Adventus and Salazar Announce Drilling Results at the El Domo Deposit Highlighted by 4.35% Copper Equivalent Over 67.0 Metres

Ad blocking detected

Thank you for visiting CanadianInsider.com. We have detected you cannot see ads being served on our site due to blocking. Unfortunately, due to the high cost of data, we cannot serve the requested page without the accompanied ads.

If you have installed ad-blocking software, please disable it (sometimes a complete uninstall is necessary). Private browsing Firefox users should be able to disable tracking protection while visiting our website. Visit Mozilla support for more information. If you do not believe you have any ad-blocking software on your browser, you may want to try another browser, computer or internet service provider. Alternatively, you may consider the following if you want an ad-free experience.

Canadian Insider Ultra Club
$500/ year*
Daily Morning INK newsletter
+3 months archive
Canadian Market INK weekly newsletter
+3 months archive
30 publication downloads per month from the PDF store
Top 20 Gold, Top 30 Energy, Top 40 Stock downloads from the PDF store
All benefits of basic registration
No 3rd party display ads
JOIN THE CLUB

* Price is subject to applicable taxes.

Paid subscriptions and memberships are auto-renewing unless cancelled (easily done via the Account Settings Membership Status page after logging in). Once cancelled, a subscription or membership will terminate at the end of the current term.

Adventus and Salazar Announce Drilling Results at the El Domo Deposit Highlighted by 4.35% Copper Equivalent Over 67.0 Metres

Canada NewsWire

TORONTO, June 1, 2021 /CNW/ - Adventus Mining Corporation ("Adventus") (TSXV: ADZN) (OTCQX: ADVZF) and Salazar Resources Limited ("Salazar") (TSXV: SRL) (OTCQB: SRLZF) (collectively the "Partners") are pleased to announce additional infill drilling results from the El Domo volcanogenic massive sulphide deposit ("El Domo") located within the 21,537-hectare Curipamba project in central Ecuador.

Highlights – Drill Results from the El Domo Deposit at Curipamba:

  • CURI-373 intersected 67.00 metres of 3.38% copper, 1.11 g/t gold, 0.41% zinc, 15.8 g/t silver, and 0.06% lead for 4.35% copper equivalent ("CuEq") – including 9.11 metres of 11.65% copper, 2.41 g/t gold, 0.16% zinc, 44.7 g/t silver, and 0.03% lead for 13.58% CuEq
  • CURI-374 intersected 5.56 metres of 2.32% copper, 15.37 g/t gold, 21.91% zinc, 403.0 g/t silver, and 3.09% lead for 22.58% CuEq – including 3.46 metres of 3.38% copper, 24.25 g/t gold, 34.44% zinc, 641.2 g/t silver, and 4.79% lead for 35.35% CuEq

Drill hole CURI-372 intersected semi-massive sulphide from 70.78 to 72.57 metres, grading 0.78% copper, 8.60 g/t gold, 7.84% zinc, 590.4 g/t silver, and 3.29% lead (14.45% CuEq). A section of mineralized footwall felsic autoclastic volcanic rocks was intersected from 72.57 to 78.78 metres, grading 0.13% copper, 1.41 g/t gold, 1.80% zinc, and 45.5 g/t silver and 0.33% lead (2.01% CuEq). Deeper in the mineralized footwall felsic volcanic rocks additional semi-massive to massive sulphide mineralization was intersected from 86.10 to 95.00 metres, grading 2.65% copper, 0.80 g/t gold, 1.46% zinc, 12.4 g/t silver and 0.04% lead (3.70% CuEq). A higher-grade subset was intersected from 87.75 to 89.81 metres, grading 6.71% copper, 0.44 g/t gold, 2.58% zinc, 17.9 g/t silver, and 0.01% lead (7.91% CuEq).

