

Paid subscriptions and memberships are auto-renewing unless cancelled (easily done via the Account Settings Membership Status page after logging in). Once cancelled, a subscription or membership will terminate at the end of the current term.

Anaconda Mining Files Preliminary Economic Assessment Report for the Goldboro Gold Project

Canada NewsWire

TORONTO, March 2, 2018 /CNW/ - Anaconda Mining Inc. ("Anaconda" or the "Company") – (TSX:ANX) is pleased to announce the filing of a technical report prepared in accordance with National Instrument 43-101 regarding a Preliminary Economic Assessment ("PEA") for its 100%-owned Goldboro Gold Project ("Goldboro", or the "Project") in Nova Scotia, Canada.

The technical report is available under the Company's profile on SEDAR at www.sedar.com and on the Company's website at www.anacondamining.com.

Anaconda announced the results of this PEA on January 17, 2017, which included the following highlights:

  • Undiscounted cash flow before income and mining taxes of $189 million;
  • Pre-tax Net Present Value ("NPV") at a 7% discount rate of $120 million and a pre-tax Internal Rate of Return ("IRR") of 38% implying a pre-tax payback period of 2.9 years;
  • Total capital expenditures of $89 million, including pre-production capital expenditures of $47 million;
  • Undiscounted cash flow after income and mining taxes of $106 million;
  • After-tax NPV at a discount rate of 7% of $61 million and an after-tax IRR of 26%, implying an after-tax payback period of 3.4 years;
  • Life of mine ("LOM") of 8.8 years, with 2.4 million tonnes of potential mill feed at an average grade of 5.13 grams per tonne ("g/t") and recovery rate of 93.6%, resulting in gold production of 375,900 ounces;
  • Mining rate of 600 tonnes per day ("tpd") of mineralized material at an average open pit grade of 2.99 g/t and underground grade of 6.83 g/t; processing at 800 tpd (600 tpd of run-of-mine high-grade material and re-handle of 200 tpd of stockpiled open pit lower grade material);
  • Average annual gold production of 41,800 ounces with up to 62,000 ounces in year 5; and
  • LOM average operating cash cost of $654 per ounce* (~US$525 per ounce) and all-in sustaining cash cost of $797 per ounce* (~US$640 per ounce) at a 0.80 USD: CAD exchange rate.

*Refer to Non-IFRS Measures section below

The technical report, entitled "Anaconda Mining Inc., Goldboro Project Preliminary Economic Assessment" and which is dated March 2, 2018, was authored by independent qualified persons Joanne Robinson, P.Eng., Garth Liukko, P.Eng., and Sebastian Bertelegni, P.Eng., all of WSP Canada Inc., Michael Cullen, P.Geo. of Mercator Geological Services Inc., J. Dean Thibault, P.Eng., of Thibault & Associates Inc., and qualified person Gordana Slepcev, P.Eng., of Anaconda. 

Cautionary Statements

The PEA is preliminary in nature and includes the use of inferred mineral resources that are considered too speculative geologically to have the economic considerations applied to them that would enable them to be categorized as mineral reserves. Thus, there is no certainty that the results stated in the PEA will be realized. Actual results may vary, perhaps materially. Mineral resources that are not mineral reserves do not have demonstrated economic viability.

Qualified Persons

Gordana Slepcev, P. Eng., Chief Operating Officer, Anaconda Mining Inc., is a "qualified person" as such term is defined in National Instrument 43-101 and has reviewed and approved the technical information and data included in this press release.

A version of this news release will be available in French on Anaconda's website (www.anacondamining.com) in two to three business days.

ABOUT ANACONDA MINING INC.

Anaconda is a TSX-listed gold mining, development and exploration company, focused in the prospective Atlantic Canadian jurisdictions of Newfoundland and Nova Scotia. The Company operates the Point Rousse Project located in the Baie Verte Mining District in Newfoundland, comprised of the Pine Cove open pit mine, the fully-permitted Pine Cove Mill and tailings facility, the Stog'er Tight Mine, the Argyle Deposit, and approximately 5,800 hectares of prospective gold-bearing property. Anaconda is also developing the recently acquired Goldboro Project in Nova Scotia, a high-grade Mineral Resource, with the potential to leverage existing infrastructure at the Company's Point Rousse Project.

The Company also has a pipeline of organic growth opportunities, including the Viking and Great Northern Projects on the Northern Peninsula and the Tilt Cove Property on the Baie Verte Peninsula. 

