ADDING MULTIMEDIA Piñon Midstream Secures MRV Approval from the EPA for Carbon Capture and Sequestration Operations at its Dark Horse Treating Facility

Ad blocking detected

Thank you for visiting CanadianInsider.com. We have detected you cannot see ads being served on our site due to blocking. Unfortunately, due to the high cost of data, we cannot serve the requested page without the accompanied ads.

If you have installed ad-blocking software, please disable it (sometimes a complete uninstall is necessary). Private browsing Firefox users should be able to disable tracking protection while visiting our website. Visit Mozilla support for more information. If you do not believe you have any ad-blocking software on your browser, you may want to try another browser, computer or internet service provider. Alternatively, you may consider the following if you want an ad-free experience.

Canadian Insider Ultra Club
$432/ year*
Daily Morning INK newsletter
+3 months archive
Canadian Market INK weekly newsletter
+3 months archive
30 publication downloads per month from the PDF store
Top 20 Gold, Top 30 Energy, Top 40 Stock downloads from the PDF store
All benefits of basic registration
No 3rd party display ads
JOIN THE CLUB

* Price is subject to applicable taxes.

Paid subscriptions and memberships are auto-renewing unless cancelled (easily done via the Account Settings Membership Status page after logging in). Once cancelled, a subscription or membership will terminate at the end of the current term.

Jun 18, 2024 11:08 am
HOUSTON -- 

Piñon Midstream, LLC (“Piñon”) is pleased to announce that it has received approval from the United States Environmental Protection Agency (“EPA”) for its monitoring, reporting and verification (“MRV”) plan for the permanent sequestration of carbon dioxide (“CO2”), a greenhouse gas, in its two acid gas injection (“AGI”) wells located at Piñon’s Dark Horse Treating Facility in Lea County, New Mexico.

This press release features multimedia. View the full release here: https://www.businesswire.com/news/home/20240618953332/en/

Piñon Midstream's Carbon Management Infrastructure at the Dark Horse Treating Facility. Source: Piñon Midstream

Piñon Midstream's Carbon Management Infrastructure at the Dark Horse Treating Facility. Source: Piñon Midstream

Piñon’s Dark Horse Treating Facility is the largest AGI system that is currently permitted and operating in the state of New Mexico. Both of Piñon’s AGI wells—Independence AGI #1 and Independence AGI #2—are Devonian wells, reaching depths of approximately 18,000 feet (3.4 miles) below the surface into rock formations located several thousand feet below water aquifers and existing Delaware Basin oil and natural gas producing formations.

The two AGI wells are permitted for a combined 20 million cubic feet per day (20 MMcf/d) of CO2 and hydrogen sulfide (“H2S”) injection, which equates to ~250,000 metric tons (“MT”) of CO2 and ~110,000 MT of H2S annually based on current gas compositions. These two wells provide sequestration redundancy for Delaware Basin operators who use Piñon’s scalable and centralized treatment and sequestration facility to mitigate flaring and unlock valuable drilling inventory in the area.

Piñon’s approved MRV plan, which became effective June 15, 2024, provides a full description of technical procedures for sequestration, monitoring, and verification that have been put in place at the Dark Horse Treating Facility to ensure permanent sequestration. The approved MRV plan also satisfies a major requirement for Piñon’s eligibility to receive 45Q and enhanced tax credits in accordance with the Inflation Reduction Act of 2022.

“Piñon was founded to create sustainable and scalable sour gas infrastructure solutions,” said Piñon’s Chief Executive Officer Steven Green. “Having now received both the MRV plan approval from the EPA and an NSR air permit from the State of New Mexico, and with our most recent capacity expansions up and running, we believe we are in position to become the Delaware Basin’s leading sour gas treating and carbon management provider,” Green said.

From inception in August 2021 through 2023, Piñon has reduced the environmental impact of oil and natural gas production through the capture and permanent geologic sequestration of ~160,000 MT of CO2 and ~65,000 MT of H2S, which is the annual emissions equivalent of approximately 35,000 vehicles or 21,000 households. At its current operational rate, Piñon’s Dark Horse Treating Facility is projected to capture and sequester more than 190,000 MT of CO2 and 90,000 MT of H2S over the next twelve months.

About Piñon Midstream

Piñon Midstream was formed in 2020 through an initial equity commitment from Black Bay Energy Capital, to offer sustainable and cost-effective solutions for sour natural gas production in the Delaware Basin. Piñon provides a comprehensive suite of services, including fully NACE compliant field gathering and compression, amine treating, permanent sequestration of CO2 and H2S, sour condensate stabilization and marketing, and high-pressure redelivery of treated natural gas to multiple regional processing facilities and producers. For more information, please visit pinonmidstream.com.

Media:
Redbird Communications
Bevo Beaven
Mobile: 720-666-5064
Email: [email protected]

Comment On!

140
Upload limit is up to 1mb only
To post messages to your Socail Media account, you must first give authorization from the websites. Select the platform you wish to connect your account to CanadianInsider.com (via Easy Blurb).