Drill Hole

From
(m)

To
(m)

Thickness
(m)

Cu
(%)

Au
(g/t)

Zn
(%)

Ag
(g/t)

Pb
(%)

CuEq (1)
(%)

Approx. True
Thickness (m)

CURI-372

70.78

72.57

1.79

0.78

8.60

7.84

590.4

3.29

14.45

1.52


72.57

78.78

6.21

0.13

1.41

1.80

45.5

0.33

2.01

5.28


86.10

95.00

8.90

2.65

0.80

1.46

12.4

0.04

3.70

7.57

Including

87.75

89.81

2.06

6.71

0.44

2.58

17.9

0.01

7.91

1.75



(1)

Metal equivalency based on US$4.48/lb Cu, US$1,886.30/oz Au, US$1.33/lb Zn, US$27.81/oz Ag and US$0.98/lb Pb; noting that no adjustments were made in the metal equivalency calculation for metal recovery. Prices taken from 6-month contracts for precious metals and 3-month contracts for base metals from the London Metal Exchange, dated May 25, 2021.

CURI-373 intersected semi-massive to massive sulphide mineralization was intersected from 102.00 to 169.00 metres, grading 3.38% copper, 1.11 g/t gold, 0.41% zinc, 15.8 g/t silver and 0.06% lead (4.35% CuEq). Three higher-grade subsets occur in this intercept, from 103.08 to 108.13 metres, 123.80 to 153.12 metres, and then from 133.39 to 142.50 metres. The first intercept is semi-massive sulphide mineralization grading 6.01% copper, 1.59 g/t gold, 1.53% zinc, 26.1 g/t silver and 0.14% lead (7.70% CuEq). The second intercept is massive sulphide mineralization grading 6.21% copper, 1.70 g/t gold, 0.15% zinc, 22.4 g/t silver and 0.04% lead (7.51% CuEq) and the third intercept is also massive sulphide mineralization grading, 11.65% copper, 2.41 g/t gold, 0.16% zinc, 44.7 g/t silver, and 0.03% lead (13.58% CuEq). A section of mineralized footwall felsic autoclastic volcanic rocks was intersected from 169.00 to 176.40 metres, grading 0.06% copper, 0.27 g/t gold, 0.41% zinc, and 9.2 g/t silver and 0.07% lead (0.45% CuEq).

Drill Hole

From
(m)

To
(m)

Thickness
(m)

Cu
(%)

Au
(g/t)

Zn
(%)

Ag
(g/t)

Pb
(%)

CuEq (1)
(%)

Approx. True
Thickness (m)

CURI-373

102.00

169.00

67.00

3.38

1.11

0.41

15.8

0.06

4.35

50.25

including

103.08

108.13

5.05

6.01

1.59

1.53

26.1

0.14

7.70

3.79

including

123.80

153.12

29.32

6.21

1.70

0.15

22.4

0.04

7.51

21.99

including

133.39

142.50

9.11

11.65

2.41

0.16

44.7

0.03

13.58

6.83


169.00

176.40

7.40

0.06

0.27

0.41

9.2

0.07

0.45

5.55



(1)

Metal equivalency based on US$4.48/lb Cu, US$1,886.30/oz Au, US$1.33/lb Zn, US$27.81/oz Ag and US$0.98/lb Pb; noting that no adjustments were made in the metal equivalency calculation for metal recovery. Prices taken from 6-month contracts for precious metals and 3-month contracts for base metals from the London Metal Exchange, dated May 25, 2021.

Drill hole CURI-374 intersected semi-massive sulphide from 92.54 to 98.10 metres, grading 2.32% copper, 15.37 g/t gold, 21.91% zinc, 403.0 g/t silver, and 3.09% lead (22.58% CuEq). A higher-grade subset was intersected from 92.54 to 96.00 metres, grading 3.38% copper, 24.25 g/t gold, 34.44% zinc, 641.2 g/t silver, and 4.79% lead (35.35% CuEq). A wide section of mineralized footwall felsic autoclastic volcanic rocks was intersected from 98.10 to 120.60 metres, grading 0.13% copper, 0.13 g/t gold, 1.19% zinc, and 4.6 g/t silver and 0.03% lead (0.61% CuEq).