FORWARD-LOOKING STATEMENTS
This news release contains "forward-looking information" within the meaning of applicable Canadian and United States securities legislation. Forward-looking information includes, but is not limited to, disclosure regarding the economics and project parameters presented in the PEA, including, without limitation, IRR, all-in sustaining costs, NPV and other costs and economic information, possible events, conditions or financial performance that is based on assumptions about future economic conditions and courses of action; the timing and costs of future development and exploration activities on the Company's projects; success of development and exploration activities; permitting time lines and requirements; time lines for further studies; planned exploration and development of properties and the results thereof; and planned expenditures and budgets and the execution thereof. Generally, forward-looking information can be identified by the use of forward-looking terminology such as "plans", "expects", or "does not expect", "is expected", "budget", "scheduled", "estimates", "forecasts", "intends", "anticipates", or "does not anticipate", or "believes" or variations of such words and phrases or state that certain actions, events or results "may", "could", "would", "might", or "will be taken", "occur", or "be achieved". Forward-looking information is based on the opinions and estimates of management at the date the information is made, and is based on a number of assumptions and is subject to known and unknown risks, uncertainties and other factors that may cause the actual results, level of activity, performance or achievements of Anaconda to be materially different from those expressed or implied by such forward-looking information, including the risks outlined in this news release, risks associated with the exploration, development and mining such as economic factors as they effect exploration, future commodity prices, changes in foreign exchange and interest rates, actual results of current production, development and exploration activities, government regulation, political or economic developments, environmental risks, permitting timelines, capital expenditures, operating or technical difficulties in connection with development activities, employee relations, the speculative nature of gold exploration and development, including the risks of diminishing quantities of grades of resources, contests over title to properties, and changes in project parameters as plans continue to be refined as well as those risk factors discussed in Anaconda's annual information form for the year ended May 31, 2017, available on www.sedar.com. Although Anaconda has attempted to identify important factors that could cause actual results to differ materially from those contained in forward-looking information, there may be other factors that cause results not to be as anticipated, estimated or intended. There can be no assurance that such information will prove to be accurate, as actual results and future events could differ materially from those anticipated in such information. Accordingly, readers should not place undue reliance on forward-looking information. Anaconda does not undertake to update any forward-looking information, except in accordance with applicable securities laws.

NON-IFRS MEASURES
Anaconda has included certain non-IFRS performance measures as detailed below. In the gold mining industry, these are common performance measures but may not be comparable to similar measures presented by other issuers. The Company believes that, in addition to conventional measures prepared in accordance with IFRS, certain investors use this information to evaluate the Company's performance and ability to generate cash flow. Accordingly, it is intended to provide additional information and should not be considered in isolation or as a substitute for measures of performance prepared in accordance with IFRS.

Operating Cash Costs per Ounce of Gold – Anaconda calculates operating cash costs per ounce by dividing operating expenses per the consolidated statement of operations, net of silver sales by-product revenue, by the gold ounces sold during the applicable period. Operating expenses include mine site operating costs such as mining, processing and administration as well as royalties, however excludes depletion and depreciation and rehabilitation costs.

All-In Sustaining Costs per Ounce of Gold – Anaconda has adopted an all-in sustaining cost performance measure that reflects all of the expenditures that are required to produce an ounce of gold from current operations. While there is no standardized meaning of the measure across the industry, the Company's definition conforms to the all-in sustaining cost definition as set out by the World Gold Council in its guidance dated June 27, 2013. The World Gold Council is a non-regulatory, non-profit organization established in 1987 whose members include global senior mining companies. The Company believes that this measure will be useful to external users in assessing operating performance and the ability to generate free cash flow from current operations.

The Company defines all-in sustaining costs as the sum of operating cash costs (per above), sustaining capital (capital required to maintain current operations at existing levels), corporate administration costs, sustaining exploration, and rehabilitation accretion and amortization related to current operations. All-in sustaining costs excludes capital expenditures for significant improvements at existing operations deemed to be expansionary in nature, exploration and evaluation related to growth projects, financing costs, debt repayments, and taxes. Canadian and US dollars are noted for realized gold price, operating cash costs per ounce of gold and all-in sustaining costs per ounce of gold. Both currencies are considered relevant and the Company uses the average foreign exchange rate for the period.

SOURCE Anaconda Mining Inc.

View original content: http://www.newswire.ca/en/releases/archive/March2018/02/c3469.html

Copyright CNW Group 2018

Comment On!

140
Upload limit is up to 1mb only
To post messages to your Socail Media account, you must first give authorization from the websites. Select the platform you wish to connect your account to CanadianInsider.com (via Easy Blurb).