Drill Hole

From
(m)

To
(m)

Thickness
(m)

Cu
(%)

Au
(g/t)

Zn
(%)

Ag
(g/t)

Pb
(%)

CuEq (1)
(%)

Approx. True
Thickness (m)

CURI-374

92.54

98.10

5.56

2.32

15.37

21.91

403.0

3.09

22.58

4.17

including

92.54

96.00

3.46

3.38

24.25

34.44

641.2

4.79

35.35

2.60


98.10

120.60

22.50

0.13

0.13

1.19

4.6

0.03

0.61

16.88



(1)

Metal equivalency based on US$4.48/lb Cu, US$1,886.30/oz Au, US$1.33/lb Zn, US$27.81/oz Ag and US$0.98/lb Pb; noting that no adjustments were made in the metal equivalency calculation for metal recovery. Prices taken from 6-month contracts for precious metals and 3-month contracts for base metals from the London Metal Exchange, dated May 25, 2021.

CURI-381 intersected massive sulphide mineralization from 123.16 to 127.21 metres, grading 3.13% copper, 0.59 g/t gold, 0.33% zinc, 30.6 g/t silver and 0.05% lead (3.88% CuEq). A higher-grade subset occurs from 124.20 to 126.33 metres, grading 4.34% copper, 0.65 g/t gold, 0.05% zinc, 33.5 g/t silver and 0.02% lead (5.06% CuEq).

Drill Hole

From
(m)

To
(m)

Thickness
(m)

Cu
(%)

Au
(g/t)

Zn
(%)

Ag
(g/t)

Pb
(%)

CuEq (1)
(%)

Approx. True
Thickness (m)

CURI-381

123.16

127.21

4.05

3.13

0.59

0.33

30.6

0.05

3.88

2.63

including

124.20

126.33

2.13

4.34

0.65

0.05

33.5

0.02

5.06

1.38



(1)

Metal equivalency based on US$4.48/lb Cu, US$1,886.30/oz Au, US$1.33/lb Zn, US$27.81/oz Ag and US$0.98/lb Pb; noting that no adjustments were made in the metal equivalency calculation for metal recovery. Prices taken from 6-month contracts for precious metals and 3-month contracts for base metals from the London Metal Exchange, dated May 25, 2021.

All results from the completed infill definition drilling program are to be used in updating the Mineral Resource estimate for El Domo in 2021. The updated Mineral Resource estimate will be part of the ongoing feasibility study for the development of the El Domo (see December 2, 2020 news release). Figure 1 illustrates the drill locations for the results of the four drill holes outlined in this news release and the holes currently in the assay lab, or in progress. Drill collar location coordinates are summarized for the infill and geomechanical drilling programs in Table 1 at the end of this news release.

For reference, the last Mineral Resource estimate completed in accordance with NI 43-101 for El Domo was published as part of the preliminary economic assessment report titled: "Technical Report on the Preliminary Economic Assessment for the Curipamba Project – El Domo Deposit, Central Ecuador", with an effective date of June 14, 2019 on SEDAR.

Technical Information and QAQC
The Curipamba project work program is being managed and reviewed by Vice President Exploration, Jason Dunning, M.Sc., P.Geo., a Qualified Person within the meaning of NI 43-101. Salazar staff collect and process samples that are securely sealed and shipped to Bureau Veritas ("BV") in Quito for sample preparation that includes crushing and milling to prepare pulps that are then split for shipment to their facility in Lima, Peru or Vancouver, Canada for analysis. All assay data have undergone internal validation of QAQC; noting there is an established sampling control program with blind insertion of assay blanks, certified industry standards and sample duplicates for the Curipamba project. A QAQC program is also in place at BV and includes insertion of blanks, standards, and duplicate reanalysis of selected samples.  BV's quality system complies with the requirements for the International Standards ISO 9001:2000 and ISO 17025: 1999. At BV, samples from the El Domo infill drilling have gold analyzed by classic fire assay techniques with an AAS finish, while silver and base metals are analyzed by a 44-element aqua regia technique with ICP-AES finish. For regional drilling, silver and base metals are analyzed by a 45-element 4 acid technique with ICP-MS finish. Overlimit protocols are in place for gold, silver, copper, lead, and zinc. 

Qualified Person
The technical information of this news release has been reviewed and verified as accurate by Mr. Jason Dunning, M.Sc., P.Geo., Vice President Exploration for Adventus, a non-Independent Qualified Person, as defined by NI 43-101.

About Adventus
Adventus Mining Corporation is an Ecuador focused copper-gold exploration and development company. Its strategic shareholders include Altius Minerals Corporation, Greenstone Resources LP, Wheaton Precious Metals Corp., and the Nobis Group of Ecuador. Adventus is advancing the El Domo copper-gold project through a feasibility study, while exploring the broader Curipamba district. In addition, Adventus is engaged in a country-wide exploration alliance with its partners in Ecuador, which has incorporated the Pijili and Santiago copper-gold porphyry projects to date. Adventus also controls an exploration project portfolio in Ireland with South32 Limited as funding partner as well as an investment portfolio of equities in several exploration companies. Adventus is based in Toronto, Canada, and is listed on the TSX Venture Exchange under the symbol ADZN and trades on the OTCQX under the symbol ADVZF.  

About Salazar
Salazar Resources Limited is focused on creating value and positive change through discovery, exploration, and development in Ecuador. The team has an unrivalled understanding of the geology in-country and has played an integral role in the discovery of many of the major projects in Ecuador, including the two newest operating gold and copper mines. Salazar Resources has a wholly owned pipeline of copper-gold exploration projects across Ecuador with a strategy to make another commercial discovery and farm-out non-core assets. The Company actively engages with Ecuadorian communities and together with the Salazar family it co-founded The Salazar Foundation, an independent non-profit organization dedicated to sustainable progress through economic development.  The Company already has carried interests in three projects. At its maiden discovery, Curipamba, Salazar Resources has a 25% stake fully carried through to production.  At two copper-gold porphyry projects, Pijili and Santiago, the Company has a 20% stake fully carried through to a construction decision.

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this news release.

This press release contains "forward -looking information" within the meaning of applicable Canadian securities laws. Any statements that express or involve discussions with respect to predictions, expectations, beliefs, plans, projections, objectives, assumptions or future events or performance (often, but not always, identified by words or phrases such as "believes", "anticipates", "expects", "is expected", "scheduled", "estimates", "pending", "intends", "plans", "forecasts", "targets", or "hopes", or variations of such words and phrases or statements that certain actions, events or results "may", "could", "would", "will", "should" "might", "will be taken", or "occur" and similar expressions) are not statements of historical fact and may be forward-looking statements.

Forward-looking information herein includes, but is not limited to, statements that address activities, events, or developments that Adventus and Salazar expect or anticipate will or may occur in the future. Although Adventus and Salazar have attempted to identify important factors that could cause actual actions, events, or results to differ materially from those described in forward-looking information, there may be other factors that cause actions, events or results not to be as anticipated, estimated, or intended. There can be no assurance that such information will prove to be accurate, and actual results and future events could differ materially from those anticipated in such information. Accordingly, readers should not place undue reliance on forward-looking information. Adventus and Salazar undertake to update any forward-looking information except in accordance with applicable securities laws.

Table 1: Drill Collar Information for Infill Drill Holes at El Domo

Hole ID

EAST

NORTH

ELEV

AZIMUTH

DIP

DEPTH

COMMENT

CURI-391

655001

9854898

882

165

-65

70.6

Successfully completed per design

CURI-390

695109

9855451

953

170

-79

137.7

Successfully completed per design

CURI-389

694999

9855351

908

338

-70

64.5

Successfully completed per design

CURI-388

695051

9855474

930

165

-50.6

143.0

Successfully completed per design

CURI-387

695051

9855474

930

26

-49

112.3

Successfully completed per design

CURI-386

695100

9855600

943

230

-65

90.2

Successfully completed per design

CURI-385

695094

9855482

940

45

-54

128.0

Successfully completed per design

CURI-384

695054

9855642

923

136

-54

110.6

Successfully completed per design

CURI-383(1)

695373

9855400

995

270

-65

210.4

Successfully completed per design

CURI-382

695094

9855482

940

64

-48

156.5

Successfully completed per design

CURI-381

695214

9855602

949

197

-57

154.4

Successfully completed per design

CURI-380(1)

695375

9855000

1030

270

-70

250.1

Successfully completed per design

CURI-379

695094

9855482

940

167

-48

153.8

Successfully completed per design

CURI-378

695054

9855122

893

181

-57

113.1

Successfully completed per design

CURI-377

695054

9855122

893

55

-51

92.3

Successfully completed per design

CURI-376(1)

695361

9855100

1087

270

-70

275.4

Successfully completed per design

CURI-375(1)

695333

9855200

1057

270

-75

250.1

Successfully completed per design

CURI-374

695006

9855134

883

296

-45

120.6

Successfully completed per design

CURI-373

695094

9855482

940

103

-48

197.0

Successfully completed per design

CURI-372

695041

9854913

888

38

-45

106.3

Successfully completed per design

CURI-371(1)

695399

9855298

1016

270

-65

225.7

Successfully completed per design

CURI-370

695040

9854913

888

231

-74

86.2

Successfully completed per design

CURI-369

695094

9855482

940

142

-48

168.7

Successfully completed per design

CURI-368

695041

9854913

888

331

-58

113.6

Successfully completed per design

CURI-367

695006

9855134

883

196

-45

102.2

Successfully completed per design

CURI-366

694975

9854918

872

186

-72

74.5

Successfully completed per design

CURI-365

694934

9855242

874

151

-72

69.5

Successfully completed per design

CURI-364-A

695131

9855402

946

108

-60

121.8

Successful but lost in fault zone

CURI-364

695134

9855402

946

108

-60

130.4

Successful but lost in fault zone

CURI-363

694934

9855242

874

180

-54

95.0

Successfully completed per design

CURI-362

694975

9854918

872

288

-61

88.9

Successfully completed per design

CURI-361

695134

9855402

946

75

-54

172.8

Successfully completed per design

CURI-360

694934

9855242

874

25

-48

83.0

Successfully completed per design

CURI-359

695006

9855134

883

349

-69

86.5

Successfully completed per design

CURI-358

694934

9855082

867

255

-54

113.0

Successfully completed per design

CURI-357

695057

9855149

894

229

-74

105.0

Successfully completed per design

CURI-356

695006

9855134

883

241

-77

110.6

Successfully completed per design

CURI-355

695057

9855149

894

36

-45

86.3

Successfully completed per design

CURI-354

695057

9855149

894

55

-54

81.0

Successfully completed per design

CURI-353

695094

9855122

908

192

-45

97.4

Successfully completed per design

CURI-352

695057

9855149

894

306

-77

78.0

Successfully completed per design

CURI-351

695057

9855149

894

338

-59

77.0

Successfully completed per design

CURI-350

695094

9855122

908

180

-57

85.7

Successfully completed per design

CURI-349

695094

9855122

908

263

-51

130.2

Successfully completed per design

CURI-348

695094

9855082

910

276

-45

135.1

Successfully completed per design

CURI-347

695094

9855082

910

105

-54

91.0

Successfully completed per design

CURI-346

695094

9855082

910

52

-69

83.4

Successfully completed per design

CURI-345

695094

9855082

910

142

-48

95.7

Successfully completed per design

CURI-344

695094

9855082

910

360

-60

84.1

Successfully completed per design

CURI-343

695094

9855082

910

192

-45

142.0

Successfully completed per design

CURI-342

695041

9854913

888

346

-45

137.1

Successfully completed per design

CURI-341

695134

9854922

917

360

-60

117.4

Successfully completed per design

CURI-340

695134

9854922

917

360

-45

149.0

Successfully completed per design



Notes:

(1)

Geomechanical drill hole for open pit engineering design purposes only; being drilled in addition to the Infill program

(2)

All drill holes are surveyed in UTM Datum (Provisional South American 1956, Zone 17)

Adventus Mining Corporation (ADZN-tsxv) (ADVZF-otcqx) (AZC-Frankfurt)
Drill hole (CURI-374) - 3.38% copper, 24.25 g/t gold, 34.44% zinc, 641.2 g/t silver, and 4.79% lead for 35.35% CuEq 

(see June 1, 2021 news release) (CNW Group/Adventus Mining Corporation)

Figure 1: Drill Collar Location Map for Drill El Domo (CNW Group/Adventus Mining Corporation)

SOURCE Adventus Mining Corporation

Cision View original content to download multimedia: http://www.newswire.ca/en/releases/archive/June2021/01/c3651.html

Copyright CNW Group 2021

Comment On!

140
Upload limit is up to 1mb only
To post messages to your Socail Media account, you must first give authorization from the websites. Select the platform you wish to connect your account to CanadianInsider.com (via Easy Blurb).